| Location: | California |
|---|---|
| Posted: | Jan 21, 2025 |
| Due: | Feb 25, 2025 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 906033.01 |
| Publication URL: | To access bid details, please log in. |
| Project Name | Northwest Auditorium HVAC Replacement |
| Project Number | 906033.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract are invited for the following work:
This project includes replacing the existing rooftop mechanical unit as well as minor scope associated with the unit replacement. The associated scope includes: • Temporary removal and re-installation of (E) sound attenuation baffle and associated steel framing. • Replacement of (E) vision screen panels with (E) louver panels on (E) steel framing. • Modification of (E) electrical components to accommodate new unit. • Repairs to roof and wall finishes as needed. • Cleaning of (E) ducts to remain throughout building. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| 906024.01 |

With GovernmentContracts, you can:
...Project ID: Title: REPAIR AND MAINTENANCE OF MOVABLE WALLS AT THE ANAHEIM CONVENTION ...
City of Anaheim
Bid Due: 9/29/2026
...designated exterior surfaces, including wood sidings, masonry/stucco/concrete/ CMU wall surfaces, Ramps.... All participants ...
West Contra Costa Unified School District
Bid Due: 10/05/2026
.../concrete/ CMU wall surfaces, Ramps, Roof Fascia, Gutter, Downspout, piping, Conduits, windows, doors... ...
West Contra Costa Unified School District
Bid Due: 10/05/2026
...equipment installation onto existing structure, wall finish and ceiling finish, patch and repair ...
UCLA Capital Programs
Bid Due: 9/29/2026