2. ADDITIONAL QUESTIONS RECEIVED BY OCTOBER 7TH AND ANSWERS
Answers are in red.
Are there any specific qualifications for actual athletic field contractors such as:
1. # of infields constructed per year for ____ years?
Three comparable completed projects: Provide three softball or baseball
o
field renovation projects completed within the past five years, including
completion dates and contract values.
Relevant work performed: Describe experience with laser grading,
o
underdrain installation, infield sand and clay installation, and athletic-field
sod installation.
2. specific laser guided equipment specific for infield construction?
Identify the type of laser-guided equipment that will be used to ensure accurate
field grading.
3. irrigation license needed for any necessary field adjustments that may be
required?
Yes. An irrigation license will be required for any necessary adjustments to the
irrigation system.
3. BID FORM
The Bid Form is updated to Rev. 1 and is attached at the end of Addendum 1. Bid Form
Rev. 1 must be used to submit a bid.
The City reserves the right to award all or any portion of this Proposal, or to reject any
bid or any portion of a Proposal, in the best interest of the City.
Bid Form Rev 1 follows after the End of Addendum 4.
4. WASHINGTON FIELD DRAINAGE DOCUMENT
The Washington Field Drainage Document follows after the End of Addendum 4 as
ATTACHMENT 1.
All else remains the same.
End of Addendum 4
ITB # 1857
Renovations and Improvements at
Washington Field, Milford CT
BID FORM Rev. 1
City of Milford
Purchasing Department
70 West River Street
Milford, CT 0660
We wish to submit our Bid on the above referenced ITB. We have enclosed our Bid surety in the
amount of 5% of our Bid. We have read and understand your specifications, Invitation to Bid,
General Information to Bidders, and are submitting our Bid in full compliance with all of the stated
conditions.
Following award, we will provide the required Certificate of Insurance from the following
insurance company:________________________________________.
We hereby submit the following Bid for the project identified below, or for both projects if
submitting for both, as indicated herein:
Renovations and Improvements at
Washington Field, Milford CT
Total Bid for Project: $ _______________________________ (figures)
________________________________________________________________
(Written Out)
ADD/DEDUCT ALTERNATE: OUTFIELD RENOVATION
Total Bid for Outfield Renovation: $ ________________________________ (figures)
________________________________________________________________
(Written
UNIT PRICING:
ITEM DESCRIPTION UNIT PRICE
1 Sprinkler Head Replacement $____________ per head
Addenda:
The following Addenda for this contract were received:
Number Date
_______ __________
_______ __________
_______ __________
_______ __________
- 1 -
The undersigned bidder certifies that his bid is made independently and without collusion,
agreement, understanding, or planned course of action with any other bidder and that the contents
of his bid shall not be disclosed to anyone other than his employees, agents, or sureties prior to the
official bid opening.
NAME OF COMPANY:
ADDRESS:
NAME AND TITLE OF
AGENT SUBMITTING
BID:
PHONE:
FAX :
SIGNATURE:
The following documents required to be submitted with this Bid page are:
1) Non-Collusive Affidavit
2) Affirmative Action Statement
3) W-9 Form
4) Bid Bond
5) Labor and Materials Payment Bond
6) Performance Bond
7) Statement of Bidder's Qualifications
8) Drug Free Workplace Certificate
9) Certificate of Insurance, together with endorsements, for the following will be required
upon award of contract and must remain in effect during the term of the contract
a) Identify the City of Milford as a certificate holder
b) Name the City of Milford, its Governing Board, Official, Agents and Employees as
an additional insured.
c) Include the language "on a primary, non-contributory basis" and "waiver of
subrogation applies in favor of the City of Milford and all other required parties."
