| Location: | Minnesota |
|---|---|
| Posted: | Jun 22, 2026 |
| Due: | Jul 14, 2026 |
| Agency: | Metropolitan Airports Commission (MAC) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Solicitation177 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project is the second part of a 4-part waterproofing effort to completely remove and recoat the T1 Tug Drive with new waterproofing. The project includes temporary full-height poly enclosures per each phased area of work; traffic control; removal and relocations of furnishings; expansion control; waterproofing and pavement markings; concrete repair to concrete topping and structural slab as needed; mechanical piping & floor drain replacements.

With GovernmentContracts, you can:
..., grouting, and painting. 4.2. Pier cap concrete repair - removal area and ...
State Government of Minnesota
Bid Due: 7/24/2026
.... Approximately 7000 TON, Aggregate Base Class 5, 5. Approximately 30000 SF, Concrete ...
City of Bloomington
Bid Due: 7/23/2026
...and Grading, Grade and Surface, Pavement Removal, Excavation, Paving (Asphalt or Concrete) Description...
WSB
Bid Due: 7/23/2026