| Location: | Florida |
|---|---|
| Posted: | Aug 13, 2026 |
| Due: | Aug 27, 2026 |
| Agency: | Florida Keys Electric Cooperative |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FKEC BID #26-14 |
| Publication URL: | To access bid details, please log in. |
| Date | Time | Mandatory | Location |
| Date | Time | Location |
| Question | Date Asked | Answer | Date Answered |
|
Please clarify, on Page 3 of the RFP document titled “SPECIFICATIONS TO PROCURE AND CONSTRUCT ADSS FIBER OPTIC LINE,” whether the section of conduit along Aviation Boulevard heading toward US-1 has been fully engineered and designed, including the associated permitting and approvals.
If the engineering, design, and permitting have not yet been completed, please clarify whether these items are included in the contractor’s scope of work. |
8/11/2026 4:06:32 PM | The only engineering of the underground section of conduit along Aviation Boulevard heading towards US-1 is what is shown on the drawings with no permitting or approvals available. The contractor will need to include all remaining services in their scope of work to complete the ADSS fiber install. | 8/11/2026 4:49:03 PM |
|
Please advise whether the newly installed underground (UG) conduits constructed by others have been or will be proofed prior to awarded contractors commencement of our work.
Additionally, please confirm the size and quantity of conduits installed as part of the new UG construction. The Exhibit C Permit for "FKEC Q Feeder" drawings indicate (4) 4-inch conduits, while Exhibit H – Vault Design depicts (8) 2-inch conduits. Please clarify which conduit configuration is correct. |
8/11/2026 4:19:22 PM |
The newly installed UG conduits will be verified as ready-to-use prior to mobilization of ADSS fiber installation contractor, but the conduit is about to be installed so it has not been completed yet. The conduit will be a single 2” for the fiber.
The vault diagram is a basic template. The UG power distribution cables will be in the 4” conduit with the fiber being in the same vault but using a single 2” conduit. |
8/12/2026 2:29:16 PM |
|
Exhibit F identifies straight-through splices at 31 locations. However, Page 3, Paragraph 3 of the “Specifications to Procure and Construct ADSS Fiber Optic Line” divides these locations into 13 overhead (OH) and 18 underground (UG) splices. Paragraph 4, second sentence, further states that:
“It is preferred not to have any ADSS fiber splices inside the vaults. If this cannot be accomplished, the splices shall be minimized and only the splice locations on the drawings will be used.” Please clarify whether the ADSS fiber may be installed continuously through the UG vaults without splicing where continuous placement is feasible, or whether splicing is required at the locations identified on the drawings regardless of whether the fiber can be installed continuously without a splice. |
8/11/2026 4:35:19 PM | The ADSS fiber may be installed continuously through the UG vaults without splicing as long as the 100’ loops are still present on each vault side wall. If a splice is needed, please place it at one of the noted locations. | 8/12/2026 2:30:07 PM |
| Please confirm whether conduit has been installed between the riser poles and the underground vaults at the locations where the fiber transitions from overhead to underground. | 8/11/2026 4:37:23 PM | The fiber that is underground along the long run (not near the airport) will be stubbed up 1-2’ on each end and the fiber contractor will need to complete the riser up the pole to finish the transition. | 8/12/2026 2:29:41 PM |
|
The following splice locations are identified on Exhibit D – FKEC Q-Feeder – Fiber Construction Drawings, but are not identified on Exhibit F – Fiber Schematic:
N-124, N-102, N-67, N-53, N-42, N-30, and N-14. Please advise whether splicing is required at these locations. If splicing is not required, please confirm that these locations should be omitted from the splice locations for purposes of this bid. |
8/11/2026 4:47:56 PM | All of the locations need the 100’ slack loop installed but a splice is only needed that is not listed in the question is at N67, for the transition from OH to UG. N60 will need a spice to transition from UG to OH. | 8/12/2026 8:02:20 AM |
| Will the new buildout along Aviation Blvd consist of (1) - 2" HDPE conduit? | 8/13/2026 8:29:38 AM | Yes, that is correct. | 8/13/2026 8:56:25 AM |
| Please provide the geotechnical report applicable to the Horizontal Directional Drilling (HDD) segment of the project scope. | 8/13/2026 12:33:01 PM | A geotechnical report is not available, only what is listed in the drawings. | 8/13/2026 2:03:46 PM |
| If site conditions or physical constraints require it, can a 1,000 LF HDD installation segment be divided into smaller sections? Appropriate tie-in connections would be performed between the segments as required to complete the installation | 8/13/2026 12:33:17 PM | Yes, smaller than 1,000 LF segments for the conduit installation is acceptable if only to join conduit and not install splice boxes to ultimately run fiber continuously UG without additional fiber splices. | 8/13/2026 2:04:43 PM |
|
Please confirm whether the Contractor is responsible for the clearing, removal, and disposal of any vegetation, brush, or trees that may interfere with the proposed Horizontal Directional Drilling (HDD) path and associated work areas.
