| Location: | Maryland |
|---|---|
| Posted: | Jun 24, 2026 |
| Due: | Jul 10, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912DR26BA004 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027.
The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1-2 foot of allowable over depth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility.
The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 – 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 – 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.
THE SOLICITATION IS SCHEDULED TO BE RELEASED ON/OR ABOUT 10 July 2026.
| Mar 19, 2026 | [Sources Sought (Original)] FY26 Q4 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD |

With GovernmentContracts, you can:
...: Open Due / Close Date: 7/31/2026 Publish Date: 6/1/2026 3:11:15 PM Main ...
State Government of Maryland
Bid Due: 7/31/2026
.../2/2026 Publish Date: 7/1/2026 11:33:31 PM Main Category: Heavy construction services Solicitation... Heavy ...
State Government of Maryland
Bid Due: 9/02/2026
...PM Main Category: Heavy construction services Solicitation Type: IFB: Invitation for Bid Issuing... ...
State Government of Maryland
Bid Due: 7/24/2026
...: 7/29/2026 Publish Date: 6/3/2026 8:40:25 AM Main Category: Heavy construction services Solicitation... ...
State Government of Maryland
Bid Due: 7/29/2026