| Location: | Connecticut |
|---|---|
| Posted: | Nov 6, 2024 |
| Due: | Nov 20, 2024 |
| Agency: | Town of Manchester |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 24/25-28 |
| Publication URL: | To access bid details, please log in. |
Project ID: 24/25-28
Title: GLOBE HOLLOW WTP TEMPORARY FINISHED WATER HEADER BYPASS
Addenda: 2
Release Date: 10/21/2024
Due Date: 11/20/2024
Work of the Contract is shown and described in Project Manual entitled: Town of Manchester Globe Hollow Water Treatment Plant Temporary Finished Water Header September 2024
The existing finished water header receives water from three water treatment plant pumps and conveys water down into a pipe gallery within the plant, then underground to a 24” ductile iron pipe that feeds the Town’s water service area. The portion of the header in the pipe gallery needs repair (to be done by Others). To make the repairs, the header must be taken out of service, drained and repaired. The scope of this project is to provide a temporary water header so that the water treatment plant can remain online providing water to the Town’s customers.

With GovernmentContracts, you can:
...Prequalification: E Building Heat Pipe Replacement UConn Health (UCH) will be replacing existing...
State Government of Connecticut
Bid Due: 11/17/2026
...Utility (WPCU) is seeking competitive bids from qualified Contractors to provide sewer pipe... ...
State Government of Connecticut
Bid Due: 11/04/2026
...from qualified Contractors to provide sewer pipe cleaning, Closed Circuit Television (CCTV), CIPP... ...
Town of Fairfield
Bid Due: 11/04/2026
...of its tributaries are enclosed within a series of large diameter pipes and ...
Town of Manchester
Bid Due: 11/10/2026