Public Notice – Pre-Solicitation Conference Materials — June 2025-Available Online

Location: Utah
Posted: Dec 16, 2025
Due: Dec 31, 2025
Agency: Washington County Water Conservancy District
Type of Government: State & Local
Category:
  • 56 - Construction and Building Materials
  • J - Maintenance, Repair, and Rebuilding of Equipment
Publication URL: To access bid details, please log in.
Public Notice - Pre-Solicitation Conference Materials-June 2025-- Available Online

Pre-Solicitation Conference June 24, 2025 – Materials

The Washington County Water Conservancy District (district) conducted a  pre-solicitation conference for design engineering for the Regional Reuse Purification System (system) conveyance components (project) on Tuesday, June 24, 2025.  Materials from the conference are now available online.

The conference included a presentation on the project and multiple-award procurement process with an opportunity for questions and answers. Project information and scope are below.

Any questions regarding the materials available for download please contact Dinah Neumann at dinah@wcwcd.gov .

Project Information:

The system is a planned infrastructure network comprised of reclamation facilities, advanced water purification technology, conveyance infrastructure, and storage facilities. The district will be issuing a multiple-award procurement to solicit statements of qualifications for the design engineering of the conveyance components of the system.

Project Scope:

  • Approximately 37 miles of 48” welded steel pipeline
  • Three pump stations
  • Two storage facilities
Project Information
Project Type Public Notice - Pre-Solicitation Conference Materials--June 2025- Available Online
Project Manager
Dinah Neumann (Dinah@wcwcd.gov) Send Email
Project Description

Pre-Solicitation Conference June 24, 2025 – Materials

The Washington County Water Conservancy District (district) conducted a  pre-solicitation conference for design engineering for the Regional Reuse Purification System (system) conveyance components (project) on Tuesday, June 24, 2025.  Materials from the conference are now available online.

The conference included a presentation on the project and multiple-award procurement process with an opportunity for questions and answers. Project information and scope are below.

Any questions regarding the materials available for download please contact Dinah Neumann at dinah@wcwcd.gov .

Project Information:

The system is a planned infrastructure network comprised of reclamation facilities, advanced water purification technology, conveyance infrastructure, and storage facilities. The district will be issuing a multiple-award procurement to solicit statements of qualifications for the design engineering of the conveyance components of the system.

Project Scope:

  • Approximately 37 miles of 48” welded steel pipeline
  • Three pump stations
  • Two storage facilities
Consultant(s) Dinah F Neumann
Open June 27, 2025
Close December 31, 2025 12:00 am
Vendor(s) n/a

Attachment Preview

Pre-Solicitation Conference Materials
The Washington County Water Conservancy District (district) conducted a pre-solicitation
conference for design engineering for the Regional Reuse Purification System (system)
conveyance components (project) on Tuesday, June 24, 2025.
Materials from the conference are now available online for this announcement at
https://www.wcwcd.gov/procurement/ .
The conference included a presentation on the project and multiple-award procurement
process with an opportunity for questions and answers. Project information and scope
are below.
Any questions regarding the materials available for download please contact Dinah
Neumann at dinah@wcwcd.gov .
Project Information:
The system is a planned infrastructure network comprised of reclamation facilities,
advanced water purification technology, conveyance infrastructure, and storage facilities.
The district will be issuing a multiple-award procurement to solicit statements of
qualifications for the design engineering of the conveyance components of the system.
Project Scope:
Approximately 37 miles of 48” welded steel pipeline
Three pump stations
Two storage facilities
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.