| Location: | Alaska |
|---|---|
| Posted: | Jul 17, 2025 |
| Due: | Jul 22, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA500425Q0043 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Amendment 0001 - Amendment 0001 has been issued to:
Please see Attachments 1-4 for relevant documentation to the Amendment.
_________________________________________________________________________
Eielson Air Force Base, Alaska is issuing a solicitation for Hydro Axe Services.
Description of Services: Contractor to furnish all labor, transportation, materials, engineering and equipment to perform brush and tree clearing services on Eielson AFB to include services at Birch Lake Military Recreation Camp.
Eielson AFB and Birch Lake has approximately 25 acres, not to exceed 50 acres of power line and pipeline, right of ways, that require hydro axed to prevent trees from coming into contact with the high voltage overhead power lines and to keep power line right of ways clear for maintenance purposes. Additionally, maintenance access needs to be made to conduct maintenance and repairs to the JP8 pipeline fueling systems supplying fuel to the flying missions. These rights of ways need to be hydro axed to an overall width of 60ft, 30ft on each side of the pole or pipeline, with the exception of Birch Lake Military Recreation Camp. That area will be 20 feet on each side of the lines. These sections around Eielson, which will be included in the map section, are around power lines or future power lines and pipelines that require hydro-axing. The total area for the service is approximately 25 acres, not to exceed 50 acres between the two locations. See attachment, Maps, for required land coverage.
Period of Performance: 1 August 2025 – 30 September 2025
Site Visit: A site visit will be conducted on 14 July 2025. Contractors should report to the CE Maintenance Shops building parking lot located at Bldg. 2351, Central Avenue, Eielson AFB, AK at 09:00 AM (AKST). The Point of Contact for the site visit is listed as follows:
Name: Vanessa Gray
Email: vanessa.gray.3@us.af.mil
Phone: 3166650811
Request for Information: All Requests for Information from interested parties must be submitted formally no later than 16 July 2025 at 11:00 AM (AKST) via email to james.cameron.15@us.af.mil and vanessa.gray.3@us.af.mil. They will be answered via an amendment to the solicitation.
Proposal Due Date: 22 July 2025 at 11:00 AM (AKST) via email to james.cameron.15@us.af.mil and vanessa.gray.3@us.af.mil.
| Jun 30, 2025 | [Solicitation (Original)] Hydro Axe Removal Services |
| Jul 18, 2025 | [Solicitation (Updated)] Hydro Axe Removal Services |

With GovernmentContracts, you can: