Hospital Water Management and Water Treatment Services

Location: Texas
Posted: Oct 9, 2026
Due: Nov 13, 2026
Agency: JPS Health Network
Type of Government: State & Local
Category:
  • H - Quality Control, Testing, and Inspection Services
Publication URL: To access bid details, please log in.
Hospital Water Management and Water Treatment Services
Bid or RFP#
20261405380

Closing Date & Time
November 13, 2026 - 2:00 pm

Pre-Proposal

A Pre-Proposal Conference, including a site visit of Main Campus water systems, will be conducted on 10-13-26 at 11 am CST. Please meet at the contractors check in on the north side of campus (approximate address is 201 Feliks Gwordz Place across from Medical Examiner and cemetery). Attendance is not mandatory but is strongly encouraged.

Description

The District is seeking qualified vendors to provide Hospital Water Management, Water Treatment, and Sterile Processing Water Quality Management Program.

Attachment Preview

TARRANT COUNTY

HOSPITAL DISTRICT d/b/a

JPS HEALTH NETWORK

REQUEST FOR PROPOSAL #20261405380 Hospital Water Management and Water Treatment Services

The Tarrant County Hospital District d/b/a JPS Health Network (the "District") is seeking proposals for the provision of Hospital Water Management and Water Treatment Services.

The District will reject any proposal that fails to comply in all respects with the instructions set forth herein for responding to this Solicitation. NO EXCEPTIONS WILL BE MADE, even if you are a current or prior vendor for the District. The contract awarded, if any, under and pursuant to this Solicitation shall supersede any previous contract, bid, or GPO agreement for the products or services described herein.

Release Date: 10-09-2026

Response Deadline: 11-13-2026, 2:00 p.m. CST

OVERVIEW

INTRODUCTION AND OVERVIEW

The District desires to award a contract or contracts based upon vendor proposals ("Solicitation Response(s)") to this Solicitation ("Solicitation"). The District is soliciting vendor proposals from vendors capable of supplying the District with Hospital Water Management, Water Treatment, and Sterile Processing Water Quality Management Program, solicited in two lots (Lot 1 and Lot 2) as described in Section II (the "Service(s)"), as set forth and specified herein (See Section II below, BUSINESS REQUIREMENTS, attached hereto and incorporated herein for all purposes). All Solicitation Responses must be delivered to the District by the date and time, and in the manner specified in Section I.B hereof to be considered a Solicitation Response by the District.

A Solicitation Response does not commit the District to accept such Solicitation Response or to award a contract based on any Solicitation Response ("Contract Award") merely because a Solicitation Response may propose the lowest price for the Services. The District expressly reserves the right to base any Contract Award hereunder upon its evaluation of all relevant factors regarding the vendor, including, but not limited to, Service pricing and terms, management experience and expertise, industry reputation and profile, performance history, support services, location and accessibility, and any other information relevant to its evaluation. Qualifications and omissions will be considered when evaluating vendor solicitation responses. A Solicitation Response that does not meet the minimum requirements set forth in Section II below, BUSINESS REQUIREMENTS, will be disqualified.

This Solicitation is not an order and does not commit the District to pay for any costs incurred by the prospective vendor in the preparation or submission of the Solicitation or in the procurement of the Service. Service quantity estimates used herein may or may not reflect actual quantities needed or used by the District in the future, and do not commit the District to order specific Service quantities. Any Solicitation Response accompanied by terms and conditions that conflict with this Solicitation may be rejected by the District.

The District reserves the right to reject any or all Solicitation Responses and to issue a Contract Award or not to issue a Contract Award based solely on the Solicitation Responses received by the District in response to this Solicitation. However, prior to making any award hereunder, the District also reserves the right to engage in additional discussions with one or more of the vendors responding to this Solicitation.

Any prospective Respondent may request an explanation or interpretation of any portion of this Solicitation by complying with the request procedure described in Section I.C.2 below. The responses, if any, of the District to such requests are subject to and will be in the form of amendment to the Solicitation and will comply with the provisions of Section I.C.2 below. The District may elect not to respond to any or all such requests received from prospective Respondents.

SMALL OR HISTORICALLY UNDERUTILIZED BUSINESS PARTICIPATION

The District maintains a policy of encouraging and engaging in business transactions with vendors who are small or historically underutilized businesses. The District establishes a 25% good faith target goal. The District also encourages its vendors to utilize subcontractors and vendors who qualify and are certified under applicable law as HUBs. HUB Respondents are also strongly encouraged to subcontract to other HUBs to expand HUB participation beyond Respondent's own self-performance. HUB Respondents should identify and list HUB subcontractors and other relevant information under the appropriate Solicitation Response section(s) and on the Good Faith Form (). Prior to the Contract Award, a Respondent's good faith efforts to utilize HUB subcontractors and vendors in its business transactions shall be part of the criteria under which the vendor proposals will be considered. Each Respondent will be required to show in its Solicitation Response its efforts to utilize HUB subcontractors and vendors in its business transactions.

VENDOR PORTAL

Prior to the District's consideration of a Respondent's Solicitation Response each Respondent is required to register as a vendor in the District's online vendor portal, B2Gnow, located on the District's Website at: .

The District will monitor contract compliance via B2GNow. The prime vendor and any subcontractors awarded contracts as a result of this Solicitation are required to use the secure web-based system to submit project information including, but not limited to, monthly progress payment reports and other information related to HUB participation. The District may require additional information related to the contract to be provided electronically through the system at any time before, during, or after contract award. Noncompliance may result in exclusion of a vendor from future contract opportunities with the District.

COMPLIANCE WITH TEXAS GOVERNMENT CODE SECTION 2252.908

Please note that Texas Government Code Section 2252.908 does not require any action until after a vendor has been awarded and a contract is ready for the District's Board of Managers approval. Form 1295s require the District's contract tracking number, which does not exist until after a vendor has been awarded.

Texas Government Code Section 2252.908 ("Section 2252.908") states that a governmental entity or state agency may not enter into certain contracts with a business entity unless the business entity submits Form 1295, a disclosure of interested parties, to the governmental entity or state agency at the time the business entity submits the signed contract to the governmental entity or state agency. Section 2252.908 applies to all contracts entered into from and after January 1, 2016 between business entities and Texas governmental entities and state agencies which meet either one of the following criteria:

1. the contract requires a vote of the governing body of the Texas governmental entity, or

2. the contract has a contractual value of at least $1 Million.

The Texas Ethics Commission has adopted a Certificate of Interested Parties form ("Form 1295") and has made it available on the TEC website.

In 2017 Section 2252.908 was amended to provide that the requirements of Section 2252.908 do not apply to the following contracts entered into or amended after January 1, 2018:

1. a contract with a publicly traded business entity, including a wholly owned subsidiary of the business entity;

2. a contract with an electric utility, as that term is defined by Section 31.002, Texas Utilities Code; or

3. a contract with a gas utility, as that term is defined by Section 121.001, Texas Utilities Code.

In the event a Contract Award is issued pursuant to this Solicitation, the Respondent receiving the Contract Award shall be required to comply with the provisions of Section 2252.908, Texas Government Code, and the Chapter 46 Rules of the TEC, prior to entry into a contract with the District. The TEC has posted a video tutorial to its website for business entity filings of Form 1295. The TEC video provides step-by-step tutorials for creating login accounts for the business entity for completing and filing Form 1295. The TEC video tutorials can be viewed on its website at:

The TEC's FAQs are posted on its website at:

COMPLIANCE WITH TEXAS GOVERNMENT CODE CH. 2271 (Boycott of Israel Prohibited)

In 2017 Texas Government Code Section et seq. was enacted to provide that a Texas governmental entity is prohibited from entering into a contract with a company unless the contract contains a written verification by the company that (i) the company does not boycott Israel, and (ii) the company will not boycott Israel during the term of the contract. The requirement was modified in 2019 to apply only to contracts with a value of $100,000 or more that are made with a company (not including sole proprietorships) with 10 or more full-time employees. The term "boycott Israel" is defined in Section of the Texas Government Code and means refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict harm on, or limit commercial relationships specifically with Israel, or with a person or entity doing business in Israel or in an Israel-controlled territory, but does not include an action made for ordinary business purposes. Any awarded contract must comply with the verification requirements in Texas Government Code Section , and a Respondent's failure or refusal to comply will result in the withdrawal of the Contract Award. Respondents should ensure they and their affiliates do not appear on the Texas Comptroller's .

COMPLIANCE WITH TEXAS GOVERNMENT CODE SECTIONS 2252.151 et seq. (Scrutinized Business Operations in Sudan, Iran, or with Designated Foreign Terrorist Organizations Prohibited)

In 2017 Texas Government Code Chapter 2252 was amended by adding Sections et seq. to provide that a Texas governmental entity is prohibited from entering into a contract with a company that engages in certain scrutinized business operations in Sudan, Iran, or with foreign terrorist organizations. A Texas government entity may not enter into a contract with a "scrutinized company" as defined in Section of the Texas Government Code. Respondents should ensure that they and their affiliates do not appear on the Texas Comptroller's . The District is from entering into a contract with a company on such a list (including a company with any affiliate on the list).

COMPLIANCE WITH TEXAS GOVERNMENT CODE CH. 2274 (Discrimination Against Firearm Entities or Firearm Trade Associations Prohibited)

In 2021, Texas Government Code Chapter was enacted to provide that a Texas governmental entity is prohibited from entering into a contract with a company unless the contract contains a written verification by the company that (i) the company does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association, and (ii) the company will not discriminate against a firearm entity or firearm trade association during the term of the contract. The requirement applies only to contracts with a value of $100,000 or more that are made with a company (not including sole proprietorships) with 10 or more full-time employees. The requirement does not apply to sole source contracts or competitive solicitations-related contracts where no respondent can provide the verification required. (See Sec. ). The term "discriminate against a firearm entity or firearm trade association" is defined in Texas Government Code Section and means, with respect to the entity or association, to: (i) refuse to engage in the trade of any goods or services with the entity or association based solely on its status as a firearm entity or firearm trade association; (ii) refrain from continuing an existing business relationship with the entity or association based solely on its status as a firearm entity or firearm trade association; or (iii) terminate an existing business relationship with the entity or association based solely on its status as a firearm entity or firearm trade association; the term does not include: (i) the established policies of a merchant, retail seller, or platform that restrict or prohibit the listing or selling of ammunition, firearms, or firearm accessories; and (ii) a company's refusal to engage in the trade of any goods or services, decision to refrain from continuing an existing business relationship, or decision to terminate an existing business relationship: (aa) to comply with federal, state, or local law, policy, or regulations or a directive by a regulatory agency; or (bb) for any traditional business reason that is specific to the customer or potential customer and not based solely on an entity's or association's status as a firearm entity or firearm trade association. Any awarded contract must comply with the verification requirements in Texas Government Code Section , and a Respondent's failure or refusal to comply will result in the withdrawal of the Contract Award.

COMPLIANCE WITH TEXAS GOVERNMENT CODE CH. 2276 (Boycott of Certain Energy Companies Prohibited)

In 2021, Texas Government Code Chapter was enacted to provide that a Texas governmental entity is prohibited from entering into a contract with a company unless the contract contains a written verification by the company that (i) the company does not boycott energy companies, and (ii) the company will not boycott energy companies during the term of the contract. The requirement applies only to contracts with a value of $100,000 or more that are made with a company (not including sole proprietorships) with 10 or more full-time employees. The term "boycott energy company" is defined in Section of the Texas Government Code and means, without an ordinary business purpose, refusing to deal with, terminating business activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations with a company because the company: (A) engages in the exploration, production, utilization, transportation, sale, or manufacturing of fossil fuel-based energy and does not commit or pledge to meet environmental standards beyond applicable federal and state law; or (B) does business with a company described by subsection (A). Any awarded contract must comply with the verification requirements in Texas Government Code Section , and a Respondent's failure or refusal to comply will result in the withdrawal of the Contract Award.

TEXAS PUBLIC INFORMATION ACT

Each Respondent acknowledges that the District is a governmental body operating under and subject to the provisions of the Texas Public Information Act ("TPIA") (Chapter 552 of the Texas Government Code) and thereby acknowledges that certain information collected, assembled, or maintained in connection with the transaction of official business by a governmental body is considered public information potentially subject to disclosure pursuant to a valid TPIA request. Respondent is responsible for challenging any requests for information it considers confidential under the TPIA. The requirements of Subchapter J, Chapter 552 of the Texas Government Code apply to this bid, and the contractor or vendor agrees that that the contract can be terminated if the contractor or vendor knowingly or intentionally fails to comply with a requirement of that subchapter. Respondents should consult the Attorney General's website () for information concerning the application of the provisions of the TPIA to proposals and proprietary vendor information.