If clearing of vegetation, please clarify who would be responsible for applying for such environmental permits. |
8/13/2026 12:33:32 PM | FKEC is requesting a turn-key proposal to include any needed clearing/removal/disposal of vegetation that may interfere with the HDD. If environmental permitting is needed, the contractor would need to apply for any permits. | 8/13/2026 2:05:20 PM |
| Is police presence required during construction activities? If required, please clarify whether the Contractor is responsible for coordinating and covering the associated costs. | 8/13/2026 12:33:44 PM | It is not anticipated that a police presence will be necessary but if any additional MOT UWS filed with FDOT does require flagging or other MOT like a police presence, the contractor will be responsible to provide and cover costs. | 8/13/2026 7:25:17 PM |
| The FDOT permit special instructions specify that work within the FDOT right-of-way shall be performed between 9:00 AM and 4:00 PM, or as directed by the Department representative. This restriction is not clearly identified on the construction plans. Please confirm that all work activities, including HDD operations, pull box installations, and cable pulling, are limited to these hours and advise whether any exceptions or night/weekend work permits may be obtained. | 8/13/2026 12:33:57 PM | With this project’s scope only including to procure and construct the ADSS fiber optic line, another contractor will be installing the vaults and performing HDD on the entire project – except along the US-1 South side of the Marathon Airport. No vaults will be located along the US-1 South side of Marathon Airport. This project’s scope will require proposals to include obtaining permitting for the UG installation of 2” conduit along the US-1 South side of the Marathon Airport. All permit conditions listed will need to be adhered to but contractors are welcome to obtain additional permits allowing longer hours if FDOT is willing to issue them. | 8/13/2026 7:32:47 PM |
| Please confirm whether dewatering has been identified as necessary for the installation of the splice boxes. If dewatering is required, please provide the anticipated groundwater conditions | 8/13/2026 12:34:12 PM | The vaults will be installed by a separate contractor, which is not part of this procure and construct ADSS fiber optic line. | 8/13/2026 7:32:08 PM |
| The permit package and plan set reference the installation of 590 LF of new 144-strand ADSS fiber optic cable; however, the detailed underground conduit drawings primarily depict the installation of the 1000 MCM feeder and associated conduits. Please confirm the complete scope of work for the fiber optic installation, including whether any underground fiber installation is required in addition to the overhead ADSS section shown in the permit documents. [EXHIBIT C...it Package | PDF] | 8/13/2026 12:34:23 PM |
The permit has a mistake, that only 590LF of ADSS fiber will be installed. The correct total of UG fiber is ~3.5 miles of ADSS fiber to be installed and use an updated FDOT permit. FKEC is currently in the process of updating the existing FDOT permit to include all fiber that needs to be installed along the total route covered in that permit. Please plan to use a revised FDOT permit, that FKEC will obtain, allowing installation of UG ADSS fiber along the entire route listed in the current permit.
