Well Nos. 33, 35, and 40 Rehabilitation Project

Location: California
Posted: May 4, 2026
Due: May 27, 2026
Agency: City of Rohnert Park
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Title: Well Nos. 33, 35, and 40 Rehabilitation Project
Category: Public Works
Status: Open
Description:

The Project is located at three (3) well sites: Well No. 33 located at 7600 Camino Colegio, Well No. 35 located at 8661 Camino Colegio, and Well No. 40 located at 1600 East Cotati Avenue. The work is described generally as replacing the pump and motor at the referenced well sites.

Contractor must have a valid California contractor’s license, a Class C-57 Well Drilling Contractor license. The Engineer’s estimate for this Project is $175,000. The Contractor must begin work within fifteen (15) calendar days after official notice by the Project Manager to proceed with the work and must diligently prosecute the same to completion within forty (40) calendar days of that Notice.

A prebid conference will be held at 9:00 AM on Wednesday, May 13, 2026 starting at Well No. 35 located at 8661 Camino Colegio. Attendance at the prebid conference is mandatory for all prime contractors submitting a bid. For those who have attended the prebid conference, additional site visits can be scheduled if the City is notified twenty-four (24) hours in advance.

A digital copy of the drawings and specifications can be obtained on the Bids page of the City of Rohnert Park website ( www.rpcity.org/Bids) . A hard copy of the drawings and specifications may be obtained from Draftech for a non-refundable fee. Draftech Blueprinting is located at 1544 Terrace Way, Santa Rosa, CA 95404, phone number 707-578-9442.

To ensure receipts of addendums, any party interested in the Project shall place their information with the Department of Public Works at 707-588-3300 or For security reasons, you must enable JavaScript to view this E-mail address. .

Publication Date/Time:
5/4/2026 12:00 AM
Closing Date/Time:
5/27/2026 2:00 PM
Related Documents:

Attachment Preview

CITY OF ROHNERT PARK
INFORMAL BID REQUEST
CONTRACT DOCUMENTS, SPECIAL PROVISIONS AND
STANDARD SPECIFICATIONS
FOR
WELL NOS. 33, 35 AND 40 REHABILITATION PROJECT
BID DUE DATE: WEDNESDAY, MAY 27, 2026 AT 2:00 PM
MANDATORY PRE-BID MEETING DATE: WEDNESDAY, MAY 13, 2026 AT 9:00 AM
STARTING AT WELL 35 SITE
REQUEST FOR INFORMATION DUE: MONDAY, MAY 18, 2026 AT 4:00 PM
OAK #4873-5882-6144 v1 (Rev. 1-24)
Prepared by
City of Rohnert Park-
Public Works Department
600 Enterprise Drive
Rohnert Park, CA 94928
(707) 588-3300
CITY COUNCIL
Mayor - Emily Sanborn
Vice-Mayor - Jackie Elward
Council Member - Gerard Giudice
Council Member - Samantha Rodriguez
Council Member - Susan Hollingsworth Adams
City Manager - Marcela Piedra
City Engineer - Julian De Anda
Approved: ____________________________________
Julian De Anda Date
City Engineer

TABLE OF CONTENTS
Page
PART 1 - BID DOCUMENTS
Invitation for Informal Bids 1-1
Instructions to Bidders 1-3
Bidder's Proposal 1-7
Schedule of Bid Prices 1-9
Addendum Acknowledgment 1-10
Contractor's License Declaration 1-11
List of Subcontractors 1-12
Bid Bond 1-13
Noncollusion Declaration 1-14
Declaration of Eligibility to Contract 1-15
In-Use Off-Road Diesel-Fueled Fleets Certification 1-16
Sample Contract 1-17
Insurance 1-24
Sample Certificate of Insurance and Endorsements 1-25
PART 2 - SPECIAL PROVISIONS
Paragraph Page
Project Owner 2.01 2-1
Location and Description of Work 2.02 2-1
Insurance Requirements for Contractors 2.03 2-1
Bonds 2.04 2-5
Liquidated Damages 2.05 2-5
Withdrawals of Proposals 2.06 2-5
Drawings and Specifications 2.07 2-5
Cooperation and Collateral Works 2.08 2-6
Protection and Restoration of Existing Improvements 2.09 2-6
Permits and Licenses 2.10 2-6
Approved Debris Haulers 2.11 2-6
Field Review Prior to Bidding 2.12 2-7
Testing 2.13 2-7
Working Hours and Record Drawings 2.14 2-7
Project Notification 2.15 2-7
PART 3-STANDARD SPECIFICATIONS
SECTION 1 - DEFINITIONS AND TERMS
Paragraph Page
Definitions and Terms ........................................................................................... n/a 3-1
SECTION 2 - PROPOSAL REQUIREMENTS AND CONDITIONS
Intent ...................................................................................................................... 2.1 3-4
TOC-i
OAK #4873-5882-6144 v1 (Rev. 1-24)

