| Project Title: | BRIDGE REPLACEMENT ON RIVERSHORE ROAD OVER THE PASQUOTANK RIVER |
| Description: | The Project consists of installation of sedimentation and erosion control measures; traffic control measures; demolition work which includes selective clearing and grubbing, the removal of two approximately 60-inch corrugated metal pipes from the existing river channel, saw-cutting pavement, removal of pavement and curb and gutter, and abandonment of an 8-inch water main and 2-inch force main; construction of the new bridge which consists of driving piles, constructing end bents and wing walls, constructing the cored-slab bridge, rip-rap toe slope, and approach slab on each side; utility work, which includes installing the new 8-inch water main, fire hydrant, connections to existing water mains, relocating the existing water main under the new drainage pipe, testing and disinfection; drainage work which includes the installation of area drains and drainage pipes; roadway work which includes providing and installing select backfill, compaction, pavement, curb and gutter, and guard rails; site improvement work which includes cleaning up, seeding, fertilizing and mulching all of the disturbed areas; any required dewatering work; and all else required; complete in every respect; tested and accepted; and placed into operation to the satisfaction of the Owner and Engineer. The foregoing description shall not be construed as a complete description of all work required. |
| Opening Date: | 11/4/2024 2:00 PM |
| Posted Date: | 10/12/2024 |
| Status: | Open |
| Department: | CITY OF ELIZABETH CITY |
|
Solicitation Number
*
498-1142024
|
Department
CITY OF ELIZABETH CITY
|
Status Reason
Open
|
|
|
Opening Date
2024-11-04T14:00:00.0000000
|
Posted Date
*
2024-10-11T15:35:13.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
Read Ad Attached
|
||
|
Description
The Project consists of installation of sedimentation and erosion control measures; traffic control measures; demolition work which includes selective clearing and grubbing, the removal of two approximately 60-inch corrugated metal pipes from the existing river channel, saw-cutting pavement, removal of pavement and curb and gutter, and abandonment of an 8-inch water main and 2-inch force main; construction of the new bridge which consists of driving piles, constructing end bents and wing walls, constructing the cored-slab bridge, rip-rap toe slope, and approach slab on each side; utility work, which includes installing the new 8-inch water main, fire hydrant, connections to existing water mains, relocating the existing water main under the new drainage pipe, testing and disinfection; drainage work which includes the installation of area drains and drainage pipes; roadway work which includes providing and installing select backfill, compaction, pavement, curb and gutter, and guard rails; site improvement work which includes cleaning up, seeding, fertilizing and mulching all of the disturbed areas; any required dewatering work; and all else required; complete in every respect; tested and accepted; and placed into operation to the satisfaction of the Owner and Engineer. The foregoing description shall not be construed as a complete description of all work required.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...clearing and herbicide applications to shoreline rip rap and lock esplanades at all ...