This bid scope is to install the UG ADSS fiber into a 2” conduit (2” conduit installed by others, except the approx. 1,100’ section along US-1 South of the Marathon Airport) along all UG sections of the total fiber route shown on the drawings. This scope includes HDD install of 2” conduit along the 1,100’ section along US-1 South of the Marathon Airport and no other HDD in this scope. This bid scope will also install all OH sections of the fiber onto poles, where the poles are installed by others. All of the OH fiber tap locations for distribution reclosers and capacitor banks will be part of this scope. |
8/13/2026 7:27:10 PM |
| Please confirm whether the 144-strand ADSS fiber optic cable will be used for both overhead (OH) and underground (UG) installations, or if separate Fiber Optic cables types are required for each application. Please provide the corresponding specifications if different cables are required. | 8/13/2026 12:34:33 PM |
144 strand ADSS fiber optic cable will need to be used for OH and UG installations. 24 strand ADSS fiber optic cable will be needed for taps to distribution equipment as listed on the drawings. No additional cabling is required.
AFL Flex-Span ADSS for both the 144 strand and 24 strand with the below specifications will be required. |
8/13/2026 7:26:28 PM |
| The permit narrative states that the project includes installation of three (3) 45/H1 ductile iron poles. However, the detailed plan sheets also reference additional pole-related work, including a 50/20 KIP ductile iron pole, replacement of an existing pole, and installation of poles identified as Q12, Q16, Q17, Q18, and Q24. Please confirm the total quantity and types of poles to be furnished and installed under this contract. | 8/13/2026 12:34:42 PM | No purchase or installation of poles is included in the scope of the procure and construct of the ADSS fiber optic line. The FDOT permit includes fiber and distribution electrical but only the fiber portion is in the scope of this bid. | 8/13/2026 3:02:36 PM |
| Please consider extending the bid submission deadline by one (1) week. An additional week would allow us to adequately review the project requirements, address outstanding questions, and submit a more complete and competitive proposal. | 8/13/2026 12:34:53 PM | Done. Please see Addendum #1. | 8/13/2026 3:12:01 PM |
| Please confirm whether all ductile iron poles shown on the plans (including Q12, Q16, Q17, Q18, and Q24) are to be furnished and installed by the Contractor, or if any poles and associated hardware will be owner-furnished. Please also identify the required pole classes, lengths, foundations, and appurtenances to be included in the Contractor`s scope. | 8/13/2026 12:35:02 PM | All distribution material will be part of another project (not in this scope to provide poles) that will be started before the ADSS contractor begins their work. The ADSS fiber installation project scope does not require any poles to be provided by contractor. | 8/13/2026 2:51:53 PM |
| Can a section of the substation located under the VACA key be designated as a laydown yard? | 8/13/2026 12:35:12 PM | FKEC can provide a 30’ x 50’ location for laydown at the Marathon yard (3421 Overseas Highway) only. There is not enough room at Crawl Key Substation for laydown. | 8/13/2026 2:39:09 PM |
| Please confirm whether supplying water for directional drilling is the contractor`s responsibility. | 8/13/2026 12:35:21 PM | Directional Drilling is the contractor’s responsibility for only the section near the US-1 South side of the airport UG section. The remainder of UG conduit for the ADSS fiber installation will be bored by the distribution feeder project that will occur just before the fiber installation contractor begins. | 8/13/2026 2:36:50 PM |
| Is it the contractor`s responsibility to provide the 1000 MCM copper cable? | 8/13/2026 12:35:29 PM | The 1000 MCM cable is not part of this ADSS fiber installation scope. | 8/13/2026 2:29:34 PM |
| Please can you confirm the deliverables under the design section of Exhibit A? | 8/13/2026 12:35:37 PM |
| Code | Description |
| [912-21] | Construction, Energy Related (All Types) |
| [913-41] | Construction, Power Line (Includes Installation, Maintenance, and Repair) |
| Publication | Date |

With GovernmentContracts, you can:
...Bid Information Type Quick Quote Status Issued Number 26-047 (Tree Inventory and Analysis) ...
City of Deerfield Beach
Bid Due: 9/25/2026
...Description: TREE REMOVAL SERVICES, TERM CONTRACT Department: Purchasing Buyer: Bobby Brooks...
Palm Beach County
Bid Due: 3/20/2030
...Description: TREE REMOVAL SERVICES, TERM CONTRACT Department: Purchasing Buyer: Bobby Brooks...
Palm Beach County
Bid Due: 9/26/2029
...Description: ITB; Hurricane Ivan Tree Removal Bid Number: PD 04-05.33 Addendum: AD 04-05.33 ...
Escambia County
Bid Due: 4/05/2033