SECTION 3 - AWARD AND EXECUTION OF CONTRACT
Award of Contract ....................................................................................... .......... 3.1 3-5
Bid Protests ................................................................... ......................................... 3.2 3-5
Return of Proposal Guarantees .............................................................................. 3.3 3-5
Bonds ................................................................................. .................................... 3.4 3-6
Execution of Contract ........................................................................ .................... 3.5 3-6
Failure to Execute Contract ................................................................................... 3.6 3-6
SECTION 4 - SCOPE OF WORK
Work to be Done by Contractor .................................................................. .......... 4.1 3-8
Final Cleanup ............................................................................................ ............. 4.2 3-8
Changes in the Contract - Effect Between Parties ...................................... .......... 4.3 3-8
Maintenance of Detours .............................................................................. .......... 4.4 3-11
Use of Materials Found on the Work .......................................................... .......... 4.5 3-12
SECTION 5 - CONTROL OF THE WORK
Authority of City Engineer ....................................................................... ............. 5.1 3-13
Plans..................................................................................................... ................... 5.2 3-13
Conformity with Plans ................................................................................ .......... 5.3 3-13
Working Drawings ...................................................................................... .......... 5.4 3-13
Coordination of Plans, Specifications, and Special Provisions .................. .......... 5.5 3-13
Interpretation of Plans and Specifications .................................................. .......... 5.6 3-14
Superintendence .......................................................................................... .......... 5.7 3-14
Lines, Grades and Measurements ............................................................... .......... 5.8 3-14
Inspection .................................................................................................... ........... 5.9 3-15
Unauthorized Work and Defective Work or Materials ............................... ......... 5.10 3-16
Methods and Equipment ............................................................................. .......... 5.11 3-16
Final Inspection and Acceptance ................................................................ .......... 5.12 3-17
Cleanup Work ........................................................................................... ............. 5.13 3-17
SECTION 6 - CONTROL OF MATERIALS
City-Furnished Materials ....................................................................................... 6.1 3-18
Materials to be Furnished by the Contractor ............................................... ......... 6.2 3-18
Source of Supply and Quality of Materials ................................................. ......... 6.3 3-18
Water and Electric Power ........................................................................... ........... 6.4 3-19
Materials and Workmanship; Warranty................................................................. 6.5 3-19
Storage of Materials .................................................................................... .......... 6.6 3-19
Samples and Specimens .............................................................................. .......... 6.7 3-20
Trade Names and Alternatives .................................................................... .......... 6.8 3-20
Removal of Equipment or Materials ........................................................... .......... 6.9 3-20
Testing of Materials .................................................................................... ........... 6.10 3-20
SECTION 7 - LEGAL RELATIONS AND RESPONSIBILITY
Laws to be Observed ................................................................................... .......... 7.1 3-21
Permits ........................................................................................................ ........... 7.2 3-21
Patent Claims .............................................................................................. ........... 7.3 3-21
Sanitary Provisions ..................................................................................... ........... 7.4 3-21
Right of Way and Right of Access .............................................................. ......... 7.5 3-22
Public Convenience and Access ................................................................. .......... 7.6 3-22
TOC-ii
OAK #4873-5882-6144 v1 (Rev. 1-24)

