RFP - MATERIALS TESTING & SPECIAL INSPECTION SERVICES - VARIOUS MUSD PROJECTS

Location: California
Posted: May 13, 2026
Due: May 28, 2026
Agency: Martinez Unified School District
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • H - Quality Control, Testing, and Inspection Services
Publication URL: To access bid details, please log in.
  • RFP - MATERIALS TESTING & SPECIAL INSPECTION SERVICES - VARIOUS MUSD PROJECTS

    RFP - Material Testing & Special Inspection Services - Various MUSD Projects

    • RFP Due Date:  May 28, 2026 by 2:00pm
  • Attachment Preview

    MARTINEZ UNIFIED SCHOOL DISTRICT
    921 Susana Street
    Martinez, CA 94553
    REQUEST FOR PROPOSAL
    May 12, 2026
    MATERIAL TESTING & SPECIAL INSPECTION SERVICES
    Morello Park Elementary School - TK Building Project
    Alhambra High School - New Gymnasium Project
    Alhambra High School - Upper Field, Track, and Tennis Court Project
    1200 Morello Park Drive, Martinez, CA 94553 (Morello Park Elementary School)
    150 E Street, Martinez, CA 94553 (Alhambra High School)
    The Martinez Unified School District is seeking proposals from qualified material testing firms approved by
    DSA for material testing and special inspection services for the Alhambra High School and Morello Park
    Elementary School Campuses.
    Background Information:
    General testing and special inspection services, including but not limited to building structures, on/off-site
    and site service work for construction of new t/k elementary school buildings, a new gymnasium building,
    and new upper synthetic turf field, new track, and new tennis court (PT-slab) and additions to the existing
    campus, located at 1200 Morello Park Drive, & 150 E Street, Martinez, CA 94553. Project consists of
    approximately 9,424 (AHS Gym) and 2,621 (Morello Park TK) square feet of new structures (single story
    wood framed) in accordance with the plans and specifications prepared by SVA Architects. AHS Upper
    Field Project consists of & Huckabee. The project is bound by a project labor agreement. The successful
    bidder is required to execute the agreement to be bound. This will occur at the time of award.
    AHS GYM
    Start of Construction: June 5, 2026
    Construction Period: June 5, 2026 through July 30, 2027
    Estimated Total Construction Cost: $ 9,000,000.00
    Morello Park TK
    Start of Construction: June 5, 2026
    Construction Period: June 5, 2026 through July 30, 2027
    Estimated Total Construction Cost: $ 3,800,000.00
    AHS Upper Field, Track, Tennis Court
    Start of Construction: June 5, 2026
    Construction Period: June 5, 2026 through November 30, 2026
    Estimated Total Construction Cost: $ 3,500,000.00
    Proposals:
    Due Date: May 28, 2026, by 2:00pm
    Martinez Unified School District
    Morello Park TK Building & Various AHS Projects
    RFP - Material Testing and Special Inspection Page 1 of 6

    Location: Martinez Unified School District
    921 Susana Street
    Martinez Ca 94553
    ATTN: Jared Ruddell, Facilities and Operations Coordinator
    Phone: (925) 335-5800
    Refer all inquiries concerning this RFP to:
    Patrick Walsh Cell: (925) 326-0166
    Cumming Group E-mail: patrick.walsh@cumming-group.com
    Copy: ramon.parocua@cumming-group.com
    Proposal Criteria:
    Provide general information about your firm including:
    a. Number of years in business.
    b. Location of office from which work will be performed/dispatched.
    c. Professional credentials, licenses, etc.
    d. Verification of DSA approval.
    e. Relevant experience including:
    1. Project name/location
    2. Year completed/current status
    3. Client name (District name) and contact. 2 only
    4. IOR names and contact information. 2 only
    f. Identify any proposed consultants to be used on the project.
    g. Identify lead time requirements for scheduling
    h. Include any client references and/or letters of recommendation. 2 only
    Pricing Format:
    Please provide unit pricing and total sum as noted below for all applicable services listed below.
    Location assumptions:
    Concrete Central Concrete, Martinez CA
    Asphalt County Quarry, Concord CA
    Recycled base rock County Quarry, Concord CA
    Virgin base rock Syar Industries, Vallejo CA
    Structural Steel Within a 100 mile radius of project
    Rebar Within a 125 mile radius of project
    The District recognizes that the unit pricing proposed by the vendor is an estimate and as such, quantities
    are subject to change based on actual site requirements.
    ALL SOIL INSPECTIONS RELATED TO THE BUILDING PAD, SITE GRADING, TRENCHING AND
    Martinez Unified School District
    Morello Park TK Building & Various AHS Projects
    RFP - Material Testing and Special Inspection Page 2 of 6

    BASE ROCK, AB SAMPLING, AC IN-PLACE DENSITY, LIME TREATMENT, SUBDRAIN
    OBSERVATION, CONSTRUCTION WILL BE BY OTHERS. (District Geo Tech: Geo Engineering
    Solutions, Inc)
    AHS GYM:
    1) Concrete
    A) Concrete mix design review 6 hours
    B) Batch plant inspections 32 hours
    C) On site concrete sampling 40 hours
    D) Break tests 60 total
    2) Anchor Bolts/Connecting bolts
    A) Material ID 16 hours
    B) Connecting bolts 16 hours
    3) Structural steel
    A) Material ID 12 hours
    B) Shop welding 20 hours
    C) On site welding 16 hours
    4) Re-Bar
    A) Material ID sample and tag 20 hours
    B) Testing rebar 16 tests
    5) Glu Lamb Beams
    A) In plant inspection (Oregon) LS $12,000.00
    6) Anchors
    A) Epoxy/wedge anchor pull tests 16 hours
    B) Anchor bolt and connecting bolt torque test 16 hours
    7) Paving
    A) Asphalt submittal review 4 hours
    B) Quality control during paving 24 hours
    8) Walk Way Awning/Canopy.
    A) Material ID 8 hours
    Martinez Unified School District
    Morello Park TK Building & Various AHS Projects
    RFP - Material Testing and Special Inspection Page 3 of 6

    B) Shop welding 20 hours
    C) On-site Welding 12 hours
    D) Concrete batch plant inspection 4 hours
    E) Concrete site samples 4 hours
    9) Estimate total administration fees based on above information $_____________Budget
    10) Travel Time Lump Sum 100 hours $_____________
    11) Minimum Charge (hours) ____________
    Morello Park TK:
    12) Concrete
    E) Concrete mix design review 4 hours
    F) Batch plant inspections 10 hours
    G) On site concrete sampling 10 hours
    H) Break tests 20 total
    13) Anchor Bolts/Connecting bolts
    C) Material ID 6 hours
    D) Connecting bolts 4 hours
    14) Re-Bar
    C) Material ID sample and tag 8 hours
    D) Testing rebar 8 tests
    15) Anchors
    C) Epoxy/wedge anchor pull tests 6 hours
    D) Anchor bolt and connecting bolt torque test 6 hours
    16) Paving
    C) Asphalt submittal review 2 hours
    D) Quality control during paving 10 hours
    17) Estimate total administration fees based on above information $_____________Budget
    18) Travel Time Lump Sum 60 hours $_____________
    19) Minimum Charge (hours) ____________
    Martinez Unified School District
    Morello Park TK Building & Various AHS Projects
    RFP - Material Testing and Special Inspection Page 4 of 6

    AHS Upper Field, Track, Tennis Court:
    20) Concrete
    I) Concrete mix design review 6 hours
    J) Batch plant inspections 40 hours
    K) On site concrete sampling 60 hours
    L) Break tests 50 total
    21) PT Tendon Placement & Stressing Inspection 80 hours
    22) Re-Bar
    E) Material ID sample and tag 24 hours
    F) Testing rebar 15 tests
    23) Anchors
    E) Epoxy/wedge anchor pull tests 16 hours
    F) Anchor bolt and connecting bolt torque test 8 hours
    24) Paving
    E) Asphalt submittal review 4 hours
    F) Quality control during paving 16 hours
    25) Estimate total administration fees based on above information $_____________Budget
    26) Travel Time Lump Sum 60 hours $_____________
    27) Minimum Charge (hours) ____________
    Additional Fees (Rates):
    Enclose Firm Rate Sheet
    a. Staff Engineer
    b. Travel Time
    c. Mileage
    d. Vehicle
    e. Overtime Rate
    f. Double-time Rate
    Martinez Unified School District
    Morello Park TK Building & Various AHS Projects
    RFP - Material Testing and Special Inspection Page 5 of 6

    g. Shift Differential
    h. Administration Fees
    i. Reimbursables Requested (List with Applicable Rates)
    Exclusions/Qualifications:
    Please list any special qualifications or exclusions that pertain to this proposal.
    Evaluation Criteria:
    1. Qualifications - experience, commensurate project history, and firm's commitment to project.
    2. Approach - Commitment to provide services in a timely and efficient manner.
    3. Fees - Reasonable and competitive fee structure.
    4. Local resources and presence.
    Limitations:
    The District reserves the right to redefine or adjust its priorities, and modify the process as it deems
    necessary, and to select one or more firms to perform services. At its discretion, the District may eliminate
    any firm or waive any informality in the selection process.
    This Request for Proposal does not commit Martinez Unified School District to award a contract or to
    reimburse the proposer for costs incurred in submitting this proposal. The Martinez Unified School District
    reserves the right to reject any or all proposals received as a result of this request, to negotiate with any
    proposer, to extend the submission deadline, or to amend or cancel in part or in its entirety this proposal,
    if it is in the best interest of the District.
    Jared Ruddell, Coordinator Facilities & Operations
    Martinez Unified School District
    Martinez Unified School District
    Morello Park TK Building & Various AHS Projects
    RFP - Material Testing and Special Inspection Page 6 of 6

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Monrovia Library Story Room Expansion Department: Public Works RFP Number: A-1002 Start Date:

    City of Monrovia

    Bid Due: 8/19/2026

    RFB 25-26-30 Annual Contract for Custom Branding Services for Recreation Division Apparel and

    City of Visalia

    Bid Due: 9/03/2026

    0820 - 0820 ON-CALL ELEC. SERVS. FOR EV/PV INSTALLS, AND INSIDE WIREMAN WORK

    City of Los Angeles

    Bid Due: 8/11/2026

    RFx Name: BPM013316 RFx Begin Date (UTC+0): RFQ - AS-NEEDED MEDICAL WASTE REMOVAL

    County of San Diego

    Bid Due: 8/07/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.