| Location: | Georgia |
|---|---|
| Posted: | Sep 29, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912HN25CA018 |
| Publication URL: | To access bid details, please log in. |
THIS PROCUREMENT IS AN 8 (A) DIRECT MATCH WITH INTEGRIWARD LLC
Repairs to Butler Dam - Project breakdown/Overview as follows:
Operate the low-level outlet works.
Remove vegetation (trees, brush, plants) from left and right embankments, auxiliary spillway concrete, emergency spillway (including the stone/rock fuse plug), stilling basin and downstream of the basin in accordance with FEMA guidelines.
Reconstruct stilling basin berm so that it has a uniform shape, supports vehicle traffic to reach the other side of the dam and has a dedicated outlet structure.
Remove stone/rock and debris that was deposited downstream (including the woods) south of the stilling basin.
Project requirements shall include validating project scoping requirements such as topographical survey, geotechnical exploration, and hydrologic and hydraulic studies to define existing conditions and determine any upgrade and/or improvement needed to be made. Prepare design and construction for the channel and storm water network repair/improvements to properly convey the flow.

With GovernmentContracts, you can:
...firms to assess, design, implement, document, monitor, and support a reliable backup and ...
State Government of Georgia
Bid Due: 10/01/2026
...Engineering Design Services GDOT PI#0021595 PTC 25-08 SR 141 Sidewalks TAP Peachtree Corners, ...
State Government of Georgia
Bid Due: 10/09/2026
...of Peachtree Corners Request for Qualifications To Provide Engineering Design Services GDOT PI# ...
City of Peachtree Corners
Bid Due: 10/09/2026