| Location: | Washington |
|---|---|
| Posted: | Jan 17, 2025 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Franklin Center has deteriorating stairs and is a five (5) story building, semi-enclosed concrete fire staircase. The stairs at the Dolle Building are a single set that go from the parking lot to the basement level of the building.
Addendum 1 - Issued Thursday, December 12, 2024
Addendum 2 - Issued Monday, December 16, 2024
A meeting has been scheduled.

With GovernmentContracts, you can:
.... Repair damage to the port bow. Accomplish modification and repair of swim ...
DEPT OF DEFENSE
Bid Due: 12/04/2026
...shower/eyewash stations, chain-link fence, gates, stairs, and various electrical conduit, water...
Pierce County
Bid Due: 6/10/2026
...to the port bow. Accomplish modification and repair of swim platform stairs. Restore ...
DEPT OF DEFENSE
Bid Due: 12/04/2026
.... Accomplish modification and repair of swim platform stairs. Restore preservation system...
DEPT OF DEFENSE
Bid Due: 12/04/2026