Crown Agricultural Building Boiler Addition

Location: North Carolina
Posted: May 1, 2026
Due: May 15, 2026
Agency: State Government of North Carolina
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 600600CRBoiler
Publication URL: To access bid details, please log in.
Solicitation Number: 600600CRBoiler
Project Title: Crown Agricultural Building Boiler Addition
Description: Scope of demolition and removal work is indicated on drawings . HVAC: Alter existing system and add new construction, keeping existing in operation. Electrical Power and Lighting: Alter existing system and add new construction, keeping existing in operation.
Opening Date: 5/15/2026 1:30 PM
Posted Date: 5/2/2026
Status: Open
Department: COUNTY OF CUMBERLAND
Solicitation Number
*
600600CRBoiler
Department
COUNTY OF CUMBERLAND
Status Reason
Open
Opening Date
2026-05-15T13:30:00.0000000
Posted Date
*
2026-05-01T18:10:45.0000000Z
Primary Commodity Code
Construction Services
Mandatory Conference/Site Visit
2026-05-07T04:00:00.0000000Z
Special Instructions
Sealed Bid
Solicitation Type
*
Select RFP IFB RFI
Owner
CHRISTINE DUCHENEAUX
Description
Scope of demolition and removal work is indicated on drawings . HVAC: Alter existing system and add new construction, keeping existing in operation. Electrical Power and Lighting: Alter existing system and add new construction, keeping existing in operation.

Attachment Preview

CROWN CENTER - AGRICUTURAL BUILDING
BOILER ADDITION
301 E MOUNTAIN DR
FAYETTEVILLE, NC 28306
BID DOCUMENTS
MAY 2026
TWC PROJECT #: 2877-S
CumberlandCountyAgriCenter-
000000-1 COVERSHEET
BoilerAddition

This page intentionally left blank

CERTIFICATIONS PAGE
A. Mechanical and Plumbing Specifications
I, Scott L. Ennis, P.E., hereby certify that Division 01, Division 23, and Division 00 of the,
Cumberland County Agri Center - Boiler Addition Project Manual were prepared by me or under
my direct supervision.
B. Electrical Specifications
I, Robert E. Egan, P.E., hereby certify that Division 26 of the, Cumberland County Agri Center -
Boiler Addition Project Manual were prepared by me or under my direct supervision.
END OF SECTION
CumberlandCountyAgriCenter-
000105-1 CertificationsPage
BoilerAddition

This page intentionally left blank

TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 00 COVER SHEET 1
00 01 05 CERTIFICATIONS PAGE 1
00 11 13 ADVERSTIMENT FOR BIDS 1
00 42 00 PROPOSAL FORM 4
00 43 16 MWBE FORMS 1
00 52 00 CONTRACT 5
00 61 13 PERFORMANCE BOND 5
00 61 14 PAYMENT BOND 4
00 72 00 GENERAL CONDITIONS 1
00 73 00 SUPPLEMENTARY GENERAL CONDITIONS 5
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 SUMMARY 2
01 20 00 PRICE AND PAYMENT PROCEDURES 2
01 21 00 ALLOWANCES 1
01 25 00 SUBSTITUTION PROCEDURES 2
01 30 00 ADMINISTRATIVE REQUIREMENTS 7
01 32 16 CONSTRUCTION PROGRESS SCHEDULE 2
01 40 00 QUALITY REQUIREMENTS 3
01 60 00 PRODUCT REQUIREMENTS 3
01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS 7
01 78 00 CLOSEOUT SUBMITTALS 4
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 05 00 HVAC GENERAL PROVISIONS 8
23 05 01 DIVISION OF WORK 2
23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 4
23 05 19 METERS AND GAUGES FOR HVAC PIPING 3
23 05 23 GENERAL-DUTY VALVES FOR HVAC PIPING 6
CumberlandCountyAgriCenter-
1 TABLEOFCONTENTS
BoilerAddition

