| Location: | Texas |
|---|---|
| Posted: | Oct 22, 2025 |
| Due: | Oct 27, 2025 |
| Agency: | Guadalupe-Blanco River Authority (GBRA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
This Request for Proposal (“RFP”) is soliciting contractors for installation of approximately 4 miles of 30 IN diameter ductile iron pipe in both 200 and 250 psi pressure classes within Guadalupe-Blanco River Authority (GBRA)’s obtained easements along SH 46, crossing multiple private properties and public roads, and the removal of existing 30 IN waterline where denoted on plans. Work also includes installation of gate valves, blow-off valves, and combination valves. Fences and gates will be removed/demolished as part of the pipe installation and will be rebuild/replaced as specified/detailed. Bores under roadways and open cut trenches through private drives (of various types) will be required. The work includes providing all necessary traffic control, trench safety, permits, erosion control with SWPPP, corrosion test stations, site restoration and all other work included in the contract documents.

With GovernmentContracts, you can:
...-inch PVC water pipe 561 LF 8-inch DIP water pipe 706 LF 16-inch ...
City of Fort Worth
Bid Due: 7/02/2026