| Location: | California |
|---|---|
| Posted: | Mar 17, 2026 |
| Due: | Mar 19, 2026 |
| Agency: | Contra Costa County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Prebid Date | 3/2/26 10:00am |
| Bid Date | 3/19/26 2:00pm |
Contra Costa County
General work description: The work to be done generally consists of replacing a timber bridge with a reinforced concrete bridge with concrete pile foundations and two soldier pile retaining walls. Work includes constructing temporary stream diversion system, detour road, rock slope protection, drainage systems, guard railing, grading and paving. Construction will occur over one season.
Engineer's cost estimate: $2,475,000
Number of Working Days: 110

With GovernmentContracts, you can:
...Project: Crane Creek Fiddleneck Drainage Riparian Enahancement Project Ref. #: EV-BB-26-001... the Riparian ...
Sonoma-Marin Area Rail Transit
Bid Due: 6/23/2026
...RFx Name: BPM013226 RFx Begin Date (UTC+0): RFI - COUNTYWIDE DRAINAGE ASSET COLLECTION ...
San Diego County
Bid Due: 7/17/2026
...Project: Crane Creek Fiddleneck Drainage Riparian Enhancement Project Ref. #: EV-BB-26-001... the Riparian ...
Sonoma-Marin Area Rail Transit
Bid Due: 6/23/2026
...project will include the installation of a new 24-inch HDPE storm drain pipe ...
Napa County
Bid Due: 7/07/2026