| Location: | Washington |
|---|---|
| Posted: | Jan 17, 2025 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Franklin Center has deteriorating stairs and is a five (5) story building, semi-enclosed concrete fire staircase. The stairs at the Dolle Building are a single set that go from the parking lot to the basement level of the building.
Addendum 1 - Issued Thursday, December 12, 2024
Addendum 2 - Issued Monday, December 16, 2024
A meeting has been scheduled.

With GovernmentContracts, you can:
...South Concourse Evolution (SCE), Bid Package 2.1.01 - Building Concrete - New Status ...
Port of Seattle
Bid Due: 10/15/2026
...concrete gravity sewer main and eleven 48-inch diameter concrete manholes. the Contractor shall ...
City of Vancouver
Bid Due: 9/22/2026
..., various stripe painting, concrete and asphalt saw cutting and coring of non-ACM/non-hazardous ...
Port of Seattle
Bid Due: 9/29/2026
...class 4 - asphalt concrete paving. Public Works Publication Date September 04, 2026 ...
State Government of Washington
Bid Due: 10/07/2026