23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND 4
EQUIPMENT
23 05 33 HEAT TRACING FOR HVAC PIPING 5
23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC 4
23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 4
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC 8
23 07 16 HVAC EQUIPMENT INSULATION 4
23 07 19 HVAC PIPING INSULATION 7
23 09 13.13 BAS ACTUATORS AND OPERATORS 1
23 09 13.23 BAS SENSORS AND TRANSMITTERS 3
23 09 13.33 BAS CONTROL VALVES 2
23 09 34 VARIABLE-FREQUENCY MOTOR CONTROLLERS FOR HVAC 7
23 11 26 FACILITY LIQUEFIED-PETROLEUM GAS PIPING 4
23 21 13 HYDRONIC PIPING 10
23 21 23.01 HYDRONIC PUMP PACKAGE WITH AIR ELIMINATION 8
23 25 00 HVAC WATER TREATMENT 5
23 51 00 BREECHINGS, CHIMNEYS, AND STACKS 3
23 52 33.13 FINNED WATER-TUBE BOILERS 5
DIVISION 26 - ELECTRICAL
26 05 00.01 GENERAL ELECTRICAL REQUIREMENTS 6
26 05 19.01 BUILDING WIRE AND CABLE 3
26 05 26.01 GROUNDING AND BONDING 3
26 05 29.01 SUPPORTING DEVICES 2
26 05 33.14 CONDUIT 5
26 05 33.17 BOXES 3
26 05 53.01 ELECTRICAL IDENTIFICATION 4
26 28 16.17 ENCLOSED SWITCHES 2
CumberlandCountyAgriCenter-
2 TABLEOFCONTENTS
BoilerAddition

SECTION 00 11 13
ADVERSTIMENT FOR BIDS
INVITATION FOR PROPOSALS
FOR
CUMBERLAND COUNTY ENGINEERING & INFRASTRUCTURE DEPARTMENT
Cumberland County Agri Center - Boiler Addition, Fayetteville, North Carolina
Cumberland County
A pre-bid conference will be held at 1:30 PM on May 7, 2026, at 500 Executive Pl, Fayetteville,
NC 28305.
Pursuant to Section 143-131 of the General Statutes of North Carolina, informal bids are
solicited and will be received in the office of the Cumberland County Engineering &
Infrastructure Department, Room 214, in the Historic Courthouse located at 130 Gillespie Street,
Fayetteville, North Carolina at any time before 1:30 PM on 05-15-2026, and then publicly
opened in the office of the Cumberland County Engineering & Infrastructure Department in the
Historic Courthouse and read for construction of the proposed:
Proposals must be enclosed in a sealed envelope addressed to Ms. Amanda Lee, Engineering
and Infrastructure Director, 130 Gillespie Street, Room 214, Fayetteville, NC 28301. The outside
of the envelope must be marked "PROPOSAL FOR Cumberland County Agri Center - Boiler
Addition" and shall indicate the name, address, telephone number and state license number of
the bidder. Proposals must be submitted on the printed form, or exact copies thereof, contained
in the Contract Documents.
A bid bond is required for this project.
Minority bidders are strongly encouraged to participate.
Cumberland County MWBE goal is 15%.
Performance and Payment Bonds are required.
All Contractors are notified that North Carolina Statutory provisions as to licensing for
Contractors will be observed in receiving, reading and awarding of contracts.
Plans and specifications, including Contract Documents, are open to public inspection and
available upon request at the Cumberland County Engineering & Infrastructure Department
Office, 130 Gillespie Street, Fayetteville, NC.
The County reserves the right to reject any or all proposals. The bidder to whom the contract
may be awarded must comply with the requirements of G.S. Section 143-131, as amended.
No bids may be withdrawn after the scheduled closing time for the receipt of proposals for a
period of sixty (60) days.
CumberlandCountyAgriCenter-
001113-1 AdverstimentforBids
BoilerAddition

