Canadian Air and Precipitation Monitoring Network (CAPMoN) Chapais, QC

Location: Federal
Posted: Dec 5, 2024
Due: Jan 2, 2025
Agency: Government of Canada
Type of Government: State & Local
Category:
  • R - Professional, Administrative and Management Support Services
Solicitation No: 5000082780
Publication URL: To access bid details, please log in.

Description

1.        Objective

Environment and Climate Change Canada (ECCC) requires a Contractor for weekly technical support (1 day per week, 52 weeks per year) at the Canadian Air and Precipitation Monitoring Network (CAPMoN) Chapais site located in Quebec with coordinates N 49.822361° latitude, W 74.975472° longitude.

2.        Background

Environment and Climate Change Canada operates an environmental research and monitoring station in the area which forms part of Environment and Climate Change Canada’s national network of CAPMoN stations. The primary focus of this monitoring station is the weekly collection of precipitation and/or air samples. Environmental data is collected from both automatic and manual samplers. A contract operator is required to attend to the station to retrieve and process the samples according to the CAPMoN Standard Operating Procedures (SOP's). The samples are then packaged and shipped for analysis to the CAPMoN National Laboratory located in Toronto, Ontario. Other daily duties include reading and recording of various gauges, diagnostics, and regular servicing, troubleshooting, and minor repair of a variety of monitoring equipment. On-site training will be provided by Environment and Climate Change Canada (ECCC) technical staff.

3.         Details of Work to be Performed

The instructions outlined in the statement of work for this contract is of a general nature. All sampling, shipping, and maintenance must be performed in accordance with the Site Operations Reference Manuals; and in accordance with any amendments to the aforementioned manuals. The routine may involve additional collectors, passive samplers and various climatological and meteorological instruments. ECCC will provide the Contractor the aforementioned manuals and amendments.

4.        Tasks and Deliverables

Firm Requirement:

1.         The Contractor will be responsible for servicing:

a.        Precipitation Collector

b.        Air Filter Sampling System

c.        Ozone Sampling System

d.        AEROCAN CIMEL Instrument

Refer to Appendix A of Annex A.

2.        The Contractor must package and ship by courier to the designated Laboratory as outlined in Appendix A to Annex A. The Contractor will be supplied with preprinted manifests and must ensure the samples are delivered to or picked up by the designated courier. Sample containers will be sent to the Contractor by the most economical means and may need to be picked up at the nearest Canada Post office. The Contractor is not responsible for shipping expenses.

3.        First level maintenance, diagnosis of problems, and minor repairs to equipment is often required of the Contractor. This may include, but is not limited to:

•        Cleaning of equipment

•        Replacement of Defective parts

•        Resetting or rebooting electronic systems

•        Replacement and setup of operational unit with backup unit

•        Checking and readjustment of various parts or software parameters as needed.

The Contractor is responsible for the physical shipping and receiving of replacement equipment as required. The Contractor is not responsible for shipping expenses.

4.        The Contractor is responsible for routine site maintenance including keeping the sample hut clean, clearing the snow off the sampling hut stairs and deck, and grass cutting to keep the vegetation within the fenced or designated compound area at an acceptable height. The general cleanliness of the immediate sampling location is the responsibility of the contractor, including the removal of garbage/waste from the site.

These tasks must be carried out in proximity of sensitive and expensive research and monitoring equipment and it is essential that the Contractor understand the need to avoid adverse effects on the measurements and data.

Show more description Show less description
Contract duration

The estimated contract period will be 33 month(s), with a proposed start date of 2025/04/01.

Trade agreements
  • No trade agreements are applicable to this solicitation process
Reason for limited tendering

A contracting officer can use limited tendering for specific reasons outlined in the applicable trade agreements. The reason for this contract is described below:

  • None
Partner with another business

The functionality to add your company name to the list of interested businesses is temporarily unavailable.

This list does not replace or affect the tendering procedures for this procurement process. Businesses are still required to respond to bid solicitations, and to compete based on the set criteria. For more information please read the Terms of use .

Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.