SOLICITATION RESPONSE REQUIREMENTS, CONDITIONS AND RELATED INFORMATION

Preparation of Solicitation Response.

Each Respondent should carefully examine and familiarize itself with this Solicitation and all exhibits, drawings, specifications, and instructions included in this Solicitation. Each Respondent, by submitting a Solicitation Proposal, represents that Respondent has read and understands this Solicitation and the drawings, exhibits attached to this Solicitation.

Each Solicitation Response shall be fully completed, shall contain all the information required from the Respondent by this Solicitation, including the Vendor Certification Form attached hereto as ("Required Information"), and shall be signed and executed, on the Signature Form attached hereto as by an officer or other authorized representative of the Respondent. Each page of a Solicitation Response shall contain the company name of the Respondent. A Respondent's failure to provide any of the Required Information in its Solicitation Response, or the failure of the Solicitation Response to contain the signature of Respondent's officer or other duly authorized representative, may result in the District's disqualification of such Solicitation Response. The Required Information shall include detailed information regarding the Respondent's historical efforts (for the last year) to utilize HUB subcontractors and vendors in its prior business transactions and shall include such detailed information in its Solicitation Response.

Each Respondent shall be responsible for and shall bear all costs for the preparation and presentation of its Solicitation Response. Unless otherwise designated by Respondent and agreed by the District, the Solicitation Response and all drawings, materials, supporting documentation, manuals, etc. submitted with any Solicitation Response ("Submitted Materials") will, immediately upon submission, become the property of the District. After the date upon which the final vendor is selected (See Section I.C.1 below) Respondents may request the return of the Submitted Materials. However, all costs associated with returning the Submitted Materials to a Respondent shall be born and paid in advance by the Respondent.

The District does not guarantee the confidentiality of any Submitted Materials. Each Respondent, by submitting a Solicitation Response, acknowledges and agrees that any Submitted Materials will be distributed or made available to appropriate District personnel and consultants involved in this Solicitation process, and further understands that the Submitted Materials may be subject to disclosure pursuant to the TPIA. Information considered proprietary by a Respondent should be clearly marked "Proprietary" when submitted with a Solicitation Response.

The District reserves the right to modify and/or supplement this Solicitation by amendment issued by the District prior to the date and time of the Response Deadline (defined herein). Any such amendments will be posted online prior to the Response Deadline at the same District internet site where this Solicitation is kept available for solicitation of Solicitation Responses. It is the responsibility of each Respondent to check that internet site frequently to determine if any amendments have been issued.

The District reserves the right to withdraw this Solicitation, at its sole discretion, from any or all prospective vendors and Respondents at any time, before or after the Response Deadline. The withdrawal, if ever, of this Solicitation shall be effective upon the District's issuance of written notice posted online at the same District internet site where this Solicitation is kept available for solicitation of Solicitation Responses, which notice may also be sent by the District to the prospective Respondents in any manner deemed reasonable by the District.

Form of Contract.

Any Respondent awarded a contract with the District for the purchase and sale of the products and/or services pursuant to this Solicitation shall be required to execute an agreement between the Respondent and the District which shall in all material respects contain the terms and conditions set forth in (Contract Terms), which is attached hereto and incorporated herein for all purposes. The District will not agree to change the Contract Terms except under unusual circumstances approved in the sole discretion of the District and its legal counsel. The District will entertain changes to the Contract Terms to the limited extent required to conform the unique terms of the Solicitation Response to the Contract Terms (e.g., unique payment provisions, terms and conditions). The District reserves the right to approve or reject any proposed changes to the Contract Terms submitted by Respondents.

Respondents may not request additional changes to the Contract Terms after the Solicitation Response has been submitted to the District, nor will the District agree to negotiate any requested changes to the Contract Terms which are not included with the Solicitation Response in the manner and form set forth above in this section I.B.2 and in Exhibit C.

Submission of Solicitation Responses.

All Solicitation Responses shall be submitted to the District as follows:

All Solicitation Responses must be electronically submitted via file upload at this website: . Please ensure this RFP# is entered in the "Bidding Opportunity Num" field on the Response Form, as well as in the file name(s) of each uploaded file. The proposal (except for any redline of the Contract Terms and the completed Exhibit A Price Sheet Workbook, which shall be submitted in its original .xlsx format) must be submitted in a format that preserves graphic appearance, such as portable document format (PDF) or other digital image format that is platform-independent and easily readable without purchased software. If you submit a redline in response to Exhibit C, you must provide an editable, unlocked/unsecured version of the redline with your Solicitation Response (preferably in track changes).

An attempted award will be deemed invalid if the Respondent, upon award of a contract (if ever), is not registered with JPS Vendor Portal () or is not in compliance with the District's requirements for vendor credentialing.

Respondents must submit the Solicitation Response as follows: the file name(s) of each file making up the Solicitation Response must begin with (i) the RFP# followed by (ii) the Respondent's name. Also, the cover page of the Solicitation Response must state the following: (i) the name and address of the Respondent, (ii) the Response Deadline, and (iii) the RFP#. Please put the RFP# in the "Bidding Opportunity Num" field on the Response Form.

Unless otherwise expressly provided in this Solicitation or in any amendment to this Solicitation, no Respondent shall modify or cancel the Solicitation Response or any part thereof for thirty (30) days after the Response Deadline. Respondents may withdraw Solicitation Proposals at any time before the Solicitation Proposals are opened by the District, but may not resubmit them. No Solicitation Proposal may be withdrawn or modified after the Solicitation Proposal deadline.

Solicitation Proposals will not be considered if they show any omissions, alterations of required forms, additions or conditions not requested or irregularities of any kind. However, the District reserves the right to waive any irregularities and to make the award in the best interest of the District.

The Respondent acknowledges the right of the District to reject any or all Solicitation Responses and to waive any informality or irregularity in any Solicitation Response received. In addition, the District reserves the right to reject any Solicitation Response if the Respondent failed to submit the data, information or documents required by this Solicitation, or if the Solicitation Proposal is in any way incomplete or irregular.

Failure to follow the instructions regarding the submission of Solicitation Responses may result in the District's disqualification of such Solicitation Responses.

Solicitation Responses are due on or before 11-13-2026, 2:00 p.m. CST ("Response Deadline"). The Response Deadline may be extended by the District upon amendment to this Solicitation issued prior to the then-existing Response Deadline. Solicitation Responses are not scheduled for public opening. No email, telephone, telephonic, or FAX Solicitation Responses will be accepted. The District will not be responsible for missing, lost, or late deliveries. Solicitation Proposals delivered after the Response Deadline will not be accepted or considered under any circumstances.

Each Solicitation Response shall contain the completed form entitled, "Vendor Certification Form" set forth on which is attached hereto and incorporated herein for all purposes.

SOLICITATION SCHEDULE AND RELATED INFORMATION

Estimated Schedule

Pre-Proposal Conference. A Pre-Proposal Conference, including a site visit of Main Campus water systems, will be conducted on 10-13-26 at 11 am CST. Please meet at the contractors check in on the north side of campus (approximate address is 201 Feliks Gwordz Place across from Medical Examiner and cemetery). Attendance is not mandatory but is strongly encouraged.

Milestone Dates. Milestone Dates are estimated for planning purposes only and are subject to change.

District Solicitation Contact

Respondents may, in the manner prescribed herein, present requests ("Submission Questions") for an explanation, clarification or interpretation of the BUSINESS REQUIREMENTS in this Solicitation and/or other requirements for submission of Solicitation Responses to the Solicitation Contact identified below during the proposal submission period. All Submission Questions must be submitted in a Questions Submission Form (attached to the Bidding Opportunity). All Submission Questions must be electronically submitted via file upload at this website: , and must reference the appropriate pages and sections number of this Solicitation that are the subject of such Submission Questions. The file name of the Questions Submission Form must begin with (i) the RFP# followed by (ii) the Respondent's name. The final date and time to submit Submission Questions is 10-21-2026, 2:00 p.m. Central Time. NO PHONE CALLS PLEASE. Confirmation of the delivery of Submission Questions to the District is the sole responsibility of the Respondent. The District may, in its sole discretion, elect not to answer or respond to any or all Submission Questions it receives, and the failure of refusal of the District to answer or respond to any Submission Question will not affect, in any way, this Solicitation. Submission Questions may be informally addressed during the Pre-Proposal Conference; provided, however, that no answer or response to any Submission Question by any representative of the District shall be effective unless and until it is issued by the District in writing in the form of one or more addenda to the Solicitation, and has been posted to the District's Solicitation website link prior to the Response Deadline. It is the responsibility of each Respondent to check the website for all addenda to the Solicitation up to the Response Deadline. Prospective vendors are advised that no District employee other than the Solicitation Contact is empowered to make binding statements regarding this Solicitation, and no statements, clarifications, or corrections regarding this Solicitation are valid or binding on the District except those issued in writing by the Solicitation Contact as addenda to the Solicitation.

Contact between Respondents and the District, other than in the manner described and set forth in this Section I.C.2, during the Solicitation Response submission period or evaluation period is prohibited. Any attempt by a Respondent to engage in prohibited contact with the District or the Solicitation Contact may result in disqualification of its Solicitation Response.

The Solicitation Contact is:

Tyler Bowers, Sourcing & Contracts Specialist

Supply Chain Department

JPS Health Network

JPS Purchasing Office

1500 S. Main Street

Fort Worth, TX 76104

Email:

District's Solicitation website link:

Solicitation Response submission website link:

BUSINESS REQUIREMENTS

INTRODUCTION

The District is requesting proposals from qualified Respondents to provide Hospital Water Management, Water Treatment, and Sterile Processing Water Quality Management services in two lots: Lot 1, Water Management Program Assessment, Revision, and Validation, including a Sterile Processing Department (SPD) Water Quality Management Plan; and Lot 2, Chemical Water Treatment Program. Respondents may submit a proposal for Lot 1, Lot 2, or both. The District will evaluate each lot separately and may award both lots to the same Respondent or to different Respondents.

BACKGROUND

The Tarrant County Hospital District, known as ("District"), is a tax-supported organization serving the healthcare needs of families across Tarrant County. JPS provides adult inpatient care at John Peter Smith Hospital, a facility licensed for 582 beds and located in Fort Worth, Texas. JPS has served as a Level I Trauma Center for Tarrant County for over a decade and is currently the largest training institution in Fort Worth.

The health network offers comprehensive services including primary care, specialty care, and pharmacy at more than 25 community locations. JPS is dedicated to providing a full continuum of behavioral health services, including inpatient services at Trinity Springs Pavilion, emergency behavioral health services at our Psychiatric Emergency Center, outpatient services at our JPS clinics, and mental health services for children and adolescents through programs like .

JPS is governed by an eleven (11) member Board of Managers, whose members are appointed by the Tarrant County Commissioners Court.

PROJECT SCOPE

Hospital Water Management, Water Treatment, and Sterile Processing Water Quality Management Program

General Provisions Applicable to Both Lots

Lot Structure and Definitions. This Section II.C describes two lots. Lot 1, Sections 1 through 12, covers assessment, validation, and revision of the District's existing Water Management Program and development of a Sterile Processing Department Water Quality Management Plan. Lot 2, Sections 1 through 36, covers the District's chemical water treatment program. In the Lot 1 scope, "the selected vendor," "the vendor," and "Contractor" mean the Respondent awarded Lot 1. In the Lot 2 scope, "the Contractor" means the Respondent awarded Lot 2. In both scopes, "the hospital," "the Hospital," and "the facility" mean the District and the District locations listed under "Locations" at the end of this Section II.C, as applicable to each lot. In both scopes, "cooling tower" means a cooling-tower water system; towers or cells that share a common basin count as one system.

Existing Water Management Program. The District maintains an existing Water Management Program and written Water Management Plan. Lot 1 is an assessment, validation, and revision of that program. Upon contract execution, the District will provide the Lot 1 Contractor its current Water Management Plan, available water system drawings, and available testing records. The current Water Management Plan covers the Main Campus, including the Patient Care Pavilion, Trinity Springs Pavilion, the Central Plant, and the buildings at 1350 and 1400 S. Main Street, and includes seven (7) domestic cold-water systems, eight (8) domestic hot-water systems, three (3) cooling-tower water systems, thirty-eight (38) potable-water sampling points, and four (4) ice-machine sampling points.

Coordination Between Lots. The Lot 1 Contractor performs independent program validation, including Legionella validation sampling. The Lot 2 Contractor performs routine treatment, control, and monitoring of the treated systems. Each Contractor shall share its sampling results, control limits, and corrective-action records with the other Contractor and with the District Water Management Team, and shall attend Water Management Team meetings when requested. If the same Respondent is awarded both lots, Lot 1 validation sampling shall be performed by personnel and a laboratory independent of the personnel performing Lot 2 treatment.

Infection Control Risk Assessment (ICRA). Before performing any work that opens, drains, flushes, disinfects, or modifies a water system, or that occurs in or adjacent to a patient-care area, Contractor shall obtain an ICRA permit through the District's existing ICRA permit process and shall comply with all conditions of that permit, including any stop-work direction from District Infection Prevention.

Site Coordination and Utility Interruptions. Contractor shall submit a written request to District Facilities/Engineering at least five (5) business days before any planned activity that will interrupt, drain, or shut down a water, steam, or HVAC system, and shall not proceed without written approval from the District Facilities/Engineering Plant Supervisor (or designee). Where an activity affects fire protection, emergency power, medical gas, or other life-safety systems, Contractor shall coordinate Interim Life Safety Measures (ILSM) with District Facilities/Engineering before work begins. Contractor's personnel shall check in with the District Facilities/Engineering Plant Supervisor (or designee) on arrival at each District location.

Key Personnel. Respondent shall identify in its proposal, for each lot proposed, an Account Manager and the lead technical personnel who will perform the work. Key personnel named in Contractor's proposal shall remain assigned to the District for at least the first twelve (12) months of the Initial Term, except on separation from Contractor's employment. Contractor shall give the District at least ten (10) business days' written notice before substituting any key personnel, and substitutes shall have equal or greater qualifications and are subject to District approval, which the District will not unreasonably withhold. The District may require Contractor to replace any individual assigned to the District.

Subcontracting. Contractor may use subcontractors, including HUB subcontractors, only as identified in its proposal or as approved in advance in writing by the District. Contractor remains responsible for all work performed by its subcontractors.

Subcontractor Insurance. Contractor shall require each subcontractor performing work at a District location to maintain the insurance coverage and limits required by Exhibit C.

Data Ownership and Remote Monitoring. All data, test results, reports, system maps, and records generated under either lot are District property. Contractor shall provide the District continuous read access to any web-based monitoring or reporting platform used for District systems and, on request and at contract expiration or termination, shall export all District data in a non-proprietary electronic format (e.g., .csv or .xlsx) at no additional cost. Contractor shall not connect any device or software to the District network without prior written approval from the District following its security review.

Standards Editions. Where this Section II cites a standard by edition, Contractor shall apply that edition or any later edition that takes effect during the term, and shall notify the District in writing within thirty (30) days after becoming aware of a change in an applicable standard or regulation that affects the program.

Changes to the Plans and Applicable Requirements. Both lots shall be performed in accordance with the Water Management Plan and the SPD Water Quality Management Plan in effect, as revised from time to time by the District's Water Management Team. Each Contractor shall implement a written plan revision within thirty (30) days after the District provides it, or sooner if the revision so states. Each Contractor shall monitor changes in laws, regulations, accreditation standards, and consensus standards applicable to its services and shall notify the District in writing within thirty (30) days after any such change, with an assessment of its effect on the District's program and a recommended plan revision.

A change that can be performed within the service visits, testing, and other services already priced in Exhibit A shall be performed at no additional cost. A change that adds systems, service visits, samples, tests, cleanings, or other services shall be priced at the Exhibit A rates, or under Section II.G (System Schedule and Systems Added During the Term), and documented by written amendment. Where Exhibit A provides no applicable rate or pricing method, the Contractor shall submit a written change proposal, and no added work shall begin until a written amendment is executed. The Contractor shall assert in writing any claim that a District change affects its price within thirty (30) days after the District gives written notice of the change. The Lot 1 annual program review is included in the Lot 1 recurring fee. A plan review and update required between annual reviews by a change described in The Joint Commission standard EC.02.05.02 (including a change to a water system that adds risk, new equipment or a new at-risk water system, or a new building or wing) shall be billed at the Exhibit A per-building rate where a building is added to the plan, and otherwise at the Exhibit A hourly consulting rate.

Lot 1: Water Management Program Assessment, Revision, and Validation; SPD Water Quality Management Plan

1. Purpose

Lot 1 seeks a qualified firm to assess, validate, and revise the District's existing Hospital Water Management Plan, evaluate the District's facility water treatment processes, develop a Sterile Processing Department (SPD) Water Quality Management Plan, and provide ongoing program validation and support for the term of the contract.

The selected vendor shall provide the expertise, assessment, documentation, testing, risk evaluation, program development, staff education, and ongoing support necessary to ensure that the hospital's water systems are managed in a manner that supports:

Patient safety and quality of care.

Infection prevention and control.

Medical-device reprocessing and sterilization.

Regulatory and accreditation requirements.

Water system reliability and operational continuity.

Appropriate water quality for clinical, procedural, and support functions.

Prevention and mitigation of waterborne pathogens and other water-related hazards.

Appropriate operation and monitoring of water treatment systems.

Continuous improvement and survey readiness.

The program shall address the hospital's potable water system, utility water systems, water treatment equipment, clinical water uses, and water used for cleaning, disinfection, and processing of medical devices.

2. Project Objectives

The selected vendor shall assess and revise the District's integrated water management program so that it is designed to:

Identify and evaluate all significant water systems and water uses throughout the facility.

Identify potential biological, chemical, physical, and operational hazards associated with the hospital's water systems.

Revise the District's existing facility-specific Water Management Plan based on a comprehensive risk assessment.

Develop a specific water quality management program for Sterile Processing.

Identify water quality requirements for each medical-device reprocessing application.

Evaluate existing water treatment equipment and determine whether treatment processes are appropriate for intended uses.

Establish water quality specifications, monitoring requirements, sampling locations, testing frequencies, and acceptable limits.

Establish procedures for responding to water quality failures and other water-related events.

Establish documentation and recordkeeping requirements.

Provide staff education and competency support.

Establish an ongoing auditing and performance-monitoring process.

Maintain readiness for applicable regulatory and accreditation surveys.

3. Applicable Standards, Regulations, and Guidelines

The vendor shall develop the program using the most current applicable requirements and recognized industry standards, including, as applicable:

Centers for Medicare & Medicaid Services (CMS), including the Conditions of Participation and CMS memorandum QSO-17-30-Hospitals/CAHs/NHs (as revised July 2018).

The Joint Commission (TJC), including Standard PE.04.01.05 (effective January 1, 2026).

Centers for Disease Control and Prevention (CDC), including the CDC toolkit, Developing a Water Management Program to Reduce Legionella Growth and Spread in Buildings.

Environmental Protection Agency (EPA).

Occupational Safety and Health Administration (OSHA), where applicable.

Association for the Advancement of Medical Instrumentation (AAMI), including ANSI/AAMI ST108:2023, Water for the processing of medical devices, and ANSI/AAMI ST79, Comprehensive guide to steam sterilization and sterility assurance in health care facilities.

Association for Professionals in Infection Control and Epidemiology (APIC).

Facility Guidelines Institute (FGI), where applicable.

American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), including ANSI/ASHRAE Standard 188-2021, Legionellosis: Risk Management for Building Water Systems, and ASHRAE Guideline 12.

Applicable state and local health department requirements.

Applicable plumbing and building codes.

Applicable manufacturer Instructions for Use (IFU).

Current standards applicable to medical-device reprocessing and sterile processing.

The vendor shall identify the specific standards and requirements used in developing the program and shall notify the Hospital of significant changes to applicable requirements that may affect the program.

4. Facility Water System Assessment

The selected vendor shall conduct a comprehensive assessment of the hospital's water infrastructure and water use.

The assessment shall include, at minimum:

The assessment shall cover (a) in full, the Main Hospital (1500 S. Main St.), the Patient Care Pavilion (1575 S. Main St.), Trinity Springs Pavilion (1600 May St.), the Psychiatric Emergency Center (1652 May St.), and the Central Plant (1501 S. Jennings Ave.); and (b) each other location listed under "Locations," through a documented screening against ANSI/ASHRAE Standard 188-2021 criteria that determines whether the location requires a location-specific plan or is covered by the facility-wide plan.

4.1 Water Sources

Municipal water supply.

Well water, if applicable.

Emergency or alternate water supplies.

Storage tanks.

Water treatment systems.

Other sources of water entering or being used within the facility.

4.2 Distribution System

Evaluate, as applicable:

Incoming water service.

Main water distribution piping.

Hot-water systems.

Cold-water systems.

Recirculation systems.

Water storage tanks.

Pumps.

Mixing valves.

Dead legs and low-use areas.

Areas of low flow or stagnation.

Cross-connections and backflow prevention.

Points of use.

Construction-related modifications.

Areas susceptible to temperature or flow concerns.

4.3 Clinical and Patient-Care Areas

Evaluate water use in:

Patient rooms.

Intensive care units.

Emergency Department.

Operating rooms.

Procedural areas.

Endoscopy.

Dialysis (building water serving the unit only; dialysis water treatment systems are managed by the District's dialysis service and are excluded).

Oncology areas.

Neonatal/pediatric areas.

Labor and delivery.

Dental services.

Laboratories.

Pharmacy.

Dietary/food service.

Environmental Services.

Respiratory Therapy.

Sterile Processing.

Other departments with specialized water requirements.

5. Hospital Water Management Plan

The selected vendor shall revise and update the District's existing written, facility-specific Water Management Plan.

The revised plan shall include:

5.1 Water Management Team

Recommend updates to the District's Water Management Team charter, including:

Team membership.

Roles and responsibilities.

Authority and accountability.

Meeting frequency.

Reporting structure.

Escalation procedures.

The recommended team shall include appropriate representation from:

Facilities/Engineering.

Infection Prevention.

Sterile Processing.

Clinical Operations.

Environmental Services.

Quality/Risk Management.

Safety.

Laboratory, as appropriate.

Supply Chain/Materials Management, as appropriate.

Other departments identified through the risk assessment.

5.2 System Mapping

The vendor shall create or validate a comprehensive water system map identifying:

Water entry points.

Treatment systems.

Storage systems.

Distribution systems.

Hot and cold-water loops.

Recirculation systems.

Major branches.

High-risk locations.

Critical water-use points.

Medical-device processing water systems.

5.3 Risk Assessment

Conduct a documented water-system risk assessment addressing:

Waterborne pathogens.

Legionella risk associated with cooling towers, evaporative condensers, domestic hot- and cold-water systems, and other aerosol-generating devices (e.g., showers, ice machines, decorative water features, eyewash stations, and humidifiers).

Conditions that may promote Legionella growth and amplification, including inadequate disinfectant residual, elevated temperatures, stagnation, sediment, scale, corrosion, and biofilm.

Microbiological contamination.

Chemical contamination.

Physical contamination.

Water stagnation.

Temperature concerns.

Loss of disinfection residual.

Biofilm development.

Cross-connections.

Backflow.

Equipment failure.

Loss of water pressure.

Water outages.

Construction activities.

System modifications.

Changes in water usage.

Emergency conditions.

The assessment shall identify high-risk systems, high-risk patient populations, and high-risk water uses.

6. Water Treatment Program

The selected vendor shall evaluate and provide recommendations regarding the facility's water treatment processes.

This shall include, as applicable:

Filtration.

Sediment filtration.

Carbon filtration.

Water softening.

Reverse osmosis.

Deionization.

Ultraviolet treatment.

Chemical treatment.

Disinfection systems.

Point-of-use treatment.

Central treatment systems.

Storage and distribution systems.

For each treatment system, the vendor shall evaluate:

Intended purpose.

Capacity.

Design.

Current condition.

Maintenance requirements.

Monitoring requirements.

Water quality performance.

Treatment effectiveness.

Equipment age and condition.

Manufacturer requirements.

Failure modes.

Alarm systems.

Redundancy.

Emergency bypass procedures.

Replacement requirements.

The vendor shall identify deficiencies and provide recommendations for corrective action.

7. Water Quality Monitoring Program

The vendor shall establish a facility-specific water quality monitoring program.

The program shall identify:

Sampling locations.

Parameters to be tested.

Testing frequency.

Sampling methodology.

Laboratory requirements.

Acceptable ranges/limits.

Action levels.

Notification requirements.

Corrective actions.

Retesting requirements.

Documentation requirements.

Testing parameters shall be determined based on the intended use of the water and applicable standards and may include:

Microbiological parameters.

Total bacterial counts.

Endotoxin, where applicable.

Total organic carbon, where applicable.

Conductivity/resistivity.

pH.

Hardness.

Chlorine/chloramine.

Temperature.

Turbidity.

Total dissolved solids.

Chemical contaminants.

Other parameters identified through risk assessment or applicable standards.

7.1 Cooling Tower and Evaporative Condenser Legionella Monitoring

The selected vendor shall establish and support a documented Legionella prevention and monitoring program for all cooling towers, evaporative condensers, and other applicable building water systems capable of aerosolizing water.