Storage of Materials in Public Streets, Roads or Highways ....................... ......... 7.7 3-22
Public Safety ............................................................................................... ........... 7.8 3-22
Street Closures, Detours, Barricades .......................................................... .......... 7.9 3-23
Use of Explosives ....................................................................................... ........... 7.10 3-23
Preservation of Property ............................................................................. ........... 7.11 3-24
Preservation of Monuments ........................................................................ .......... 7.12 3-24
Safeguarding Excavations and Structures ................................................... ......... 7.13 3-24
Emergencies and Responsibility for Damage ............................................. .......... 7.14 3-24
Disposal of Material Outside of City's Right of Way ............................. ............. 7.15 3-25
Contractor's Responsibility for Work ......................................................... .......... 7.16 3-25
City Engineer Cannot Waive Obligations ................................................. ........... 7.17 3-26
Rights in Land Improvements ..................................................................... .......... 7.18 3-26
Personal Liability ........................................................................................ ........... 7.19 3-26
Repair of Equipment ................................................................................... .......... 7.20 3-27
Contractor's Legal Address ......................................................................... .......... 7.21 3-27
Cooperation and Collateral Works .............................................................. .......... 7.22 3-27
Utilities ........................................................................................................ ........... 7.23 3-27
In-Use Off-Road Diesel-Fueled Fleets Regulation. .............................................. 7.24 3-30
SECTION 8 - PROSECUTIONS AND PROGRESS
Subcontracts ................................................................................................ ........... 8.1 3-32
Assignment .................................................................................................. .......... 8.2 3-32
Progress of the Work .................................................................................. ........... 8.3 3-32
Character of Workers ................................................................................ ............ 8.4 3-32
Temporary Suspension of Work ................................................................. .......... 8.5 3-32
Time of Essence, Liquidated Damages, Extension of Time by City ...... ............. 8.6 3-33
Default By Contractor.. ....... 8.7 3-34
Work at Night ........................................................................................................ 8.8 3-34
Maximum Length of Open Trench ............................................................. .......... 8.9 3-34
Limited Acceptance of Work ...................................................................... .......... 8.10 3-35
SECTION 9 - MEASUREMENT AND PAYMENT
Measurement for Payment .......................................................................... .......... 9.1 3-36
Scope of Payment ....................................................................................... ........... 9.2 3-36
Deductions from Payments ......................................................................... .......... 9.3 3-36
Schedule of Values...................................................................................... ........... 9.4 3-36
Payments and Monthly Estimates ............................................................... .......... 9.5 3-37
Payment for Extra Work ........................................................................................ 9.6 3-38
Final Payment ............................................................................. ........................... 9.7 3-38
SECTION 10 - CLAIMS BY CONTRACTOR
Obligation to File Claims for Disputed Work....................................................... 10.1 3-39
Form and Contents of Claim................................................................................. . 10.2 3-39
Informal Conference after Claim Submission....................................................... 10.3 3-40
Mediation ............................................................................................................... 10.4 3-40
Other Matters ......................................................................................................... 10.5 3-41
Compliance with Statutory Procedures ................................................................. 10.6 3-42
TOC-iii
OAK #4873-5882-6144 v1 (Rev. 1-24)

ATTACHMENTS
Attachment A - Scope of Work
Attachment B - Location Map
Attachment C - Well Data Sheets
TOC-iv
OAK #4873-5882-6144 v1 (Rev. 1-24)

PART 1 - BID DOCUMENTS
OAK #4873-5882-6144 v1 (Rev. 1-24)

