RFP - Material Testing & Special Inspection Services - Various MUSD Projects
MARTINEZ UNIFIED SCHOOL DISTRICT
921 Susana Street
Martinez, CA 94553
REQUEST FOR PROPOSAL
May 12, 2026
MATERIAL TESTING & SPECIAL INSPECTION SERVICES
Morello Park Elementary School - TK Building Project
Alhambra High School - New Gymnasium Project
Alhambra High School - Upper Field, Track, and Tennis Court Project
1200 Morello Park Drive, Martinez, CA 94553 (Morello Park Elementary School)
150 E Street, Martinez, CA 94553 (Alhambra High School)
The Martinez Unified School District is seeking proposals from qualified material testing firms approved by
DSA for material testing and special inspection services for the Alhambra High School and Morello Park
Elementary School Campuses.
Background Information:
General testing and special inspection services, including but not limited to building structures, on/off-site
and site service work for construction of new t/k elementary school buildings, a new gymnasium building,
and new upper synthetic turf field, new track, and new tennis court (PT-slab) and additions to the existing
campus, located at 1200 Morello Park Drive, & 150 E Street, Martinez, CA 94553. Project consists of
approximately 9,424 (AHS Gym) and 2,621 (Morello Park TK) square feet of new structures (single story
wood framed) in accordance with the plans and specifications prepared by SVA Architects. AHS Upper
Field Project consists of & Huckabee. The project is bound by a project labor agreement. The successful
bidder is required to execute the agreement to be bound. This will occur at the time of award.
AHS GYM
Start of Construction: June 5, 2026
Construction Period: June 5, 2026 through July 30, 2027
Estimated Total Construction Cost: $ 9,000,000.00
Morello Park TK
Start of Construction: June 5, 2026
Construction Period: June 5, 2026 through July 30, 2027
Estimated Total Construction Cost: $ 3,800,000.00
AHS Upper Field, Track, Tennis Court
Start of Construction: June 5, 2026
Construction Period: June 5, 2026 through November 30, 2026
Estimated Total Construction Cost: $ 3,500,000.00
Proposals:
Due Date: May 28, 2026, by 2:00pm
Martinez Unified School District
Morello Park TK Building & Various AHS Projects
RFP - Material Testing and Special Inspection Page 1 of 6
Location: Martinez Unified School District
921 Susana Street
Martinez Ca 94553
ATTN: Jared Ruddell, Facilities and Operations Coordinator
Phone: (925) 335-5800
Refer all inquiries concerning this RFP to:
Patrick Walsh Cell: (925) 326-0166
Cumming Group E-mail: patrick.walsh@cumming-group.com
Copy: ramon.parocua@cumming-group.com
Proposal Criteria:
Provide general information about your firm including:
a. Number of years in business.
b. Location of office from which work will be performed/dispatched.
c. Professional credentials, licenses, etc.
d. Verification of DSA approval.
e. Relevant experience including:
1. Project name/location
2. Year completed/current status
3. Client name (District name) and contact. 2 only
4. IOR names and contact information. 2 only
f. Identify any proposed consultants to be used on the project.
g. Identify lead time requirements for scheduling
h. Include any client references and/or letters of recommendation. 2 only
Pricing Format:
Please provide unit pricing and total sum as noted below for all applicable services listed below.
Location assumptions:
Concrete Central Concrete, Martinez CA
Asphalt County Quarry, Concord CA
Recycled base rock County Quarry, Concord CA
Virgin base rock Syar Industries, Vallejo CA
Structural Steel Within a 100 mile radius of project
Rebar Within a 125 mile radius of project
The District recognizes that the unit pricing proposed by the vendor is an estimate and as such, quantities
are subject to change based on actual site requirements.
ALL SOIL INSPECTIONS RELATED TO THE BUILDING PAD, SITE GRADING, TRENCHING AND
Martinez Unified School District
Morello Park TK Building & Various AHS Projects
RFP - Material Testing and Special Inspection Page 2 of 6
BASE ROCK, AB SAMPLING, AC IN-PLACE DENSITY, LIME TREATMENT, SUBDRAIN
OBSERVATION, CONSTRUCTION WILL BE BY OTHERS. (District Geo Tech: Geo Engineering
Solutions, Inc)
AHS GYM:
1) Concrete
A) Concrete mix design review 6 hours
B) Batch plant inspections 32 hours
C) On site concrete sampling 40 hours
D) Break tests 60 total
2) Anchor Bolts/Connecting bolts
A) Material ID 16 hours
B) Connecting bolts 16 hours
3) Structural steel
A) Material ID 12 hours
B) Shop welding 20 hours
C) On site welding 16 hours
4) Re-Bar
A) Material ID sample and tag 20 hours
B) Testing rebar 16 tests
5) Glu Lamb Beams
A) In plant inspection (Oregon) LS $12,000.00
6) Anchors
A) Epoxy/wedge anchor pull tests 16 hours
B) Anchor bolt and connecting bolt torque test 16 hours
7) Paving
A) Asphalt submittal review 4 hours
B) Quality control during paving 24 hours
8) Walk Way Awning/Canopy.
