| Location: | Washington |
|---|---|
| Posted: | Jul 21, 2026 |
| Due: | Aug 11, 2026 |
| Agency: | City of Port Angeles |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | TR0220 |
| Publication URL: | To access bid details, please log in. |
| Bid Number: |
TR0220
|
| Bid Title: |
Systemic Intersection Improvements - Traffic Circle Program RFQ
|
| Category: | Public Works |
| Status: | Open |
|
City of Port Angeles
Public Works and Utilities
Request for Qualifications
(RFQ)
Professional Consulting Services for:
Traffic Circle Program
One-Block Off Arterial Intersection Control
TR0220
HSIP-000S (740)
Qualifications Due:
Tuesday, August 11, 2026 by 5:00 p.m.
City of Port Angeles
Department of Public Works - Engineering
Attn: Timothy Hayes, P.E., Engineer III
321 E 5th Street
Port Angeles, WA 98362
thayes@cityofpa.us
360.417.4827
STATEMENT OF PURPOSE
The City of Port Angeles (City) is seeking qualified firms to perform engineering design services for a
residential safety improvement project along several corridors which have a documented history of
crashes. The priority corridors include Laurel Street between 9th and 3rd Streets, 6th Street between Vine
and Oak Streets, and E 2nd Street at S Francis and S Washington Streets. Along these corridors, a program
of mini roundabouts will be implemented at 4-way intersections. The primary focus of the project is to
improve yielding at intersections and reduce the severity of crashes that do occur. The selected consulting
firm will perform engineering design of the safety improvement project as well as support City staff with
public meetings, and open houses.
BACKGROUND INFORMATION
The Laurel/6th/2nd corridors are residential streets located one block off major arterials that experience
higher-than-typical traffic volumes due to their use as cut-through routes and have a documented history
of crashes at uncontrolled intersections. Improved safety measures by means of mini roundabouts are
necessary to provide traffic calming and reduce the severity of crashes.
The City has obtained a federal grant for funding through the Washington State Department of
Transportation's Highway Safety Improvement Program (HSIP). Utilizing this grant funding along with City
funding will enhance intersection safety along these critical corridors. FHWA requires that all HSIP funded
projects are ADA compliant upon completion or the federal funds must be repaid.
The selected Consultant will work with the City to produce plans, specifications, & estimates, assist the
City with public meetings and open houses.
SCOPE OF WORK
The selected firm will be responsible for all aspects of the traffic circle design and the PS&E package,
including surveying, engineering, completion of environmental documentation and any necessary
permits. Work may also include construction inspection or management during the construction phase.
The PS&E package must adhere to City and federal standards.
Under the general direction of the City Engineer or designee, qualified firm(s) shall be responsible for, but
not limited to the following tasks:
* Environmental Documentation & Permitting
* 30% Design Package, Plans, and Estimate
* Assist City with 30% Design open house/ public meeting
* 90% Design Package, Plans, Specifications, and Estimate
* Assist City with 90% Design open house/ public meeting
* Final Bid Package, 100% Construction Plans, and Specifications
The City of Port Angeles reserves the right to retain the services of the successful firm for any subsequent
phase (CN) associated with this project.
SCHEDULE
Advertised: Tuesday, July 21, 2026, and Tuesday, July 28, 2026
RFQ issued: Tuesday, July 21, 2026
Questions Due: Tuesday, August 4, 2026 by 5:00 p.m. PST
The City will not respond to any inquiries submitted after this date/time.
Due date: Tuesday, August 11th, 2026 by 5:00 p.m. PST
Anticipated Design Schedule & Deliverable Dates
Begin Preliminary Engineering September 2026
Begin Environmental October 2026
Community/Stakeholder Engagement October 2026
30% Design Submittal January 2027
Finish Environmental April 2027
90% Design Submittal June 2027
100% PS&E Package on Ad September 2027
Contract Awarded November 2027
Construction Complete April 2028
REQUEST FOR QUALIFICATIONS CONTENT
The cost of developing the statement of qualifications (SOQ) for the project shall be included in the
consultants cost of doing business and the City is not responsible for any costs associated with preparing
it.
Submittals must clearly demonstrate an understanding of the City's objectives. The proposal shall be
limited to 10 pages (double-sided), resumes can be included in an appendix and do not count towards the
page limit. The proposal should not include unnecessary promotional material, and shall be brief, precise,
and organized as follows:
1. Cover Letter
Please include:
* Firm name, address, telephone, email.
* A single point of contact for the RFQ process.
* General introduction of your firm with a brief summary of general qualifications and areas
of expertise.
