| Location: | California |
|---|---|
| Posted: | Jan 26, 2026 |
| Due: | Feb 12, 2026 |
| Agency: | City of Santa Cruz |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB No. DEPT HERE-0276 |
| Publication URL: | To access bid details, please log in. |
Project ID: IFB No. DEPT HERE-0276
Title: Farmers' Market Phase 2 - Pedestrian Access Ramp
Addenda: 0
Release Date: 1/26/2026
Due Date: 2/12/2026
The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: remove a section of existing concrete wall, remove existing asphalt concrete pavement, remove existing base /soil to grade the working area to have the proposed finished grades and slopes shown on the plans with a final pavement section of 6-inch class 2 aggregate base and 3-inch HMA, install landscaped planter fill with 6”-8” cobble stones, install Caltrans 3-1/2 pull boxes and 2-inch conduit and reconnect street lights conductors for complete operation.

With GovernmentContracts, you can:
.... The principal features of the work encompass soil drilling and sampling utilizing ...
DEPT OF DEFENSE
Bid Due: 12/10/2026
...inch asphalt pavement and the upper 18 inches of soil (which includes 12-14 ...
State Government of California
Bid Due: 12/16/2026
...contracting services - Land & soil management - Watershed management 70161710 Wildlife... (Archeological, ...
State Government of California
Bid Due: 9/30/2027
...SOIL TO ACCESS UTILITIES AND BYPASS. CITY OF COALINGA PUBLIC WORKS DEPARTMENT TO ...
City of Coalinga
Bid Due: 11/10/2026