This page intentionally left blank

SECTION 00 42 00
PROPOSAL FORM
The undersigned hereby signifies that it is
(his or her) intention and purpose to enter
intoacontracttofurnishlabor,materials,equipment,apparatus,etc.,asrequiredandtodoallthe
work necessary for the:
Cumberland County Agri Center - Boiler Addition
as described in the specifications and shown on the plans in accordance with the terms of the
Advertisement, Instructions to Bidders, the foregoing Specifications, and the following form of
Contract, and this Proposal and the Plans; and pursuant with the requirements of the
Advertisement and Instructions to bidders which are as follows:
THAT:TheundersignedcarefullyexaminedtheInstructionstoBidders,theSpecifications,Plans,
this form of Proposal, and the Contract and Fully understands them.
THAT: The undersigned carefully examined the site or sites of the project or projects and is
familiarwiththeconditionsunderwhichthework,oranypartofit,istobedoneandtheconditions
whichmustbefulfilledinfurnishingand/orerectionorconstructionofanyorallitemsoftheproject,
and the furnishing only of any materials, equipment, or apparatus specified in connection
therewith.
THAT: The undersigned will provide all necessary tools, machinery apparatus, and all means
necessarytocompletesuchContractasmaybeenteredinto,andinthemannerprescribedinthe
Contract and Specifications and according to the Plans and requirements under the of the
Engineer, in the first class manner.
THAT: The right of Cumberland County and the recommendations of the Engineer are not to be
questioned in the award of the Contract.
THAT:ItistheintentionofCumberlandCounty,NorthCarolina,subjecttotheconditionssetforth,
to award contracts for the project on the basis of bids received at this letting and in such manner
as they may decide as being in the best interests of the County.
THAT: The County reserves the right to reject any of all proposals.
THAT: A proposal made by a corporation must be signed by its proper officers in a legal manner
and its official address stated herein.
THAT:Aproposalmadebyafirmshallbesignedwiththenameofeachmemberofsaidfirmand
the firm name added, with the official address of said firm.
THAT:Theundersignedwillcompletesuchcontractasisherebyproposedtoenterintowithinthe
time stated in the notice to proceed and stipulated in the Contract.
THAT: The Bidder acknowledges receipt of the following Addendum (write in addendum #'s):
____________________________________________________________________________
THAT:TheContractoragreestofurnishallmaterials,laborandequipmentandtoinstallcomplete
in place the work in accordance with the Plans and Specifications for the lump sum of:
CumberlandCountyAgriCenter-
004200-1 ProposalForm
BoilerAddition

BASE BID:
_______________________________________________________Dollars ($____________).
Total Bid ($____________).
Submitted, this _________day of __________________, 2024.
_____________________________________
CONTRACTOR
By: ________________________________________
(Signature of Person, Firm or Corporation making Bid)
Title: ____________________________________________
Address: _________________________________________
_________________________________________
Attest: _________________________
License No. ______________________________________
Phone: __________________________________________
CumberlandCountyAgriCenter-
004200-2 ProposalForm
BoilerAddition

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Solicitation Number: 1012-26-075 Construction Manager at Risk (CMAR) Services Project Title...: Construction Manager ...

State Government of North Carolina

Bid Due: 8/12/2026

...Construction Improvements Advertisement 298-FY27-CAM-BID-MUNIAPDREHAB Request for Bids 298-FY27-CAM-BID...

City of Asheville

Bid Due: 9/08/2026

...Solicitation Number: 298-FY27-CAM-BID-MUNIAPDREHAB Project Title: MUNI 4th Floor Construction... Improvements Description: Request for ...

State Government of North Carolina

Bid Due: 9/08/2026

...Project: FY27 ADA Corridors Phase 1 Unspecified Construction Ref. #: 269-2027-001 Department: City...

City of Charlotte

Bid Due: 8/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.