| Location: | Federal |
|---|---|
| Posted: | Aug 29, 2025 |
| Agency: | INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 191BWC24C0006P00001 |
| Publication URL: | To access bid details, please log in. |
The U.S. Section of the International Boundary and Water Commission (USIBWC) requires additional rehabilitation and replacement work on the Belt Filter Press (BFP) system at the South Bay International Wastewater Treatment Plant (SBIWTP). This includes replacement of motors, pumps, piping, electrical components, SCADA integration, and other critical infrastructure to ensure safe and continuous operation of the facility.
This work is in addition to the original scope awarded under Contract No. 191BWC24C0006 and is necessary to address components that were removed from the original award to remain within funding constraints.

With GovernmentContracts, you can:
...Follow Z--Rehabilitation of Water and Wastewater System Active Contract Opportunity Notice ID... and ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/30/2026
...Follow GRSM NEWFOUND GAP WASTEWATER SYSTEM WORK Active Contract Opportunity Notice ID... WASTEWATER ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/23/2026
...Follow Y--GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 11/02/2026
...Follow H--POTABLE AND WASTEWATER TREATMENT PLANT OPERATIONS AT FLIGHT 93 NATIONAL MEMORIA Active...: ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/22/2026