CONSTRUCTION OF ARSENIC AND PFAS TREATMENT PLANT FOR SOUTH STREET WELLS
| Location: |
Massachusetts |
| Posted: |
Mar 7, 2025 |
| Due: |
Apr 10, 2025 |
| Agency: |
Commonwealth of Massachusetts |
| Type of Government: |
State & Local |
| Category: |
- 68 - Chemicals and Chemical Products
- Y - Construction of Structures and Facilities
|
| Solicitation No: |
BD-23-2126-AWD01-OFF-113655 |
| Publication URL: |
To access bid details, please log in. |
Bid Solicitation: BD-23-2126-AWD01-OFF-113655
|
|
Header Information
|
|
Bid Number:
|
BD-23-2126-AWD01-OFF-113655
|
Description:
|
CONSTRUCTION OF ARSENIC AND PFAS TREATMENT PLANT FOR SOUTH STREET WELLS
|
Bid Opening Date:
|
04/10/2025 02:00:00 PM
|
|
Purchaser:
|
Greg Woods
|
Organization:
|
Auburn Water District
|
|
Department:
|
AWD01 - Auburn Water District
|
Location:
|
OFF - OFFICE
|
|
Fiscal Year:
|
23
|
Type Code:
|
NS
|
Allow Electronic Quote:
|
No
|
|
Alternate Id:
|
|
Required Date:
|
04/10/2025
|
Available Date
:
|
03/07/2025 11:27:11 AM
|
|
Info Contact:
|
Michael Carmasine, Comprehensive Environmental Inc., 41 Main Street, Bolton, MA 01740
|
Bid Type:
|
OPEN
|
Informal Bid Flag:
|
No
|
|
Purchase Method:
|
Open Market
|
|
Pre Bid Conference:
|
A non-mandatory Pre-Bid Meeting will be held on March 20th at 10:00 a.m. at the Project Site.
|
|
Bulletin Desc:
|
The Auburn Water District is seeking sealed bids from prequalified contractors for the construction of the Arsenic and PFAS Treatment Plant for South Street Wells, DWSRF Project No. 16699. Sealed Bids for the construction will be opened 2:00 pm on April 10, 2025. Sealed Bids from filed sub bids will be opened 2:00 pm on March 31, 2025.
|
|
|
Ship-to Address:
|
Gregory Woods
75 Church Street
P.O. Box 187
Auburn, MA 01501
US
Email: gwoods@auburnwater.com
Phone: (508)832-5336
FAX: (508)832-5338
|
Bill-to Address:
|
Gregory Woods
75 Church Street
P.O. Box 187
Auburn, MA 01501
US
Email: gwoods@auburnwater.com
Phone: (508)832-5336
FAX: (508)832-5338
|
Print Format:
|
Bid Print
|
|
Required Quote Attachments
|
|
|
|
Item # 1:
(
72-13
-
00
)
|
The work for this project consists of constructing a new 400 gpm water treatment facility located at the property of 9A Pine Valley Drive. The treatment building consists of an approximately 5,000 square foot masonry structure housing three 10-ft diameter Greensand Plus (GSP) media pressure filters and two 10-ft diameter Granular Activated Carbon (GAC) filters along with associated piping and appurtenances, controls, plumbing, HVAC and electrical work. The building will include a concrete basement level backwash residuals storage basin with pumps and force main to the gravity sewer system for GSP and GAC filter backwashing. The work also includes some ancillary work at the nearby pump station and installation of several chemical feed systems including chlorine gas, sodium bisulfite, ferric chloride, and potassium hydroxide. Comprehensive Environmental, Inc., Attn: Michael Carmasine, 41 Main Street, Bolton, MA 01740 or by email to Francine Carrigan at fcarrigan@ceiengineers.com
|
|
U N S P S C Code:
|
72-13-00
General building construction
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|
|
|
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...Filter Media Replacement REBID located at 142 Shaker Road in Westfield, MA will ...
City of Westfield
Bid Due: 6/11/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.