| Location: | Federal |
|---|---|
| Posted: | Aug 29, 2025 |
| Agency: | INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 191BWC24C0006P00001 |
| Publication URL: | To access bid details, please log in. |
The U.S. Section of the International Boundary and Water Commission (USIBWC) requires additional rehabilitation and replacement work on the Belt Filter Press (BFP) system at the South Bay International Wastewater Treatment Plant (SBIWTP). This includes replacement of motors, pumps, piping, electrical components, SCADA integration, and other critical infrastructure to ensure safe and continuous operation of the facility.
This work is in addition to the original scope awarded under Contract No. 191BWC24C0006 and is necessary to address components that were removed from the original award to remain within funding constraints.

With GovernmentContracts, you can:
...Gulf Shores Utilities - Water Treatment Plant #5 Gulf Shores, Alabama July 30, ...
Goodwyn Mills Cawood(GMC)
Bid Due: 7/30/2026
...Steven M. Clouse WRC Biosolids Upgrades IN-PERSON CONTRACTOR OUTREACH MEETING July 28, 2025 ...
San Antonio Water System
Bid Due: 8/03/2026
...IN-PERSON Contractor Outreach Informational Meeting Please see clarification document... Contractor Outreach Informational Meeting ...
San Antonio Water System
Bid Due: 7/01/2026
...Service Code: N046 - INSTALLATION OF EQUIPMENT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT... ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/22/2026