RFP - MATERIALS TESTING & SPECIAL INSPECTION SERVICES - VARIOUS MUSD PROJECTS

Location: California
Posted: May 13, 2026
Due: May 28, 2026
Agency: Martinez Unified School District
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • H - Quality Control, Testing, and Inspection Services
Publication URL: To access bid details, please log in.
  • RFP - MATERIALS TESTING & SPECIAL INSPECTION SERVICES - VARIOUS MUSD PROJECTS

    RFP - Material Testing & Special Inspection Services - Various MUSD Projects

    • RFP Due Date:  May 28, 2026 by 2:00pm
  • Attachment Preview

    MARTINEZ UNIFIED SCHOOL DISTRICT
    921 Susana Street
    Martinez, CA 94553
    REQUEST FOR PROPOSAL
    May 12, 2026
    MATERIAL TESTING & SPECIAL INSPECTION SERVICES
    Morello Park Elementary School - TK Building Project
    Alhambra High School - New Gymnasium Project
    Alhambra High School - Upper Field, Track, and Tennis Court Project
    1200 Morello Park Drive, Martinez, CA 94553 (Morello Park Elementary School)
    150 E Street, Martinez, CA 94553 (Alhambra High School)
    The Martinez Unified School District is seeking proposals from qualified material testing firms approved by
    DSA for material testing and special inspection services for the Alhambra High School and Morello Park
    Elementary School Campuses.
    Background Information:
    General testing and special inspection services, including but not limited to building structures, on/off-site
    and site service work for construction of new t/k elementary school buildings, a new gymnasium building,
    and new upper synthetic turf field, new track, and new tennis court (PT-slab) and additions to the existing
    campus, located at 1200 Morello Park Drive, & 150 E Street, Martinez, CA 94553. Project consists of
    approximately 9,424 (AHS Gym) and 2,621 (Morello Park TK) square feet of new structures (single story
    wood framed) in accordance with the plans and specifications prepared by SVA Architects. AHS Upper
    Field Project consists of & Huckabee. The project is bound by a project labor agreement. The successful
    bidder is required to execute the agreement to be bound. This will occur at the time of award.
    AHS GYM
    Start of Construction:
    Construction Period:
    Estimated Total Construction Cost:
    Morello Park TK
    Construction Period:
    Estimated Total Construction Cost:
    AHS Upper Field, Track, Tennis Court
    Start of Construction:
    Construction Period:
    Estimated Total Construction Cost:
    June 5, 2026
    June 5, 2026 through July 30, 2027
    $ 9,000,000.00
    Start of Construction: June 5, 2026
    June 5, 2026 through July 30, 2027
    $ 3,800,000.00
    June 5, 2026
    June 5, 2026 through November 30, 2026
    $ 3,500,000.00
    Proposals:
    Due Date: May 28, 2026, by 2:00pm
    Martinez Unified School District
    Morello Park TK Building & Various AHS Projects
    RFP - Material Testing and Special Inspection
    Page 1 of 6
    Location:
    Martinez Unified School District
    921 Susana Street
    Martinez Ca 94553
    ATTN: Jared Ruddell, Facilities and Operations Coordinator
    Phone: (925) 335-5800
    Refer all inquiries concerning this RFP to:
    Patrick Walsh
    Cumming Group
    Cell:
    E-mail:
    Copy:
    (925) 326-0166
    patrick.walsh@cumming-group.com
    ramon.parocua@cumming-group.com
    Proposal Criteria:
    Provide general information about your firm including:
    a. Number of years in business.
    b. Location of office from which work will be performed/dispatched.
    c. Professional credentials, licenses, etc.
    d. Verification of DSA approval.
    e. Relevant experience including:
    1. Project name/location
    2. Year completed/current status
    3. Client name (District name) and contact. 2 only
    4. IOR names and contact information. 2 only
    f. Identify any proposed consultants to be used on the project.
    g. Identify lead time requirements for scheduling
    h. Include any client references and/or letters of recommendation. 2 only
    Pricing Format:
    Please provide unit pricing and total sum as noted below for all applicable services listed below.
    Location assumptions:
    Concrete
    Asphalt
    Recycled base rock
    Virgin base rock
    Structural Steel
    Rebar
    Central Concrete, Martinez CA
    County Quarry, Concord CA
    County Quarry, Concord CA
    Syar Industries, Vallejo CA
    Within a 100 mile radius of project
    Within a 125 mile radius of project
    The District recognizes that the unit pricing proposed by the vendor is an estimate and as such, quantities
    are subject to change based on actual site requirements.
