| Location: | Texas |
|---|---|
| Posted: | Oct 22, 2025 |
| Due: | Oct 27, 2025 |
| Agency: | Guadalupe-Blanco River Authority (GBRA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
This Request for Proposal (“RFP”) is soliciting contractors for installation of approximately 4 miles of 30 IN diameter ductile iron pipe in both 200 and 250 psi pressure classes within Guadalupe-Blanco River Authority (GBRA)’s obtained easements along SH 46, crossing multiple private properties and public roads, and the removal of existing 30 IN waterline where denoted on plans. Work also includes installation of gate valves, blow-off valves, and combination valves. Fences and gates will be removed/demolished as part of the pipe installation and will be rebuild/replaced as specified/detailed. Bores under roadways and open cut trenches through private drives (of various types) will be required. The work includes providing all necessary traffic control, trench safety, permits, erosion control with SWPPP, corrosion test stations, site restoration and all other work included in the contract documents.

With GovernmentContracts, you can:
...Project: PW - CPN 100997-1 - Sanitary Sewer M-245 Parallel Relief Pipeline Part ...
City of Fort Worth
Bid Due: 7/16/2026
...Engineering Design Services for WMP Project #4 24-inch Water Pipeline along State Highway ...
City of Irving
Bid Due: 6/12/2026
...residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable...
City of Dallas
Bid Due: 7/10/2026
...Invitation To Bid Operations- Pipeline 00500 , 01000 , 03105 , 03114 , ...
Tarrant Regional Water District
Bid Due: 6/12/2026