| Location: | Maryland |
|---|---|
| Posted: | May 20, 2025 |
| Due: | May 27, 2025 |
| Agency: | COMMERCE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1333ND25QNB680097 |
| Publication URL: | To access bid details, please log in. |
AMENDMENT TO SOLICITATION HIGH FINESSE DUAL WAVELENGTH REFERENCE CAVITY
CLARIFICATION/QUESTIONS AND RESPONSES AND EXTENSION OF RESPONSE TIME
Questions:
Request for more details about the product requirements:
Response:
A fiber input to the collimator assembly modules is specified in A.12 of the requirements document. Since the modules must be pre-aligned, the fiber input that is used for alignment should remain attached to the system and be included with it. The contractor is responsible for mode matching the light from the fiber into the optical cavity (or cavities) using a set of lenses and configuring additional optics specified in A.12 and A.13 to generate Pound-Drever-Hall locking signals.
The photodetectors must have a bandwidth sufficient for Pound-Drever-Hall locking to the optical reference cavity, at least 10 MHz. The input current noise for the photodetectors should be
| Apr 28, 2025 | [Combined Synopsis/Solicitation (Original)] High Finesse Dual Wavelength Reference Cavity System |

With GovernmentContracts, you can:
...beam 160-leaf multileaf collimator (MLC) Onboard 1.5 Tesla (or greater) magnetic resonance imaging... ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 7/30/2026
...(IGRT) including Cone Beam CT (following standards of TG-142). Five (5) years of ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 8/14/2026
...procedures. Is there an alternative welding method(s) (i.e. Robotic, electron beam, friction stir, ...
DEPT OF DEFENSE
Bid Due: 8/07/2026
...of experience -Image Guided Radiation Therapy (IGRT) including Cone Beam CT (following standards ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 8/14/2026