2. Statement of Qualifications
Please include:
* Description of firm
Type of ownership - individual, partnership, municipality, corporation, etc.
o
Size of firm.
o
Number of years in business.
o
Description of qualifications in areas of expertise and services provided.
o
Information relating your philosophy and general approaches to the work to be
o
performed.
* A list of projects that demonstrates your firm's experience in transportation and safety
design, specifically the tasks listed in the Scope of Work above.
Include relevant background information on the projects (timeframe, major
o
milestones, cost, firm's role and relevant staff).
Maximum of 10 project examples.
o
3. Key Personnel
Please identify:
* Key personnel for each service provided.
Include resumes and certifications for key personnel and their experience on
o
relevant projects and contracts (as noted above, resumes can be included in an
appendix and do not count towards the page limit).
Identify potential project managers and any personnel that would interact with
o
City staff and/or the public.
4. References
Please include:
* List up to five people whom the City staff may contact for professional references
regarding the past performance of the firm, including name, email and phone number.
SELECTION PROCESS
Submit an electronic copy (PDF) of the full SOQ via email or USB drive no later than Tuesday, August 11th,
2026 by 5:00 p.m. PST to:
City of Port Angeles
Department of Public Works - Engineering
Attn: Timothy Hayes, P.E., Engineer III
321 E 5th Street
Port Angeles, WA 98362
thayes@cityofpa.us
The maximum file size that can be emailed is 20MB. Please include "Traffic Circle Program" on the
envelope, if mailed, or in the subject line, if emailed. All submittals received by the specified deadline
will be reviewed by the City for content, completeness, and experience. After the firms deemed most
qualified are selected, further evaluation and interviews of the short-listed firms may be conducted as
part of the final selection process. However, the City reserves the right to complete the selection
process without proceeding to an interview phase and may choose to select the firm based upon
information supplied in the proposer's qualification statement. The following criteria will be used to
evaluate responses to this RFQ:
| The City of Port Angeles, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 |
|---|
| Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will |
| affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged |
| business enterprises will be afforded full and fair opportunity to submit bids in response to this |
| invitation and will not be discriminated against on the grounds of race, color, or national origin in |
| consideration for an award. |
1. Responsiveness to the RFQ, breadth and depth of response.
2. Reputation of the company, its subcontractors and key personnel.
3. Qualifications of the Proposed Project Manager.
4. Ability to meet schedule.
5. Approach to Project.
6. Familiarity with City of Port Angeles standards.
7. Familiarity with preparing PS&E for federally funded projects
8. Successful and timely delivery of federally funded projects.9. Satisfaction of prior and current
clients (references).
For further information, please contact Timothy Hayes at 360.417.4827 or thayes@cityofpa.us
CONTRACT PROCESS
The City intends to execute a cost-plus fix fee agreement with the most qualified firm. The Agreement will
be awarded at the discretion of the City of Port Angeles City Council. The City of Port Angeles reserves the
right to accept or reject any or all proposals received as a result of this request, to negotiate with any
qualified source, or to cancel in part or in its entirety this RFQ. Proposals and materials submitted will
become the property of the City and will not be deemed confidential or proprietary and are subject to
public record laws and will be released upon request.
ATTACHMENTS
1. Exhibit A - Vicinity Map
2. Exhibit B - Engineer's Estimate
3. Exhibit C - Port Angeles LRSP 2024
AMERICANS WITH DISABILITIES ACT (ADA) INFORMATION
The City of Port Angeles in accordance with Section 504 of the Rehabilitation Act (Section 504) and the
Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its
programs and activities. This material can be made available in an alternate format by emailing Lucy
Hanley, Contract Specialist III, at contracts@cityofpa.us or by calling 360.417.4541.
TITLE VI
The City of Port Angeles, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78
Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will
affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged
business enterprises will be afforded full and fair opportunity to submit bids in response to this
invitation and will not be discriminated against on the grounds of race, color, or national origin in
consideration for an award.

With GovernmentContracts, you can:
...Gilman Kelly Green Paul Berendt Dani Madrone Robert Vanderpool Assistant City Manager Stacey ...
City of Olympia
Bid Due: 9/18/2026
...SEP Program: Solicitation Name: ADVANCE NOTICE: Rail Modernization Program SEP %: Solicitation ID...: ...
Washington Metropolitan Area Transit Authority
Bid Due: 9/30/2027
.... Mark Dostal Engagement Program Manager 800 SW 39th St, #150 Renton, WA ...
King Conservation District
Bid Due: 9/23/2026
.... Mark Dostal Engagement Program Manager 800 SW 39th St, #150 Renton, WA ...
King Conservation District
Bid Due: 9/23/2026