SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY
INVITATION FOR BIDS (IFB) 25-1003328
FOR
CONSTRUCTION OF THE INTERSTATE 10 CORRIDOR FREIGHT AND EXPRESS
LANE PROJECT – CONTRACT 2B
KEY IFB DATES
IFB Issue Date:
March 26, 2026
Pre-Bid Conference Date:
N/A
Written Questions/Approved Equal
Request Deadline:
April 16, 2026 @ 4:00 p.m.
Bid Due Date:
May 27, 2026 @ 2:00 p.m.
Good Faith Efforts Due:
N/A
Contract Award/Notice of Award Date: INSERT DATE: July 1, 2026
Notice To Proceed:
INSERT DATE: July 2026
*ALL DATES ARE TENTATIVE AND SUBJECT TO CHANGE, EXCEPT
BID DUE DATE WHICH IS A FINAL AND FIRM DATE
Federal Project No. 6507(053)
1 of 130
March 26, 2026
SUBJECT:
NOTICE INVITING SEALED BIDS INVITATION FOR BIDS (IFB)
25-1003328 “CONSTRUCTION OF THE INTERSTATE 10 CORRIDOR
FREIGHT AND EXPRESS LANE PROJECT – CONTRACT 2B”
The San Bernardino County Transportation Authority, (“SBCTA”), acting in the capacity designated
in the contract attached to this IFB as Attachment A, invites sealed bids for Construction of the
Interstate 10 Corridor Freight and Express Lane Project – Contract 2B, hereinafter referred to
as “Project”.
The plans and specifications for this project may only be obtained by signing the “SSI Document
Release Form” included in this solicitation as Attachment C. The deadline for requesting the plans
and specifications is 5:00p.m. on May 7, 2026. Firms may request this by emailing the form to
Natalie Lopez at nlopez@gosbcta.com. Please allow up to three (3) business days for a response.
Firms intending to submit a bid should note the “Key IFB Dates” on the cover of this IFB. SBCTA
intends, subject to contract approval, to have the selected firm under contract by July 2026. The IFB
and IFB schedule updates and addenda, together with other important information are available on
SBCTA’s website at www.gosbcta.com (“Bids & RFPs” under “DOING BUSINESS”). Firms are
requested to check the Vendor Portal periodically, and no less frequently than weekly, for IFB
updates, addenda and other information. All bidders will be held accountable for compliance with all
updates, addenda and other information posted on the Vendor Portal. Please note that SBCTA will
not be responsible for mailing any addenda, schedule updates or other information to any firm.
All questions and requests for clarifications to this IFB or approved equal requests, must be put in
writing and submitted to SBCTA electronically via Planet Bids, and they must be received by SBCTA
no later than 4:00 p.m. on April 16, 2026. All questions received after the date and time specified
may or may not be responded to, at the sole discretion of SBCTA. SBCTA’s responses to the
questions received by the date and time identified herein will be posted on the Vendor Portal on
SBCTA’s website at www.gosbcta.com: click on “Doing Business”, which will take you to the “Bids
& RFPs” page. There, click on the tab “Vendor Portal”.
The procurement will be conducted electronically through SBCTA’s PlanetBids Vendor Portal
webpage. SBCTA will not accept paper copies for any part of this procurement, including the bid
submittal.
Bids are due at or before 2:00 p.m. on May 27, 2026 (This is a firm date and will not be extended
due to project/funding constraints). Bids must be submitted electronically through SBCTA’s
Vendor Portal PlanetBids. All bids will be publicly opened at the date and time stated above, via
PlanetBids, and the Bid Results will be available to the public at the Bid Deadline, or immediately
thereafter, on PlanetBids, and posted on SBCTA’s website. Additionally, SBCTA shall, at the time
stated above or as soon thereafter as practicable, publicly open bids via PlanetBids, and read aloud
such bids via Microsoft Teams at the following web address:
IFB25-1003328
IFB Federal form approved 8/29/14
2 of 130
________________________________________________________________________________
Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/22753215554066?p=GKdgEuoiMiYXsqIJw3
Meeting ID: 227 532 155 540 66
Passcode: Si2xb9NG
Need help? | System reference
Dial in by phone
+1 469-217-7806,,658610958# United States, Venus
Find a local number
Phone conference ID: 658 610 958#
________________________________________________________________________________
To bid on this project, vendors must be registered with SBCTA’s PlanetBids Vendor Portal website.
A firm must accept the terms and conditions in order to proceed. Firms may save their bid at any time
as a draft. Firms may edit the bid as often as they need to until the IFB closes. The PlanetBids system
will not accept bids after the due date and time specified for this procurement and SBCTA will not
consider any late submittals.
Please note that where two or more firms, persons or entities wish to submit one bid in response to
this IFB, as a joint venture or partnership, each joint venture, partner, or member shall be jointly and
severally liable for any and all of the duties and obligations of the contractor that are assumed under
or arise out of the contract. In the case of a joint venture. SBCTA provides all applicable notices
under the contract to the joint venture contractor only, and not to individual joint venturers, partners,
or members. Each of such joint venturers, partners, or members waives individual notice of the breach
or non-performance of any undertaking or obligation of the contractor contained in resulting from or
assumed under the contract, and the failure to give any such individual notice shall not affect or impair
such venturer’s, partner’s, or member’s joint and several liability under the contract.
