| Location: | Mississippi |
|---|---|
| Posted: | Jan 16, 2025 |
| Due: | Feb 18, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912EE25O0002 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
1. CONTRACT INFORMATION: This Pre-solicitation Notice is for interested firms to submit their SF 330 by February 18, 2025, 14:00 hours, CST. Firms will be selected for negotiations based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal (RFP). The services to be procured under this announcement are classified in North American Industry Classification System Code 541330 Engineering Services with a small business size standard of $25.5M. This contract is being procured in accordance with the Brooks A-E Act as implemented in FAR Subpart 36.6.
One Indefinite Delivery Contract (IDC) will be negotiated and awarded from this solicitation. Work will be accomplished under an IDC base, with a performance period of five (5) years. Work will be issued by negotiated firm fixed-price or labor-hour task orders. The cumulative total of Task Orders issued over the life of the contract shall not exceed a capacity of $5.0 million. This IDC contract will have a $1,000 minimum guarantee. Allocation of Task Orders will be based on specialized experience, past performance, project schedules, and/or current workload.
The work consists of professional A-E services required for performing Hydraulic and Hydrologic Modeling, Geographic Information Systems (GIS) and mapping, economic consequences assessment, Corps Water Management System (CWMS), CWMS Control and Visualization Interface (CAVI) integration, documentation, and other related engineering services to support requirements of the U.S. Army Corps of Engineers (USACE) Modeling, Mapping, and Consequences (MMC) Production Center. The scope of these services and project locations are nationwide.
2. PROJECT INFORMATION: The U.S. Army Corps of Engineers (USACE) Dam and Levee Safety Programs and the Office of Homeland Security (OHS) have tasked the MMC to develop, on an expedited schedule, dam break flood inundation modeling and mapping for USACE inventory of 700 plus water resources projects (dams). These efforts will support national critical infrastructure protection responsibilities led by USACE under the Dam Safety and Levee Safety programs portfolio development and undergo risk assessments led by the Risk Management Center (RMC). The MMC Production Center was also charged with supporting the Hydraulics, Hydrology, and Coastal Engineering (HH&C) Community of Practice community in producing H&H CWMS suites of models for all 201 USACE operational watersheds. The USACE's vision is to achieve a safe, secure, and more resilient Corps civil works infrastructure by enhancing its protection to prevent, deter, or mitigate the potential for dam and levee failure and improve preparedness, response, and rapid recovery in the event of an attack, natural disaster, and other emergencies. A major initiative within this effort involves the development of CWMS suite of models, dam break flood hydraulic models, inundation mapping, and consequence estimates. Lastly, the MMC Production Center also is currently supporting FEMA with its methodology development and production for its Future of Flood Risk Data (FFRD) initiative. Components of the initiatives above include:
3. SELECTION CRITERIA: Selection will be based on the following considerations, which are listed in descending order of importance. Criteria A thru D are primary. Criteria E thru F are secondary and will only be used as a “tie- breaker,” if necessary, in ranking the most highly qualified firms. The firm (either in house or through association with a qualified consultant(s)) must demonstrate:
(A) Specialized experience and technical competence: List no more than 10 projects that best illustrate current qualifications, relevant project experience and technical competence of the firm and consultants in the work described in items i-vii below. (i) H&H experience in producing hydraulic modeling, mapping, and consequence analysis via utilization of such software as HEC-RAS, HEC-HMS, HEC-ResSim, CWMS CAVI, , , HEC-FIA, HEC-LifeSim, HEC-MetVue, ArcGIS Pro; (ii) experience in the operation, design, and general knowledge of large scale basins, dams, rivers, and water control structures; (iii) experience in processing and delivering large scale hydraulic modeling and GIS data for numerous simultaneous projects; (iv) experience in developing a consistent and scalable suite of hydraulic models for basins and dams capable of providing consistent and reliable estimation of the risks to society from damaging releases from dams, extreme floods, or failures due to natural disasters, flaws, or attacks; (v) experience in developing consistent mapping for delineation of flooded areas used to compute scalable consequence data that will provide consistent consequence estimates of Population at Risk (PAR), Potential Life Loss (LL), and Estimated Dollars impacts (vi) experience in developing consistent mapping for Emergency Action Plans (EAP) that shows delineation of flooded areas and/or GIS products to minimize societal impacts from damaging releases from dams; (vii) experience in developing and documenting consistent GIS, consequence, and modeling & mapping standards; and (vii) experience performing GIS enterprise systems implementation projects to include activities such as planning, requirements, design, programming, implementation, support, and application hosting within the ESRI technology environments.
(B) Professional qualifications: The firm must indicate professional registration and work experience of key personnel. The firm should emphasize professional registrations, advanced degrees, certifications, and specific work experience of key personnel in Project Managers, hydrologic and hydraulic engineering, GIS/cartography, Economics, and Technical Writing/Editing. The selected firm should also indicate adequate management personnel with required qualifications and experience to assure prompt response to assignments.
(C) Capacity to Accomplish the Work: The firm should indicate the ability to perform numerous projects at the same time regardless of unexpected equipment breakdowns, and/or personnel problems; and complete work in a timely manner.
(D) Knowledge of the USACE operational basins and water control structure inventory.
(E) Past Performance: Consideration will be given to ratings on previous DoD contracts for engineering services.
(F) Equitable distribution of DoD Contracts. Consideration will be given to volume of DoD A-E contract awards in the last 12 months, with the objective of effecting an equitable distribution of DoD A-E contracts among qualified firms, including SB and SDB. Firms should cite all contract numbers, award dates and total negotiated fees for any DOD contract awarded within the last 12 months. Include delivery orders awarded your firm by DOD agencies within the last 12 months under indefinite delivery type contracts. Modifications to contracts or task orders that were awarded prior to the last 12 months need not be listed.
4. SUBMISSION REQUIREMENTS: Interested firms having the capabilities for this work must submit one electronic copy (in PDF format) of SF 330 along with a signed copy of part II of each sub-consultant’s SF 330 to: MVKAECoordinator@usace.army.mil and Haleigh.J.Erwin@usace.army.mil no later than 2:00 PM Central on 18 February 2025. Include both the solicitation number and the company’s Unique Entity ID number on all submittals. Include Unique Entity ID numbers in Block 9 for all firms listed in the SF 330.
Note the following restrictions on submittal - Resumes of key persons, specialists and individual consultants (Section E) anticipated for this contract will be limited to a maximum of 20 typed pages. Pages in excess of the maximum of 20 will be discarded and not used in the evaluations. Additional information (Section H) will be limited to a maximum of 20 pages. All telephone calls should be directed to Ms. Michelle Moore, (601) 631-5139 or email michelle.moore@usace.army.mil.
*** APPOINTMENTS WILL NOT BE SCHEDULED FOR THE PURPOSE OF DISCUSSING THIS ANNOUNCEMENT ***
This is not a Request for Proposal (RFP). A fee/price solicitation will be issued at a later date, to the firm determined to be the most highly qualified.
NOTE: Contractors must be registered in the System for Award Management (SAM), for information see http: www.sam.gov.

With GovernmentContracts, you can: