| Location: | North Carolina |
|---|---|
| Posted: | Oct 13, 2024 |
| Due: | Oct 24, 2024 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 314-FB 2024-001R_30136-016 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 314-FB 2024-001R_30136-016 |
| Project Title: | WTP Water Intake Screen Replacement |
| Description: | Intake Site near the intersection of Stevens Mill Road and Farm Road in Goldsboro, NC. The Work consists of the following: • Replacement of one wedge-wire water supply intake screen (to be furnished by Owner). • Pre-construction mussel survey with relocation of federally protected mussels, if found (see Appendix A – M&R #4 for requirements). • Post-construction Neuse River Waterdog Survey (see Appendix A – M&R #5 for requirements). • Dredging in the vicinity of the intake screen to facilitate screen removal and replacement of the screen. • Hauling and disposal of the materials removed from the work area to an acceptable offsite disposal location. |
| Opening Date: | 10/24/2024 2:00 PM |
| Posted Date: | 10/12/2024 |
| Status: | Open |
| Department: | CITY OF GOLDSBORO |
|
Solicitation Number
*
314-FB 2024-001R_30136-016
|
Department
CITY OF GOLDSBORO
|
Status Reason
Open
|
|
|
Opening Date
2024-10-24T14:00:00.0000000
|
Posted Date
*
2024-10-11T15:39:11.0000000Z
|
Commodity Code
Water and sewer utilities
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
Intake Site near the intersection of Stevens Mill Road and Farm Road in Goldsboro, NC. The Work consists of the following: • Replacement of one wedge-wire water supply intake screen (to be furnished by Owner). • Pre-construction mussel survey with relocation of federally protected mussels, if found (see Appendix A – M&R #4 for requirements). • Post-construction Neuse River Waterdog Survey (see Appendix A – M&R #5 for requirements). • Dredging in the vicinity of the intake screen to facilitate screen removal and replacement of the screen. • Hauling and disposal of the materials removed from the work area to an acceptable offsite disposal location.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can: