| Location: | Minnesota |
|---|---|
| Posted: | Jun 22, 2026 |
| Due: | Jul 14, 2026 |
| Agency: | Metropolitan Airports Commission (MAC) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Solicitation177 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project is the second part of a 4-part waterproofing effort to completely remove and recoat the T1 Tug Drive with new waterproofing. The project includes temporary full-height poly enclosures per each phased area of work; traffic control; removal and relocations of furnishings; expansion control; waterproofing and pavement markings; concrete repair to concrete topping and structural slab as needed; mechanical piping & floor drain replacements.

With GovernmentContracts, you can:
...26-99580 Occidental Blvd & Glenwood St. Down Drain Replacement 26 99580 Invitation To ...
City of Duluth
Bid Due: 7/28/2026
...Drainage Structure EA 1 Random Riprap CL III CU YD 25 6" Perf ...
City of Mankato
Bid Due: 8/04/2026
.... 6. Consideration/recommendation of drain extensions and improved drainage around the pier tables...
City of St. Cloud
Bid Due: 8/20/2026