A) Material ID 8 hours
Martinez Unified School District
Morello Park TK Building & Various AHS Projects
RFP - Material Testing and Special Inspection Page 3 of 6
B) Shop welding 20 hours
C) On-site Welding 12 hours
D) Concrete batch plant inspection 4 hours
E) Concrete site samples 4 hours
9) Estimate total administration fees based on above information $_____________Budget
10) Travel Time Lump Sum 100 hours $_____________
11) Minimum Charge (hours) ____________
Morello Park TK:
12) Concrete
E) Concrete mix design review 4 hours
F) Batch plant inspections 10 hours
G) On site concrete sampling 10 hours
H) Break tests 20 total
13) Anchor Bolts/Connecting bolts
C) Material ID 6 hours
D) Connecting bolts 4 hours
14) Re-Bar
C) Material ID sample and tag 8 hours
D) Testing rebar 8 tests
15) Anchors
C) Epoxy/wedge anchor pull tests 6 hours
D) Anchor bolt and connecting bolt torque test 6 hours
16) Paving
C) Asphalt submittal review 2 hours
D) Quality control during paving 10 hours
17) Estimate total administration fees based on above information $_____________Budget
18) Travel Time Lump Sum 60 hours $_____________
19) Minimum Charge (hours) ____________
Martinez Unified School District
Morello Park TK Building & Various AHS Projects
RFP - Material Testing and Special Inspection Page 4 of 6
AHS Upper Field, Track, Tennis Court:
20) Concrete
I) Concrete mix design review 6 hours
J) Batch plant inspections 40 hours
K) On site concrete sampling 60 hours
L) Break tests 50 total
21) PT Tendon Placement & Stressing Inspection 80 hours
22) Re-Bar
E) Material ID sample and tag 24 hours
F) Testing rebar 15 tests
23) Anchors
E) Epoxy/wedge anchor pull tests 16 hours
F) Anchor bolt and connecting bolt torque test 8 hours
24) Paving
E) Asphalt submittal review 4 hours
F) Quality control during paving 16 hours
25) Estimate total administration fees based on above information $_____________Budget
26) Travel Time Lump Sum 60 hours $_____________
27) Minimum Charge (hours) ____________
Additional Fees (Rates):
Enclose Firm Rate Sheet
a. Staff Engineer
b. Travel Time
c. Mileage
d. Vehicle
e. Overtime Rate
f. Double-time Rate
Martinez Unified School District
Morello Park TK Building & Various AHS Projects
RFP - Material Testing and Special Inspection Page 5 of 6
g. Shift Differential
h. Administration Fees
i. Reimbursables Requested (List with Applicable Rates)
Exclusions/Qualifications:
Please list any special qualifications or exclusions that pertain to this proposal.
Evaluation Criteria:
1. Qualifications - experience, commensurate project history, and firm's commitment to project.
2. Approach - Commitment to provide services in a timely and efficient manner.
3. Fees - Reasonable and competitive fee structure.
4. Local resources and presence.
Limitations:
The District reserves the right to redefine or adjust its priorities, and modify the process as it deems
necessary, and to select one or more firms to perform services. At its discretion, the District may eliminate
any firm or waive any informality in the selection process.
This Request for Proposal does not commit Martinez Unified School District to award a contract or to
reimburse the proposer for costs incurred in submitting this proposal. The Martinez Unified School District
reserves the right to reject any or all proposals received as a result of this request, to negotiate with any
proposer, to extend the submission deadline, or to amend or cancel in part or in its entirety this proposal,
if it is in the best interest of the District.
Jared Ruddell, Coordinator Facilities & Operations
Martinez Unified School District
Martinez Unified School District
Morello Park TK Building & Various AHS Projects
RFP - Material Testing and Special Inspection Page 6 of 6

With GovernmentContracts, you can:
Monrovia Library Story Room Expansion Department: Public Works RFP Number: A-1002 Start Date:
City of Monrovia
Bid Due: 8/19/2026
RFB 25-26-30 Annual Contract for Custom Branding Services for Recreation Division Apparel and
City of Visalia
Bid Due: 9/03/2026
0820 - 0820 ON-CALL ELEC. SERVS. FOR EV/PV INSTALLS, AND INSIDE WIREMAN WORK
City of Los Angeles
Bid Due: 8/11/2026
RFx Name: BPM013316 RFx Begin Date (UTC+0): RFQ - AS-NEEDED MEDICAL WASTE REMOVAL
County of San Diego
Bid Due: 8/07/2026