| Location: | California |
|---|---|
| Posted: | Sep 23, 2025 |
| Due: | Sep 30, 2025 |
| Agency: | ENERGY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | SLAC_RFP_360342 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This is a Sources Sought Notice to identify subcontractors capable of installing the K-5B Substation and Sector 4 Switchgear under Subproject 1 of the Critical Utilities Infrastructure Revitalization (CUIR) Project. This is not a solicitation for proposal or quotations and no award will be made from this Notice.
SLAC intends to issue a formal solicitation later based on responses from this Source Sought Notice.
BACKGROUND AND PLANNED SCOPE
Many of SLAC’s utilities were installed in the 1960s as part of the original laboratory construction. These utilities were not designed to support the experimental parameters needed for science research today and in the future. The purpose of the Critical Utilities Infrastructure Revitalization (CUIR) Project is to modernize utility infrastructure to provide reliable and sustainable operations, enabling SLAC National Accelerator Laboratory (SLAC) to remain mission-ready and enhance the impact of Department of Energy (DOE) scientific programs.
As part of CUIR Subproject 1, SLAC will install a new K5B Substation on the north side of the Klystron Gallery at Sector 9, and a new switchgear system on the south side of Sector 4. The scope includes equipment installation, site and electrical work to integrate with existing systems, and civil and utility modifications to support the new infrastructure.
Both the switchgear and substation equipment are Government Furnished Property (GFP). Certain work must be performed within pre-negotiated power outage windows, requiring careful coordination to minimize impact on ongoing operations.
This project is a project directly funded by the DOE's Office of Science.
SOURCES SOUGHT RESPONSE
Potential bidders will need to meet all necessary criteria outlined in Section L of the draft RFP, which includes:
Interested subcontractors with the skills, capability, workload capability, and ability to obtain bonding to complete the planned project scope are invited to submit a written response to this Sources Sought Notice. Please provide the following information:
Please provide your response to Quyen Weng at quyen@slac.stanford.edu by 5 pm PST on September 30, 2025.
SOURCES SOUGHT DISCLAIMER:
Please note that any responses to this source sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.

With GovernmentContracts, you can:
...) Critical Infrastructure Protection (CIP) Standard-013. Pursuant to the CIP-013 Standard and LADWP's ...
City of Los Angeles
Bid Due: 1/02/2030
...Electric Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) Standard-013...
City of Los Angeles
Bid Due: 1/01/2030
...the canyon with manholes located along the trail. The trail path serves as ...
City of Santa Cruz
Bid Due: 6/30/2026
...technologies that enable rapid and effective construction, repair, and development of infrastructure... or ...
DEPT OF DEFENSE
Bid Due: 6/12/2026