d) Workers Compensation - Statutory Limits
End of Bid Form Rev. 1
- 2 -
ATTACHMENT 1
WASHINGTON FIELD DRAINAGE CONCEPT
| SHE ET C1
CITY OF MILFORD PUBLIC WORKS | PROPOSED PIPE ROUTING AND COLLECTION POINTS
PIPE AND STRUCTURE KEY
P1 6 in solid HDPE main*
FD1 - FRONT OF DUGOUT A FD2 - FRONT OF DUGOUT B
FLAT COLLECTION DRAIN, APPROX. 30 ft FLAT COLLECTION DRAIN, APPROX. 30 ft
RUN THE FULL LENGTH OF DUGOUT RUN THE FULL LENGTH OF DUGOUT P2 4 in solid HDPE branch*
2 1 x 6 flat drain - approx. 30 ft each
1
CO1 Cleanout at Wye junction J1
1 in x 6 in FLAT COLLECTION DRAIN CO2 Cleanout outside homerun fence
APPROX. 30 ft AT EACH DUGOUT FRONT
6 in FLAT-SYSTEM T + END-OUT TO
4 in SOLID PIPE FD1 / FD2 Flush inlet / collection points
CB Existing catch basin - field verify
PROPOSED PIPE GRADE 1.00%
CO1 - CLEANOUT AT WYE J1
4 in BRANCH JOINS 6 in MAIN
PROVIDE ACCESSIBLE CLEANOUT
RUN LENGTH FALL
LOCATION / INVERT - FIELD VERIFY
P2 - 4 in SOLID HDPE BRANCH*
153.57 ft @ 1.00% TO J1 FD1 to catch basin 342.96 ft 3.43 ft
REQUIRED FALL = 1.54 ft
FD2 to Wye J1 153.57 ft 1.54 ft
Fall = length x 0.01. Branch P2 ends at J1 and then shares main P1. The full
main length is not added again to the branch.
P1 - 6 in SOLID HDPE MAIN*
342.96 ft TOTAL @ 1.00% FD1-
TO-CB FALL = 3.43 ft
CONTRACTOR RESPONSIBILITY
EXISTING HOMERUN FENCE
ALL DRAINAGE SHALL BE POSITIVE. THE CONTRACTOR IS
RESPONSIBLE FOR PROVIDING AND VERIFYING POSITIVE
DRAINAGE THROUGHOUT THE SYSTEM.
CO2 - CLEANOUT OUTSIDE HOMERUN FENCE
ON SOLID MAIN P1, JUST BEYOND FENCE
CATCH BASIN CONNECTION INVERT SHALL BE THE
FINAL LOCATION BY CONTRACTOR
RESPONSIBILITY OF THE CONTRACTOR.
EXISTING CATCH BASIN - CONNECTION INVERT BY CONTRACTOR
CORE AND SEAL SOLID PVC CONNECTION STUB
VERIFY STRUCTURE, OUTLET INVERT AND CAPACITY
ALIGNMENT DISTANCES: USER AERIAL LABELS. FLAT DRAINS: APPROX. 30 ft EACH, FULL DUGOUT LENGTH.
Contractor shall verify elevations and provide positive drainage to the existing catch basin. Final cleanout positions and connection invert shall be field established by the contractor.
SOURCE: USER AERIAL AND ENGINEER REFERENCE | REVISED OCTOBER 28, 2026 | REV. 1 | NOT TO SCALE WASHINGTON FIELD | C1 OF 3
WASHINGTON FIELD DRAINAGE CONCEPT
| SH EET C2
CITY OF MILFORD PUBLIC WORKS | PIPE FALLS, FLAT DRAIN, CLEANOUTS AND CATCH BASIN CONNECTION
1 PROPOSED 1.00% PIPE GRADES AND FALL 2 FLAT COLLECTION DRAIN TO SOLID PIPE
P1 FD1 / DUGOUT A TO EXISTING CATCH BASIN APPROX. 30 ft - FULL DUGOUT LENGTH
FD1 342.96 ft at 1.00%
CO2 1 in x 6 in FLAT DRAIN 4 in SOLID OUTLET
CB
CO1 / J1
Required pipe fall: 342.96 x 0.01 = 3.43 ft
6 in flat-system T End-out adapter
P2 FD2 / DUGOUT B TO WYE J1 + CLEANOUT CO1
Provide the flat collection drain along the full length of each dugout, approximately 30 ft each. Connect to the solid
FD2 153.57 ft at 1.00% main or branch through compatible fittings and collection point.
J1
Reference: ADS AdvanEdge 1 x 6 flat drain. Confirm model, dimensions and fittings. The 6 in T is a flat-system fitting
designation.
Required pipe fall to J1: 153.57 x 0.01 = 1.54 ft
3 CLEANOUT LOCATIONS AND ACCESS 4 SOLID MAIN TO EXISTING CATCH BASIN
CO1 - AT WYE J1 CO2 - OUTSIDE HOMERUN FENCE CONNECTION INVERT - CONTRACTOR RESPONSIBILITY
Core and seal basin wall
4 in branch P2* Finished grade
Cleanout access
6 in SOLID HDPE MAIN*
* Concept size; hydraulic sizing TBD
6 in main P1*
Accessible capped riser on solid main HDPE-to-PVC adapter and solid PVC stub
Existing outlet / sump
Provide accessible cleanouts at both locations. Set caps / covers flush and secure where subject to field or maintenance
traffic. Final riser, fitting and cover arrangement require Engineering review.
