| Location: | Oklahoma |
|---|---|
| Posted: | Oct 2, 2026 |
| Due: | Oct 13, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912BV279A001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The U.S. Army Corps of Engineers (USACE), Tulsa District is issuing this Request for Qualifications (RFQ) for the design and construction of the FY28 KC-46A Aircraft Beddown Infrastructure Program at Altus Air Force Base, Oklahoma using Progressive Design-Build under 10 USC 2808a Other Transaction Authority.
The KC-46A Aircraft Beddown Infrastructure Program at Altus AFB, Oklahoma, will deliver comprehensive flight-line, industrial maintenance, and advanced aircrew flight simulator training facilities necessary to support the 97th Air Mobility Wing (97 AMW) - the Department of the Air Force’s sole formal training unit for heavy mobility aircraft. This $235M consolidated capital program will modernize the installation's infrastructure to replace Eisenhower-era KC-135 operations with the next-generation KC-46A Pegasus tanker while sustaining concurrent training and maintenance for its legacy fleets.
The program will deliver three primary facility complexes along with associated airfield civil site infrastructure:
USACE will use a streamlined competitive selection process to select the most highly qualified design-build team:
The agreement will be awarded to the most qualified design-build team to provide design development, preconstruction services, and construction. Post-award Phase 1 of PDB includes design and pre-construction services and Post-award Phase 2 includes the final design and construction. The agreement will be Firm-Fixed-Price (FFP). The FFP for successive design and construction milestones will be agreed to as the design progresses and funds become available.
| Sep 21, 2026 | [Special Notice (Updated)] FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, OK |
| Sep 23, 2026 | [Special Notice (Updated)] FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, OK |
| Sep 26, 2026 | [Special Notice (Updated)] FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, OK |
| Oct 6, 2026 | [Solicitation (Updated)] FY28 KC-46A Aircraft Beddown Infrastructure Program | Altus AFB, Oklahoma |

With GovernmentContracts, you can:
...Follow WWYK240015 - Rehab Tanks 62501E & 62501W Active Contract Opportunity Notice ID... ...
DEPT OF DEFENSE
Bid Due: 11/05/2026
...date type number file 10/19/2026 Bid Notice Six Month Bids: Steel Products; Tank ...
County of Tillman
Bid Due: 12/07/2026
...Follow AMENDMENT-05 FD203026007725_FA811826R0047- REMAN SOLICITATION F-15 Fuel Tank Safety Relief...
DEPT OF DEFENSE
Bid Due: 11/04/2026