| Location: | Vermont |
|---|---|
| Posted: | May 4, 2026 |
| Due: | May 25, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Request for Proposal Locations: Grand Isle Keywords: Construction (Non Building), Material Handling Equipment and Supplies, Landscaping, Parks and Recreation, Pedestrian Walkways Bid Description: South Hero Land Trust is seeking a qualified contractor to assist with the construction of a new trail at Islandacres Farm in South Hero, VT. The Islandacres Trail is a proposed public-access route across three separate parcels, each with their own separate landowner, in South Hero. The trail would be approximately 1 mile long, one way, connecting from South Street to Tracy Rd. We are specifically seeking bids for the first ~.5 miles of the trail from South St, which will be an accessible, crushed stone-surface trail, built to ADA standards
|
||||||||||||||||||||

With GovernmentContracts, you can:
...OVER WILLIAMS RIVER AT MILE POST 17.10 REPLACE EXISTING STONE FILL PLACED AFTER ...
State Government of Vermont
Bid Due: 10/09/2026
..., a dry-stacked stone walk, stone bridge, plunge pool, dry swale, check dam, ...
State Government of Vermont
Bid Due: 10/02/2026
.... The Project includes installation of encapsulated soil lifts, stone toe protection, plantings...
State Government of Vermont
Bid Due: 10/07/2026
...AT MILE POST 17.45 TYPE OF CONSTRUCTION: CHESTER REGM2345 - REPLACE EXISTING STONE ...
State of Vermont - Agency of Transportation
Bid Due: 10/09/2026