INVITATION FOR INFORMAL BIDS
WELL NOS. 33, 35 AND 40 REHABILITATION PROJECT
Notice is hereby given that on WEDNESDAY, MAY 27, 2026, at 2:00:00 PM at 600 Enterprise Drive,
Rohnert Park, California, the City of Rohnert Park will receive bids for the WELL NOS. 33, 35 AND 40
REHABILITATION PROJECT ("Project"). Sealed bids shall be dropped off in the mailbox to the left of
the main door in front of the Department of Public Works Corporation Yard building, 600 Enterprise
Drive, Rohnert Park, CA 94928, before 2:00:00 PM on Wednesday, May 27, 2026. This is an informal
bid process. The City will open bids and inform bidders of the results at a later date.
The Project is located at three (3) well sites: Well No. 33 located at 7600 Camino Colegio, Well No. 35
located at 8661 Camino Colegio, and Well No. 40 located at 1600 East Cotati Avenue. The work is
described generally as replacing the pump and motor at the referenced well sites. Please see Attachment
A for more detailed information.
Contractor must have a valid California contractor's license, a Class C-57 Well Drilling Contractor
license. The Engineer's estimate for this Project is $175,000. The Contractor must begin work within
fifteen (15) calendar days after official notice by the Project Manager to proceed with the work and must
diligently prosecute the same to completion within forty (40) calendar days of that Notice.
Under California Labor Code Section 1770, et seq., copies of the determination of the Director of the
Department of Industrial Relations of the general prevailing rate of per diem wages for each craft,
classification and type of workman needed to execute the work are on file in and available to any interested
person on request at the Department of Public Works, or on the Internet at
http://www.dir.ca.gov/dlsr/PWD/index.htm, and are incorporated herein. (Labor Code Sec. 1773.2.)
Prevailing wage determinations must also be posted at each job site.
Labor Code Section 1725,5 provides that no contractor or subcontractor may be listed on a bid proposal
for a public works project nor awarded a contract for public work on a public works project unless
registered with the Department of Industrial Relations [with limited exceptions from this requirement for
bid purposes only under Labor Code section 1771.1(a)]. This Project is subject to compliance monitoring
and enforcement by the Department of Industrial Relations. All contractors and subcontractors must
furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor
Standards Enforcement). The prime contractor must also post job site notices prescribed by regulation.
Per California Civil Code Section 9550, a payment bond in the amount of one hundred percent (100%) of
the bid total will be required from the successful bidder for bids exceeding twenty-five thousand dollars
($25,000). A performance bond will also be required for bids exceeding twenty-five thousand dollars
($25,000). The bond(s) must be provided within ten (10) calendar days from notice of award and prior to
the performance of any work.
For any moneys earned by the Contractor and withheld by the City of Rohnert Park to ensure the
performance of the contract, the Contractor may, at its request and sole expense, substitute certain
securities equivalent to the amount withheld in the form and manner and subject to the terms and
conditions provided in the California Public Contracts Code Section 22300.
This notice incorporates by reference the terms, conditions and requirements of the specifications
approved by the City, any and all changes or amendments to the specifications and special instructions or
special notice issued or given to prospective bidders.
The City of Rohnert Park makes no representation or warranty of the condition of the jobsite. All
prospective bidders are requested to carefully review the project scope and to examine and conduct tests
Well Nos. 33, 35 and 40 Rehabilitation Project Part 1: Bid Documents
City of Rohnert Park Page 1-1
OAK #4873-5882-6144 v1 (Rev. 1-24)

or otherwise satisfy themselves as to the conditions at the Project site, subject to coordination with the
office of the Rohnert Park City Engineer.
Bids will be opened, examined and declared on said day and hour and referred to and considered by the
City Manager and Assistant City Manager for approval. Each bid must be submitted on the bid forms
furnished by the City, and each bid must include all the items shown on these forms. Substitute forms
may be used if specified in this Notice.
A prebid conference will be held at 9:00 AM on Wednesday, May 13, 2026 starting at Well No. 35 located at 8661
Camino Colegio. Attendance at the prebid conference is mandatory for all prime contractors submitting a bid. For
those who have attended the prebid conference, additional site visits can be scheduled if the City is notified twenty-
four (24) hours in advance.
A digital copy of the drawings and specifications can be obtained on the Bids page of the City of
Rohnert Park website (www.rpcity.org/Bids). A hard copy of the drawings and specifications may be
obtained from Draftech for a non-refundable fee. Draftech Blueprinting is located at 1544 Terrace Way,
Santa Rosa, CA 95404, phone number 707-578-9442.
To ensure receipts of addendums, any party interested in the Project shall place their information
with the Department of Public Works at 707-588-3300 or PWProjects@rpcity.org. Submit
requests for information (RFIs) by Monday, May 18, 2026 at 4:00 PM, to the Department of
Public Works at PWProjects@rpcity.org and/or KNguyen@rpcity.org.
The City reserves the right, in its sole discretion, to reject any or all bids, to re-bid, or to waive
inconsequential defects in bidding not involving time, price or quality of the work. The City may reject
any and all bids and waive any minor irregularity in the bids.
Any member of the public who needs accommodations should contact the ADA Coordinator at
adacoordinator@rpcity.org or 707-588-2224. For more information visit
https://www.rpcity.org/city_hall/departments/human_resources/a_d_a_and_accessibility_resources.
Posted Date: May 4, 2026 /s/ SYLVIA LOPEZ CUEVAS
City Clerk of the City of Rohnert Park
Well Nos. 33, 35 and 40 Rehabilitation Project Part 1: Bid Documents
City of Rohnert Park Page 1-2
OAK #4873-5882-6144 v1 (Rev. 1-24)