Contractor shall determine, verify and set the catch basin connection invert to maintain positive drainage. Verify outlet
elevation, basin condition, cover and downstream capacity before installation.
GRADE BASIS: Main P1 = 342.96 ft from FD1 to CB. Branch P2 = 153.57 ft from FD2 to J1. Both retain the proposed 1.00% pipe grade. The branch continues through part of the main; total branch-to-CB fall depends on the field-verified J1 station and connection
geometry. Details are not to scale.
ALL DRAINAGE SHALL BE POSITIVE. POSITIVE DRAINAGE AND THE CATCH BASIN CONNECTION INVERT ARE THE CONTRACTOR'S RESPONSIBILITY.
SOURCE: USER AERIAL AND ENGINEER REFERENCE | REVISED OCTOBER 28, 2026 | REV. 1 | NOT TO SCALE WASHINGTON FIELD | C2 OF 3
WASHINGTON FIELD DRAINAGE CONCEPT
| SHE ET C3
CITY OF MILFORD PUBLIC WORKS | ILLUSTRATED PIPE, FITTING AND STRUCTURE KEY
Match the colors and identifiers below to C1. Generic component views are shown for identification.
01 CLEANOUTS 02 SOLID HDPE PIPE 03 FLAT COLLECTION DRAIN 04 FLAT-TO-ROUND FITTINGS
CO1 AT WYE / CO2 OUTSIDE FENCE P1 / P2 | CONVEYANCE TO OUTFALL APPROX. 30 ft AT EACH DUGOUT 6 in FLAT-SYSTEM T + 4 in OUTLET
ACCESSIBLE CAPPED RISER FLAT-SYSTEM T
FLATTENED DRAINAGE CORE
6 in*
END-OUT
4 in*
NARROW PROFILE / WATER INLETS
GENERIC SECTION 4 in ROUND SOLID
Provide two accessible cleanouts: CO1 at the Wye junction Closed wall carries collected water. Blue = P1 main; Run the flat collection drain the full length of each dugout, A compatible flat-system T and end-out adapter connect
J1, and CO2 on the solid main just outside the homerun magenta = P2 branch. Both runs retain the proposed approximately 30 ft each. Reference: 1 in x 6 in. the flat drain to solid round pipe. The 6 in fitting
fence. Secure caps / covers and field-verify final locations. 1.00% pipe grade. designation refers to the flat system. Confirm all fittings
before installation.
05 FLUSH FIELD INLET 06 WYE WITH CLEANOUT 07 PVC STUB AND WALL SEAL 08 EXISTING CATCH BASIN
FD1 / FD2 | DUGOUT COLLECTION J1 / CO1 | BRANCH INTO MAIN SOLID CONNECTION AT EXISTING CB CB | RECEIVING STORM STRUCTURE
EXISTING GRATE / FRAME
ENTIRE ASSEMBLY FLUSH
CO1 AT WYE HDPE
SOLID PVC
ADAPTER
FLOW TOWARD EXISTING CB BOOT / SEAL
Secure the cover and any resilient protection as one flush A swept Wye joins the 4 in branch to the 6 in main in the Use a compatible HDPE-to-PVC adapter, solid PVC stub and Field-verify the basin, existing outlet, sump and
assembly. Inlets and covers in play require Engineering flow direction. Provide cleanout CO1 at this junction. approved boot / watertight seal at the cored basin wall. downstream capacity. Contractor shall determine and set
approval for cleats, sliding and maintenance loads. No Contractor is responsible for the catch basin connection the connection invert and verify positive drainage through
loose mats. invert. the complete system.
IDENTIFICATION GUIDE - GENERIC VIEWS, NOT TO SCALE
SOURCE: USER AERIAL AND ENGINEER REFERENCE | REVISED OCTOBER 28, 2026 | REV. 1 | NOT TO SCALE WASHINGTON FIELD | C3 OF 3

With GovernmentContracts, you can:
Project ID: Title: RFP027-35 Evansville East Well Rehabilitation Addenda: 0 Release Date: 10/30/2026
City of Meriden
Bid Due: 11/20/2026
Invitation to Bid for Construction Services Rowland Government Center - Energy Audit Implementation
State Government of Connecticut
Bid Due: 12/15/2026
Project ID: 26/27-17 Title: FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3
Town of Manchester
Bid Due: 11/17/2026
Prequalification: E Building Heat Pipe Replacement UConn Health (UCH) will be replacing existing
State Government of Connecticut
Bid Due: 11/17/2026