At a minimum, the program shall include:

Quarterly Legionella testing of each cooling tower and applicable evaporative condenser, unless a different frequency is required by applicable law, regulation, accreditation requirements, manufacturer requirements, or the facility-specific risk assessment.

Development of a facility-specific sampling plan identifying each cooling tower, sampling location, sampling methodology, testing frequency, and responsible party.

Legionella testing performed by a laboratory meeting Section II.D (Minimum Requirements), using a validated culture method.

Evaluation of cooling tower water-management practices, including temperature, disinfectant residual, biocide treatment, scale, corrosion, sediment, and conditions conducive to biofilm formation.

Review of cooling tower treatment-system operation, chemical feed systems, monitoring equipment, alarms, maintenance records, and corrective-action procedures.

Establishment of Legionella action levels and response procedures based on current applicable guidance, regulatory requirements, and the facility's documented risk assessment.

Notification of designated District representatives, by telephone and email within twenty-four (24) hours after Contractor receives the result, when test results meet or exceed established action levels.

Documented corrective actions, which may include investigation, intensified treatment, cleaning/disinfection, resampling, and other measures identified by the Water Management Team and applicable guidance.

Documentation of all sampling, laboratory results, treatment activities, corrective actions, resampling, and follow-up activities.

Trending of Legionella results and other relevant cooling-tower water-quality parameters to identify recurring problems or deterioration in system control.

Review of Legionella monitoring results by the Hospital Water Management Team at established intervals.

Annual review and update of the cooling-tower Legionella monitoring program based on system changes, test results, risk assessment findings, regulatory requirements, and current industry guidance.

7.2 Potable Water Legionella Validation Sampling

The Lot 1 Contractor shall develop, for District approval, a validation sampling plan for domestic hot- and cold-water systems that identifies sampling locations, parameters (including Legionella culture and supporting parameters such as temperature and disinfectant residual), frequency, and action levels, based on the risk assessment, ANSI/ASHRAE Standard 188-2021, and the CDC toolkit. The Lot 1 Contractor shall perform validation sampling under the approved plan, with notification and corrective-action requirements the same as Section 7.1. The District may also request rapid quantitative polymerase chain reaction (qPCR) Legionella testing as a supplement to culture testing. The District will pay for validation sampling and any requested qPCR testing at the unit rates in Exhibit A.

8. Sterile Processing Department Water Management Plan

A dedicated Sterile Processing Water Quality Management Plan shall be developed as a component of the overall Hospital Water Management Program.

The vendor shall evaluate all water used during medical-device reprocessing, including water used for:

Manual cleaning.

Automated cleaning.

Ultrasonic cleaning.

Washer-disinfectors.

Instrument flushing.

Rinsing.

Final rinsing.

Preparation for sterilization.

Sterilizer operation, where applicable.

Other medical-device processing applications.

The vendor shall identify the required water quality for each application based upon applicable standards and the manufacturer's Instructions for Use (IFU) for the equipment and medical devices.

Sterilizers at District locations are supplied by dedicated steam generators maintained by the District rather than by building steam. As part of the SPD assessment, the Lot 1 Contractor shall evaluate the feedwater quality and any feedwater treatment for each steam generator serving sterilizers, and the quality of the steam it produces, consistent with ANSI/AAMI ST108:2023 and ANSI/AAMI ST79, and shall identify any treatment chemical or practice incompatible with sterilization steam. The SPD Water Quality Management Plan shall cover the Main Campus, the Patient Care Pavilion, Surgical Center Arlington, and any other District location where reusable medical devices are processed, as identified by the District.

9. SPD Water Quality Assessment

The vendor shall conduct a detailed assessment of the SPD water system, including:

Incoming water quality.

Pretreatment.

Water softeners.

Reverse osmosis systems.

Deionization systems.

Filters.

Storage tanks.

Distribution piping.

Point-of-use treatment.

Washer-disinfector supply.

Ultrasonic cleaner supply.

Sterilizer supply.

Final rinse water.

Instrument processing sinks.

Automated equipment.

Water quality monitoring equipment.

The vendor shall identify the source and treatment process for each water supply used within SPD.

10. Medical-Device Reprocessing Water Requirements

The vendor shall establish a written water-quality matrix identifying the required water quality for each SPD process.

The matrix shall include, at minimum:

* Process/application. * Equipment or device manufacturer. * Manufacturer's Instructions for Use (IFU). * Source water. * Pretreatment requirements. * Required treatment technology. * Required water quality. * Required temperature range, where applicable. * Conductivity/resistivity requirements. * Total dissolved solids, where applicable. * Hardness. * Chloride. * Silica, where applicable. * Total organic carbon, where applicable. * Microbiological requirements. * Endotoxin requirements, where applicable. * Chemical contaminant limits, where applicable. * Sampling location. * Testing frequency. * Acceptable operating range. * Action level. * Corrective action requirements. * Documentation requirements. * Responsible department/personnel.

The vendor shall identify differences in water-quality requirements between manual cleaning, automated cleaning, rinsing, final rinsing, sterilization, and other medical-device processing applications.

The vendor shall not establish a single water-quality specification for all SPD processes when equipment, device, or manufacturer requirements differ.

Where manufacturer IFUs establish more stringent water-quality requirements than general industry guidance, the more stringent applicable requirement shall be identified and incorporated into the water-quality matrix.

The vendor shall identify any conflicting requirements between equipment IFUs, medical-device IFUs, applicable standards, and facility procedures and shall notify the Hospital for resolution.

The final water-quality matrix shall be approved by the Hospital and incorporated into the SPD Water Quality Management Plan.

11. Lot 1 Deliverables, Schedule, and Ongoing Support

The Lot 1 Contractor shall deliver the following within the stated number of calendar days after the contract effective date, unless the District accepts a different schedule in the project plan. Each deliverable is subject to District acceptance under Section II.F (Payment Terms and Acceptance).

Project plan and data request: 15 days.

Facility Water System Assessment and Risk Assessment Report (Sections 4, 5.3, and 6): 90 days.

Revised Water Management Plan, including system maps, control measures, control limits, monitoring and validation sampling plans, and corrective-action procedures (Sections 5 and 7): 120 days.

SPD Water Quality Assessment, SPD Water Quality Management Plan, and water-quality matrix (Sections 8 through 10): 120 days.

Staff education and competency materials delivered and initial education sessions completed (Section 2, item 10): 150 days.

