| Location: | South Carolina |
|---|---|
| Posted: | May 12, 2026 |
| Due: | May 27, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
SPECIAL NOTICE: The U.S. Army Corps of Engineers (USACE) Louisville District intends to solicit proposals for the constructing of an Aeromedical Evacuation Squadron (AES) Training Building at Joint Base Charleston, SC. As part of the contract solicitation, the Government intends to include the following sole source requirements:
Interior Finishes: The contract solicitation will include a brand name or equal requirement for finishes, such as paint, carpeting, and window coverings to complete or enhance the aesthetic experience of interior and exterior parts of a building. These finishes include colors, patterns, textures and textile designs.
HVAC: The contract solicitation will include a sole-source brand requirement for Trane Heating, Ventilation, and Air Conditioning (HVAC) equipment in the construction of new facilities at Joint Base Charleston. The agency head has determined in accordance with the agency’s standardization program that only specified makes and models of technical equipment and parts will satisfy the agency’s needs for additional units or replacement items.
Fire Alarm Panel/Transmitter: The contract solicitation will include a sole-source brand requirement for Monaco BT-XM radio transmitter which is the only transmitter that will communicate with the systems at JB Charleston and is the only transmitter that is compatible with the current JB Charleston infrastructure.

With GovernmentContracts, you can:
...Project Name: Design & Build Services Hangers W & Y at Downtown Airport ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...Delivery Method: Design-Bid-Build Agency Project Coordinator: BLAKE BARBARE Email: BLAKE.BARBARE... of an engineering ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/17/2026
...School District One Anticipated Project Delivery Method: Design-Bid-Build Agency Project Coordinator... term Indefinite ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/07/2026