    ALL SOIL INSPECTIONS RELATED TO THE BUILDING PAD, SITE GRADING, TRENCHING AND
    Martinez Unified School District
    Morello Park TK Building & Various AHS Projects
    RFP Material Testing and Special Inspection
    Page 2 of 6
    BASE ROCK, AB SAMPLING, AC IN-PLACE DENSITY, LIME TREATMENT, SUBDRAIN
    OBSERVATION, CONSTRUCTION WILL BE BY OTHERS. (District Geo Tech: Geo Engineering
    Solutions, Inc)
    AHS GYM:
    1) Concrete
    A) Concrete mix design review
    B) Batch plant inspections
    C) On site concrete sampling
    D) Break tests
    6 hours
    32 hours
    40 hours
    60 total
    2) Anchor Bolts/Connecting bolts
    A) Material ID
    B) Connecting bolts
    16 hours
    16 hours
    3) Structural steel
    A) Material ID
    B) Shop welding
    C) On site welding
    4) Re-Bar
    A) Material ID sample and tag
    B) Testing rebar
    5) Glu Lamb Beams
    A) In plant inspection (Oregon)
    6) Anchors
    A) Epoxy/wedge anchor pull tests
    B) Anchor bolt and connecting bolt torque test
    7) Paving
    A) Asphalt submittal review
    B) Quality control during paving
    8) Walk Way Awning/Canopy.
    A) Material ID
    Martinez Unified School District
    Morello Park TK Building & Various AHS Projects
    RFP Material Testing and Special Inspection
    12 hours
    20 hours
    16 hours
    20 hours
    16 tests
    LS $12,000.00
    16 hours
    16 hours
    4 hours
    24 hours
    8 hours
    Page 3 of 6
    B) Shop welding
    C) On-site Welding
    D) Concrete batch plant inspection
    E) Concrete site samples
    20 hours
    12 hours
    4 hours
    4 hours
    9) Estimate total administration fees based on above information $_____________Budget
    10) Travel Time Lump Sum
    100 hours $_____________
    11) Minimum Charge
    (hours) ____________
    Morello Park TK:
    12) Concrete
    E) Concrete mix design review
    F) Batch plant inspections
    G) On site concrete sampling
    H) Break tests
    13) Anchor Bolts/Connecting bolts
    C) Material ID
    D) Connecting bolts
    14) Re-Bar
    C) Material ID sample and tag
    D) Testing rebar
    15) Anchors
    C) Epoxy/wedge anchor pull tests
    D) Anchor bolt and connecting bolt torque test
    4 hours
    10 hours
    10 hours
    20 total
    6 hours
    4 hours
    8 hours
    8 tests
    6 hours
    6 hours
    16) Paving
    C) Asphalt submittal review
    D) Quality control during paving
    2 hours
    10 hours
    17) Estimate total administration fees based on above information $_____________Budget
    18) Travel Time Lump Sum
    60 hours $_____________
    19) Minimum Charge
    Martinez Unified School District
    Morello Park TK Building & Various AHS Projects
    RFP Material Testing and Special Inspection
    (hours) ____________
    Page 4 of 6
    AHS Upper Field, Track, Tennis Court:
    20) Concrete
    I) Concrete mix design review
    J) Batch plant inspections
    K) On site concrete sampling
    L) Break tests
    21) PT Tendon Placement & Stressing Inspection
    6 hours
    40 hours
    60 hours
    50 total
    80 hours
    22) Re-Bar
    E) Material ID sample and tag
    F) Testing rebar
    24 hours
    15 tests
    23) Anchors
    E) Epoxy/wedge anchor pull tests
    F) Anchor bolt and connecting bolt torque test
    16 hours
    8 hours
    24) Paving
    E) Asphalt submittal review
    F) Quality control during paving
    4 hours
    16 hours
    25) Estimate total administration fees based on above information $_____________Budget
    26) Travel Time Lump Sum
    60 hours $_____________
    27) Minimum Charge
    (hours) ____________
    Additional Fees (Rates):
    Enclose Firm Rate Sheet
    a. Staff Engineer
    b. Travel Time
    c. Mileage
    d. Vehicle
    e. Overtime Rate
    f. Double-time Rate
    Martinez Unified School District
    Morello Park TK Building & Various AHS Projects
    RFP Material Testing and Special Inspection
    Page 5 of 6
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...Geotechnical Engineering, Materials Testing, and Inspection Services. The County of Los Angeles Public..., ...

    La County

    Bid Due: 6/17/2026

    ...Solicitation Number: BRC0000649 Title: On-Call Geotechnical Engineering, Materials Testing... from qualified firms to ...

    Los Angeles County

    Bid Due: 6/17/2026

    ...BRC0000649 - On-Call Geotechnical Engineering, Materials Testing, and Inspection Services... proposals from qualified ...

    City of Los Angeles

    Bid Due: 6/18/2026

    ...*Certified SB/DVBE only* Multi-Provider Hazardous Materials Testing and Reporting Services in Los..., supplies, ...

    State Government of California

    Bid Due: 6/19/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.