| Location: | Oklahoma |
|---|---|
| Posted: | Aug 29, 2025 |
| Due: | Sep 8, 2025 |
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 36C24W25Q0338 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
NOTICE FOR REQUEST FOR QUOTE AMENDMENT
SOLICITATION NUMBER: 36C24W25Q0338
AMENDMENT NUMBER: 0002
DATE: August 29, 2025
PROJECT NUMBER: N/A
PROJECT TITLE: Kitchen Package
LOCATION: VA Medical Center, Tulsa, OK, 74127
REASON FOR AMENDMENT: CAD Drawings, Status of Site, Ventilation, and Obstacles
______________________________________________________________________________ AMENDMENT: 0001
Question: 1 – CAD Drawings: Is there a CAD drawing of the kitchen available?
VA Response: We do not have access to up-to-date CAD files. All available and relevant drawings will be made available to the awarded vendor. Drawings will at minimum be PDFs of electrical, plumbing, and architectural features that are relevant. It is the contractor’s responsibility to verify any needed measurements and positions of MEP (mechanical, electrical, plumbing) in the field prior to purchasing equipment.
Question: 2 – Status of Site Condition: Will the site be total install ready for the equipment?
VA Response: The site will be ready for installation at the time of installation. There is a possibility of other contractors performing work in the space. If that is the case, appropriate scheduling and coordination will be done to ensure minimal disruption to work being performed.
Question: 3 – Ventilation: Correct electrical work and ventilation on site?
VA Response: Ventilation and electrical will be in place at the time of installation. The VA will be responsible for correcting any mechanical, electrical or plumbing infrastructure deficiencies if any are found.
Question: 4 – Kitchen Accessibility: Is the kitchen easily accessible? Any obstacles?
VA Response: The kitchen is on the first floor, with nearby elevators and exterior doors. The kitchen door openings are 44”.
THE DUE DATE FOR OFFERS REMAINS UNCHANGED September 08, 2025.
All other terms and conditions remain unchanged.
| Aug 25, 2025 | [Solicitation (Original)] Kitchen Package for the Tulsa VAMC |
| Aug 26, 2025 | [Solicitation (Updated)] Kitchen Package for the Tulsa VAMC |
| Aug 27, 2025 | [Solicitation (Updated)] Kitchen Package for the Tulsa VAMC |
| Sep 2, 2025 | [Solicitation (Updated)] Kitchen Package for the Tulsa VAMC |

With GovernmentContracts, you can:
Solicitation No. Solicitation Contact Opening Date/Time Status Award OS-1829900-JDT Bond Underwriter Services Joe
Oklahoma State University
Bid Due: 11/12/2048
Follow TINKER AFB MAC BOA WWYK260003 REPAIR ROOF, ELECT, HVAC & RESTROOMS B#4019
DEPT OF DEFENSE
Bid Due: 6/08/2026
Follow REPAIR TAXIWAY A, Phase 1 and Phase 2 (Option) both Unfunded Active
DEPT OF DEFENSE
Bid Due: 6/23/2026
Bid Number: Gen 26-5 Bid Title: Marland Grand Home-Re-Roofing Project Category: Marland Grand
City of Ponca City
Bid Due: 6/04/2026