| Location: | Minnesota |
|---|---|
| Posted: | Jun 22, 2026 |
| Due: | Jul 14, 2026 |
| Agency: | Metropolitan Airports Commission (MAC) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Solicitation177 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project is the second part of a 4-part waterproofing effort to completely remove and recoat the T1 Tug Drive with new waterproofing. The project includes temporary full-height poly enclosures per each phased area of work; traffic control; removal and relocations of furnishings; expansion control; waterproofing and pavement markings; concrete repair to concrete topping and structural slab as needed; mechanical piping & floor drain replacements.

With GovernmentContracts, you can:
...- Temporary,Heating, Ventilation, Air Conditioning (HVAC),Parks, Recreation, Buildings &..., Parks, Recreation, Buildings & ...
WSB
Bid Due: 9/29/2026
..., excavation dewatering, temporary wastewater conveyance, contaminated soil handling, and work on sewer...
Metropolitan Council
Bid Due: 10/08/2026
..., Buildings & Facilities, Erosion Control - Temporary Description: The Project includes obtaining ...
WSB
Bid Due: 9/29/2026
...Highway Design - Level 2 14.1 Traffic Signal Design 14.3 Roadway Lighting Design ...
State Government of Minnesota
Bid Due: 9/30/2026