Network Switching Hardware

Location: Connecticut
Posted: Jan 5, 2026
Due: Feb 5, 2026
Agency: Town of Mansfield
Type of Government: State & Local
Category:
  • 70 - General Purpose Information Technology Equipment (including software).
Publication URL: To access bid details, please log in.
Bid Title: Network Switching Hardware
Category: Information Technology
Status: Open
Description:

The Mansfield Public Schools has a RFP opportunity for HPE Aruba Network Switch Infrastructure Hardware to meet the requirements of student and staff usage in support of learning and teaching.

Publication Date/Time:
1/5/2026 8:00 AM
Closing Date/Time:
2/5/2026 8:00 AM
Related Documents:

Attachment Preview

MANSFIELD PUBLIC SCHOOL DISTRICT
REQUEST FOR QUOTE (RFP)
NETWORK SWITCHING HARDWARE
January 2026
SUBMISSION/CONTACT ADDRESS
Mansfield Public School District
Attention: Information Technology Department
Submissions will be accepted in electronic format.
Please include the word “RFP” in the email subject line.
Deadline: February 5, 2026, by 8:00AM
Summary
Mansfield has a RFP opportunity for HPE Aruba Network Switch Infrastructure Hardware to meet the
requirements of student and staff usage in support of learning and teaching. For this purchase, Mansfield
will be seeking USF E-Rate funds.
Background
The Mansfield Public Schools are in Mansfield (Connecticut) and are the local grades pK – 8 School
District.
Core Specifications
Mansfield is seeking quotes for new Hewlett-Packard (HP) / Aruba network switch equipment and
other related connectivity supplies. Please see the table below for specifics. Installation and pre-
configuration services are not requested.
Quantity Part Number Description
7
S3L76A
HPE Aruba 6300L 48-Port Smart Rate Layer 2 Switch
7
JL087A
HPE Aruba X372 - power supply - 1050 Watt
We do not anticipate that we will need to adjust the quantity, but if we do, it will not be a
large adjustment.
While the models above are highly preferred, vendors may optionally propose an alternative
brand and/or model of their choosing, which will be given due consideration. Mansfield
understands that it may need to go with an equivalent model that is different from the one
listed above if a different model is more competitive while still meeting the same
requirements and specifications.
The above specifications do not include installation labor. Mansfield staff will complete the
physical installation of the equipment.
Shipping and Delivery:
The equipment requested above will be delivered to 205 Spring Hill Rd, Storrs-Mansfield, CT
06268.
Proposal Submission Requirements
1. If there are any additional costs for shipping or otherwise, it should be listed on the
quote as a shipping and/or handling charge.
2. Quotes will be accepted in electronic format only. Vendors may use a format of their
own choosing for the quote. Questions about the process should be directed to the
email address and name on this RFP document (see the beginning of this document).
3. The vendor is responsible for submitting a quote for consideration in a timely
manner with a desired deadline of February 5, 2026, by 8:00AM.
Selection Process
Pricing is the driving factor in the selection process; however, it is not the only factor, as
Mansfield will consider the vendor’s ability to fulfill this product request. Mansfield reserves the
right to reject submissions, to select an applicant in a manner that is advantageous to Mansfield,
and to waive formalities in the bidding. Mansfield reserves the right to request additional
information from vendors. Mansfield reserves the right to potentially modify the above quantities
depending on pricing and available funding.
Mansfield does not expressly state or imply any obligation to reimburse responding applicants for
any expenses incurred in preparing submissions in response to this request. The selected firm is
expected to meet any relevant state and federal legal requirements. Mansfield is an equal
opportunity employer.
Mansfield applies for USF eRate Funding as part of budgeting for this expense (Form 470 is
available via USF eRate) and will take advantage of USF eRate funding towards this item.
Questions about the proposal process should be directed to
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Request for Information (RFI) for Learning Management System Access Health CT is issuing... ...

State Government of Connecticut

Bid Due: 6/12/2026

...RFP: 132 Nita M. Lowey 21st Century Community Learning Centers Request for Proposals ...

State Government of Connecticut

Bid Due: 7/08/2026

..., and professional learning opportunities for district leaders and educators. These resources must...

State Government of Connecticut

Bid Due: 6/17/2026

...; genetic information; learning disability; physical disability (including, but not limited to, blindness...

State Government of Connecticut

Bid Due: 7/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.