General description of work:
The Interstate 10 Corridor Freight and Express Lane Project – Contract 2B (Project), located in San
Bernardino County, proposes to construct a single express lane with price-managed/tolled facilities
in both directions of Interstate 10 (I-10) from approximately 0.3 miles east of Sierra Avenue to Pepper
Avenue, with construction work through the cities of Ontario, Fontana, Rialto, and Colton (including
unincorporated area), and the unincorporated community of Bloomington.
The Project improvements consist of inside and outside roadway widening within the project limits
and will require improvements to local access ramps. These improvements generally include:
• Addition of one Express Lane in each direction between Sierra Avenue and Pepper Avenue,
• Provide one Ingress/Egress (I/E) at-grade access location at Cedar Avenue, one Ingress at-
grade crossing at Pepper Avenue in the WB direction only, and one Egress at-grade crossing at
Pepper Avenue in the EB direction only,
• Coordination with SBCTA's Toll Service Provider (TSP) for tolling equipment, maintaining
operations, and access to existing toll lanes throughout construction,
IFB25-1003328
IFB Federal form approved 8/29/14
3 of 130
• Separation of general purpose (GP) lanes from the proposed express lane with a 2-footwide
buffer and surface mounted channelizers,
• Improve existing auxiliary lanes,
• Extend the existing acceleration and deceleration lanes in the EB direction between Sierra
Avenue and Cedar Avenue,
• Construct a new auxiliary lane in each direction between Riverside Avenue and Pepper
Avenue.
The project proposes adding approximately 4.89 lane miles of new roadway and restriping 5.0 lane
miles of existing roadway in each direction.
Other project improvements include:
Construction of an AT&T demarcation point connection on the southwest corner of Pepper
Avenue and W. Valley Boulevard to a Type M cabinet on the northwest quadrant of Pepper
Avenue interchange,
Construction of California Highway Patrol (CHP) observation areas,
Replacement of existing concrete barriers, temporary railings, metal beam guardrails, and metal
thrie-beam barriers with standard safety systems,
Construction of maintenance vehicle pullouts (MVP) at various locations,
Modification of existing stormwater drainage channels, construction of new drainage facilities,
and water quality Best Management Practices (BMPs),
Construction of median lighting at express lane I/E and other select locations,
Replacement of overhead sign structures and roadside signs,
Construction of retaining walls and sound walls.
As of January 1, 2015, all contractors and subcontractors bidding and performing work on Public
Works Projects must register on an annual basis with the California Department of Industrial
Relations (DIR), and effective April 1, 2015, furnish electronic payroll records for new projects to
the Labor Commissioner.
This is a Federal-Aid project: The contract, if awarded, will be financed in part by the U.S.
Department of Transportation (DOT). Bidders are required to certify that they meet all federal
requirements identified in this IFB, including but not limited to all applicable equal opportunity laws
and regulations and all conditions of the Davis-Bacon Act (40 U.S.C. 3141 et seq.) and the Labor
Code of the State of California commencing in section 1770 et seq. The Federal minimum wage rates
for this project are predetermined by the United States Secretary of Labor. If there is a difference
between the minimum wage rates predetermined by the Secretary of Labor and the General Prevailing
Wage rates determined by the Director of the California Department of Indistrial Relations for similar
classifications of labor, the awarded firm shall pay not less than the higher wage rate. Wage schedules
are available at SBCTA’s office or on the internet at www.access.gpo.go/davisbacon/ and
www.dir.ca.gov/DSLR/statistics_research.html.
This project is a Federal Highway Administration (FHWA) funded project subject to Public Law 117-
58, div. G, §§ 70901-27, 49 U.S.C. § 5323(j), and, 23 Code of Federal Regulations (CFR) 635.410
(“Buy America”), which provide Federal funds may not be obligated unless all steel and iron materials
that are permanently incorporated have been manufactured in the United States, unless a waiver has
been granted by FHWA pursuant to 23 CFR 635.410.
IFB25-1003328
IFB Federal form approved 8/29/14
4 of 130
The bidder shall include the Buy America requirements in all agreements with subcontractors for
Work on this Project. The bidder shall indemnify SBCTA from any loss, liability and expenses arising
out of bidder’s failure to comply with Buy America requirements. In the event that the bidder seeks
a statutory waiver pursuant to 23 CFR 635.410, the bidder may not rely on the anticipated issuance
by FHWA of such waiver to show compliance with Buy America requirements.
This project is subject to to Title 49, CFR Part 26, entitled “Participation of Disadvantaged Business
Enterprises” in the Department of Transportation Financial Assistance Programs (herein referred to
as the “Regulations”). SBCTA plans to receive federal financial assistance from the FHWA through
the California Department of Transportation (Caltrans). The Regulations in their entirety and the
Caltrans DBE Program Plan are incorporated into this IFB by this reference. Bidders are to be fully
informed respecting the DBE requirements and the Regulations.
A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to
the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any
contract for public work, as defined in this chapter, unless currently registered and qualified to
perform public work pursuant to Section 1725.5 . It is not a violation of this section for an unregistered
contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code
or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to
perform public work pursuant to Section 1725.5 at the time the contract is awarded.
If the contract is awarded, the contractor will be required to comply with all applicable laws and
regulations, whether or not specifically listed in this IFB or the contract.
Award of this contract is subject to the availability, appropriation and receipt of federal, State and/or
local funds sufficient to carry out the work identified in this IFB.
IFB25-1003328
IFB Federal form approved 8/29/14
5 of 130
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.