| Location: | Colorado |
|---|---|
| Posted: | Sep 23, 2025 |
| Due: | Oct 20, 2025 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1240LT25Q0054 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
A Site Visit will be held on 10-3-2025 at 1:00pm MT. Refer to Solicitation Section L for full details and requirements.
The culvert at Meadow Creek has failed and is need of replacement. This is in a live stream (meadow creek) and the water is creating a void under the road as it erodes causing the road to settle and create a hazardous situation. The 72” diameter pipe is located on the West Dolores Road (NFSR 535) at milepost 24.72 just past burro bridge. The objective is to replace the pipe with a steel polycoated culvert that will resist rusting from the mineral content in the stream. A bypass road will be constructed to allow continued traffic throughout the duration of the project which is anticipated to last two weeks. Rip-rap will be collected on-site and commercially purchased ¾”-minus road base will be used for surfacing. See attached SOW, Specs, and Drawings for full project Requirements
| Oct 2, 2025 | [Solicitation (Updated)] Culvert Replacement Meadow Creek |

With GovernmentContracts, you can: