| Location: | Texas |
|---|---|
| Posted: | Nov 12, 2025 |
| Due: | Dec 18, 2025 |
| Agency: | City of Sugar Land |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-ITB-004 |
| Publication URL: | To access bid details, please log in. |
Project ID: 2026-ITB-004
Title: CWA2406/2409: GROUNDWATER PLANT GENERATOR & RIGHT ANGLE DRIVE (RAD) MAINTENANCE PROGRAM
Addenda: 1
Release Date: 11/12/2025
Due Date: 12/18/2025
NOTICE TO BIDDERS
GROUNDWATER PLANT GENERATOR & RIGHT
ANGLE DRIVE (RAD) MAINTENANCE PROGRAM
The City of Sugar Land seeks bids for furnishing all labor, material, and equipment, and performing all work required for the following project in the City:
CIP PROJECT NAME: GROUNDWATER PLANT GENERATOR & RIGHT ANGLE DRIVE (RAD) MAINTENANCE PROGRAM
CIP PROJECT NUMBER: CWA2406/2409
LOCATION OF WORK:
Plans, specifications, and bidding documents may be obtained from OpenGov Procurement.
Questions regarding this bid must be received on or before 5:00 p.m. Thursday, December 4, 2025. Please post all questions to OpenGov Procurement. Necessary replies will be issued to bidders of records as addenda, which become part of the bidding instruments. Oral instructions do not form a part of the bidding instruments.
Note:
THE SELECTED BIDDER(S) WILL BE REQUIRED TO ENTER INTO THE CITY OF SUGAR LAND STANDARD CONTRACT FOR CIVIL ENGINEERING CONSTRUCTION PROJECTS AND PROVIDE AND MAINTAIN THE MINIMUM INSURANCE COVERAGES REQUIRED UNDER THE CONTRACT. THE CONTRACT IS AVAILABLE AS AN ATTACHMENT TO THIS ITB.
The City Council will award the contract as provided in the Invitation to Bid. The City of Sugar Land will give notice of the contract award within ninety (90) calendar days after the opening date and time.
BRIEF SCOPE OF WORK
Major Improvements:
Sugar Creek Water Plant:
For Sugar Creek Water Plant, the scope of work includes the installation of a new diesel generator with a base fuel tank, along with a Service entrance rated Automatic Transfer Switch (ATS) and a dual-purpose docking station. The contractor will be responsible for preparing the site, which includes constructing new concrete foundations, slabs, platforms, grating, and handrails as required. The contractor will handle the removal of any existing equipment and the demolition of old concrete pads. Once the new equipment is in place, the contractor will perform final site grading to ensure the site is properly prepared and completed according to specifications. Additionally, final site grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals required to complete the work as specified. PLC/SCADA programming and modification to owner facilities will be performed by the owner's pre-selected SCADA integrator (Prime Controls).
First Colony Water Plant:
For First Colony Water Plant, the scope of work includes the rehabilitation of the existing Automatic Transfer Switch (ATS) and the installation of a new diesel generator, sub-base fuel tank, along with a proposed dual-purpose docking station. The contractor will be responsible for preparing the site, which includes constructing new concrete foundations, slabs, platforms, grating, and handrails as required. Additionally, final site grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals required to complete the work as specified. The contractor will handle the removal of any existing equipment and the demolition of old concrete pads. Once the new equipment is in place, the contractor will perform final site grading to ensure the site is properly prepared and completed according to specifications. Additionally, final site grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals required to complete the work as specified. SCADA programming and modification to owner facilities will be performed by owner pre-selected SCADA integrator (Prime Controls).
Miscellaneous Improvements:
The miscellaneous improvements include the following items:
Before commencing any miscellaneous improvement tasks, a site visit should be conducted at each facility to verify the scope of work. Existing conditions may differ from those when the project scope was initially developed. This visit will be coordinated with the Owner's designated representative to assess the site and confirm the feasibility of the proposed improvements. The objectives of the site visit include:
The water facilities where the proposed miscellaneous improvements should be implemented are summarized below.
|
S. No |
Water Facility |
Address |
|
|
Surface Water Plant |
14601 Voss Road, Sugar Land, TX 77498 |
|
|
Woodchester |
13743 Woodchester, Sugar Land, TX 77498 |
|
|
Lakeview |
1101 Lakeview Drive, Sugar Land, TX 77478 |
|
|
Sugar Creek Water Well Pump Right Angle Drive |
2030 Country Club Blvd, Sugar Land, TX 77478 |
|
|
Austin Parkway |
1402 Austin Parkway, Sugar Land, TX 77479 |
|
|
Riverstone |
16802 1/2 University Blvd., Sugar Land, TX 77479 |
|
|
Riverpark |
5975 Summit Creek, Sugar Land, TX 77479 |
|
|
Greatwood East |
8915 Park River Dr., Sugar Land, TX 77479 |
|
|
Greatwood West |
6631 Greatwood Pkwy, Sugar Land, TX 77479 |
|
|
New Territory Blvd |
4421 ½ New Territory Blvd., Sugar Land, TX 77479 |
|
|
Homeward Way |
5505 Homeward Way, Sugar Land, TX 77479 |
|
|
Thompson Chapel |
4603 Thompson Chapel, Sugar Land, TX 77479 |
Note: Alternate bids may be considered depending on the availability of City funds. The City reserves the right to include any or all alternative bid items in its bid evaluation.

With GovernmentContracts, you can:
...Automatic Transfer Switch Installation at the Rio Grande State Center Solicitation ID...
State Government of Texas
Bid Due: 6/12/2026
...diesel engine generator including electrical connections, automatic transfer switch, elevated...
County of Calhoun
Bid Due: 7/14/2026
...generator with a base fuel tank, along with a Service entrance rated Automatic ...
City of Sugar Land
Bid Due: 6/04/2026
...a warranty of at least 5 years for Generator and Automatic Transfer Switch. ...
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Bid Due: 7/21/2026