INSTRUCTIONS TO BIDDERS
The bidder must file its bid with the Project Coordinator, Department of Public Works of the City of Rohnert
Park, California, using the copy of the Bidder's Proposal and Schedule of Bid Prices furnished with the
specifications. These documents must be placed in a sealed envelope marked,
WELL NOS. 33, 35 AND 40 REHABILITATION PROJECT
and addressed to the Project Coordinator, Attn: Kelsey Nguyen. Said sealed bids must be dropped off in
the mailbox to the left of the main door in front of the Department of Public Works Corporation Yard
building, located at 600 Enterprise Drive, Rohnert Park, CA 94928 before 2:00:00 PM on Wednesday,
May 27, 2026. The bidder must not file the book of Special Provisions or the Contract Drawings with his
bid.
The bidders' attention is directed to the schedule of bid prices that requires this project be bid as a combination
of unit price and lump sum contract.
Bid Forms. Each proposal and all bid submittals must conform and be responsive to the Invitation and the
Plans, Specifications and Contract documents.
The wording of the proposal and bid submittals must not be changed. Any additions, conditions, limitations,
or provisions inserted by the bidder will render the proposal irregular and may cause its rejection. Erasures
or interlineations in the proposal or other submittals must be explained or noted over the signature of the
bidder.
In case of discrepancy between a unit price and the total price set forth for the unit price item, the unit price
shall prevail. Discrepancies between the indicated sum of any column of numerals and the correct sum
thereof will be resolved in favor of the correct sum. Discrepancies between written words and figures, or
words and numerals, will be resolved in favor of the words.
Prices. All proposals must give the prices proposed, both in writing and in figures in the respective spaces
provided, and must be signed by the bidder, who must fill out all blanks in the proposal form as therein
required.
Rejection of Bids. Proposals may be rejected if they show any alterations of form, additions not called for,
conditional proposals, incomplete proposals, erasures, or irregularities of any kind, excepting that erasures or
delineations in the proposal will be accepted as provided under "Bid Forms" above.
When proposals are signed by an agent, other than the officer or officers of a corporation authorized to sign
Contracts on its behalf or a member of a co-partnership, a Power of Attorney must be on file with the City
prior to opening proposals or must be submitted with the proposal; otherwise, the proposal may be rejected
as irregular and unauthorized.
Bid Security. All proposals must be presented under sealed cover and accompanied by one of the following
forms of bidder's security: Cashier's check, certified check, or a bidder's bond in the form provided herein,
executed by an admitted surety insurer authorized to transact business in this State, made payable to the City.
The submitted bidder's bond must be the City's bid bond. The security must be in an amount equal to at least
ten percent (10%) of the proposal amount. A proposal will not be considered unless one of the forms of
bidder's security is enclosed with it. A bidder's bond will not be accepted unless it has been properly filled
out and executed by both the surety and the bidder.
Withdrawal of Bid. Any bid may be withdrawn at any time prior to the time fixed in the public notice for
the opening of proposals only by a written request for withdrawal of the bid filed with the City Engineer. The
request must be executed by the bidder or its duly authorized representative. The withdrawal of a bid does
Well Nos. 33, 35 and 40 Rehabilitation Project Part 1: Bid Documents
City of Rohnert Park Page 1-3
OAK #4873-5882-6144 v1 (Rev. 1-24)

not prejudice the right of the bidder to file a new bid. No bid may be withdrawn after the time fixed in the
public notice for the opening of bids.
Means of Submittal. Proposals may be submitted by e-mail or hard copy; however, proposals failing to
reach the office of the City prior to the date and time set for receipt of same will not be considered.
Multiple Proposals. More than one proposal from an individual, a firm, partnership, corporation or an
association under the same or different names, will not be considered. Reasonable grounds for believing that
any bidder is interested in more than one proposal for the work contemplated will cause the rejection of all
proposals in which such bidder is interested. If there is reason for believing that collusion exists among the
bidders, none of the participants in such collusion will be considered in this or future proposals. Proposals in
which the prices obviously are unbalanced may be rejected.
License Requirement. No proposal will be accepted from a Contractor who is not licensed in accordance
with law under the provisions of Division III, Chapter 9, of the Business and Professions Code of the State
of California, or from a Contractor that has been deemed irresponsible or unresponsive.
Subcontractors. Subcontractors listed by the bidder in accordance with the Special Provisions included
herein must be properly licensed under the laws of the State of California for the type of work which they are
to perform.
All bidders are hereby notified that they will be required to comply strictly with the provisions of
Sections 4100 to 4113, inclusive, of the California Public Contract Code.
Each bidder must file with its proposal the name and location of the place of business, contractor's license
number and Department of Industrial Relations registration number, of each Subcontractor who will perform
a portion of the Contract work in an amount in excess of one-half of one percent (0.5%), or in the case of
bids for the construction of streets or highways, including bridges, in excess of one-half of one percent
(0.5%) of the total bid or ten thousand dollars ($10,000). In each such instance, the nature and extent of the
work to be sublet must be described.
The General Contractor to whom the Contract is awarded will not be permitted, without the written consent
of the City, to substitute any person as Subcontractor in place of the Subcontractor designated in the original
proposal, or to permit any Subcontract to be assigned or transferred, or to allow it to be performed by anyone
other than the original Subcontractor. The City may consent to the substitution of another person as
Subcontractor if the original Subcontractor, after having reasonable opportunity to do so, fails or refuses to
execute the written Contract presented to it by the General Contractor, when said written Contract is based
upon the conditions of the general Contract and complies with the Subcontractor's written proposal.
The failure of the Contractor to specify a Subcontractor for any portion of the Contract work in excess of one-
half of one percent (0.5%) of the total Contract price must be deemed to indicate that the Contractor intends
to perform such portion itself. The subletting or Subcontracting of work for which no Subcontractor was
designated in the original proposal and which is in excess of one-half of one percent (0.5%) of the total
Contract price will be allowed only with the written consent of the City and then only in cases of public
emergency or necessity as determined by the City. Under such circumstances, the City is required to establish
the facts constituting the emergency or necessity and to reduce its findings to a written public record.
Violations of the provisions of these specified sections of the Code must be deemed to be a violation of the
Contract, and the City, because of any such violations, may cancel the Contract. The Contractor, after any
such violations, will be penalized up to twenty percent (20%) of the amount of the Subcontract involved.
Material. The bidder may be required to furnish, as part of the submittal process, a complete statement of
the origin, composition, and manufacture of any or all materials to be used in the construction of the work,
together with samples. Such samples may be subjected to the tests provided for in these specifications or in
Well Nos. 33, 35 and 40 Rehabilitation Project Part 1: Bid Documents
City of Rohnert Park Page 1-4
OAK #4873-5882-6144 v1 (Rev. 1-24)

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Special Districts Blanket # Blanket # Buyer Jessica Barajas Description Prado Regional Park ...

County of San Bernardino

Bid Due: 10/08/2026

...Pre Bid Conference Non Mandatory Category Information UNSPSC 71121200 Well drilling &...; construction ...

State Government of California

Bid Due: 9/24/2026

...of work: Concrete; Construction Traffic Control Services; Drilling Services (excludes water well... drilling); ...

San Francisco Public Utilities Commission

Bid Due: 10/15/2026

...of work: Concrete; Construction Traffic Control Services; Drilling Services (excludes water well... drilling); ...

San Francisco Public Utilities Commission

Bid Due: 9/24/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.