After acceptance of the revised plan, the Lot 1 Contractor shall provide the following for the remainder of the term:

Validation sampling under Sections 7.1 and 7.2 according to the approved sampling plans, with laboratory results delivered to the District within two (2) business days after the laboratory finalizes them.

Attendance at Water Management Team meetings (not less than quarterly), with a written summary of validation results, trends, and open corrective actions.

An annual program review and written update of the Water Management Plan and the SPD Water Quality Management Plan.

Annual refresher education for designated District team members.

Survey-readiness support on request, including assembling water management documentation for CMS, TJC, or state surveys.

12. Plan Integrity and Objectivity

(a) Basis of Requirements. Each control measure, limit, monitoring task, and corrective action in the revised Water Management Plan and the SPD Water Quality Management Plan shall identify its basis as one of the following: (1) federal, state, or local law or regulation; (2) an accreditation standard; (3) a consensus standard or published public-health guidance; (4) a manufacturer's Instructions for Use; or (5) a documented finding of the risk assessment. Each plan shall distinguish mandatory requirements from recommended practices and shall not describe a recommended practice as a regulatory or accreditation requirement. The Lot 1 Contractor shall deliver with each plan a requirements traceability matrix that lists each requirement and its basis.

(b) Performance-Based Requirements. Each plan shall state control measures as measurable parameters, limits, methods, and frequencies, and shall allow any method of equivalent accuracy. No plan shall require a specific brand, proprietary chemistry, proprietary monitoring or control platform, proprietary records software, or a specific laboratory, unless the District approves in writing a documented justification that identifies at least one alternative. Plan records shall be maintained in District systems or in a format the District can access without a Contractor license.

(c) Disclosure. Each Respondent for Lot 1 shall disclose in the Respondent Fact Table whether Respondent or any affiliate, within the five (5) years before the Response Deadline, (1) prepared or revised any part of the District's Water Management Plan, or (2) provided water treatment chemicals, services, or equipment to the District. During the term, the Lot 1 Contractor shall disclose in writing any financial interest it or an affiliate holds in any product, service, or vendor it recommends, and shall not recommend a product or service available only from itself or an affiliate without identifying an alternative.

(d) Certification. The Lot 1 Contractor shall certify in writing with each plan deliverable that the deliverable complies with this Section 12.

Lot 2: Chemical Water Treatment Program

1. Purpose

The Contractor shall provide a complete chemical water-treatment program for the water-based mechanical systems at the District locations listed under "Locations" at the end of this Section II.C, as identified in the System Schedule established under Section II.G. The objective is to maintain system reliability, minimize corrosion, scale, microbiological growth and fouling, protect equipment, maintain water quality, and support safe and reliable hospital operations.

The program shall include chemical treatment, routine testing, monitoring, system inspections, reporting, equipment maintenance, chemical delivery, troubleshooting, and recommendations for corrective action.

The Contractor shall coordinate its activities with the hospital's Facilities/Engineering Department and comply with all applicable hospital policies, safety requirements, manufacturer requirements, and applicable federal, state, and local regulations.

2. Systems Included

The chemical-treatment program shall cover, as applicable, the following systems:

A. Chilled-Water Systems

Closed-loop chilled-water systems

Primary chilled-water loops

Secondary chilled-water loops

Variable-flow chilled-water systems

Air-handler coils

Fan-coil units

Heat exchangers

Chilled-water pumps

Expansion Tanks

Buffer tanks

Associated piping and components

Treatment shall control:

Corrosion

Scale/deposition

Microbiological activity

Suspended solids

Fouling

B. Heating Hot-Water Systems

Closed-loop heating-water systems

Hot-water boiler loops

Heating-water distribution

Reheat-water systems

Heating coils

Heat exchangers

Pumps

Expansion Tanks

Associated piping

C. Steam Boiler Systems

Where applicable, the Contractor shall provide treatment for:

Steam boilers

Boiler feedwater

Condensate-return systems

Deaerator/feedwater systems

Blowdown systems

Chemical feed systems

The program shall address:

Scale

Corrosion

Oxygen control

Alkalinity/pH

Condensate corrosion

Carryover

Boiler-water chemistry

Deposit control

D. Cooling Towers / Open Recirculating Systems

The program shall include:

Cooling towers

Evaporative condensers

Open condenser-water systems

Cooling-tower basins

Distribution systems

Associated piping

Side-stream filtration equipment

Chemical feed equipment

Automated controllers

Treatment shall address:

Scale

Corrosion

Microbiological growth

Organic deposits

Suspended solids

Biofilm

Legionella risk management

E. Domestic Hot-Water Systems

As directed by the District's Water Management Program, the Contractor shall provide water-quality monitoring and treatment recommendations for:

Domestic hot-water storage tanks

Domestic hot-water recirculation loops

Heat exchangers

Water heaters

Associated piping

Important: Domestic potable-water chemical treatment shall only be performed using products and methods specifically approved for potable-water applications and permitted by applicable requirements.

F. Domestic Cold-Water Systems

Where chemical treatment is required or specified:

Potable-water storage

Treatment equipment

Water softeners

Filtration systems

Other applicable treatment equipment

The Contractor shall distinguish potable-water treatment from HVAC/mechanical-system treatment and shall not introduce non-potable treatment chemicals into potable-water systems.

G. Glycol Systems

Where applicable:

Chilled-water glycol loops

Heating-water glycol loops

Snow-melt systems

Emergency/critical cooling loops

Process cooling loops

Testing shall include, as applicable:

Glycol concentration

pH

Reserve alkalinity

Corrosion-inhibitor concentration

Conductivity

Appearance

Contamination

H. Condensate Systems

Where applicable:

Steam condensate return

Condensate receivers

Condensate piping

Flash tanks

Feedwater systems

3. Hospital-Critical Requirements

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow FCI Three Rivers-Replace Generators, Transformers, and Electrical Infrastructure Active Contract Opportunity Notice

JUSTICE, DEPARTMENT OF

Bid Due: 11/30/2026

Project: New Light Rail Vehicles Ref. #: P-2095607 Type: RFP Status: Open Open

Dallas Area Rapid Transit

Bid Due: 2/26/2027

Request for Competitive Sealed Proposals - Unified Digital Experience (UDE) Follow Solicitation Solicitation

State Government of Texas

Bid Due: 11/19/2026

Follow New Lease for VA Clinic (CBOC) Tarrant County, Texas Active Contract Opportunity

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 11/20/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.