| Location: | Virginia |
|---|---|
| Posted: | Oct 21, 2025 |
| Due: | Nov 12, 2025 |
| Agency: | State Government of Virginia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 105799 |
| Publication URL: | To access bid details, please log in. |
Virginia Department of Energy -1963 Peeled Chestnut Road Pocahontas, Virginia, 24635
Closing On: 11/12/25 2:00 PM
Time Left: 21 days
The work to be performed under the terms of this Specification consists of replacing an existing retaining wall to the rear of the Compton Residence. The removed wall will be taken to the disposal area. A trench drain will be installed and minor grading will take place so that higher flows can move through the crossings more easily. The project is known as the Compton Subsidence รข Phase II Project in Tazewell County, Virginia, for the Commonwealth of Virginia.
IFB Construction
View Opportunity
Add to Favorites
With GovernmentContracts, you can:
...Augmentation to Assist and Support Student Fall Semester Move-In IFB Non-Prof Serv Closing ...
State Government of Virginia
Bid Due: 6/11/2026
...flooring, install new carpet, and lift or remove furniture as needed. The Government ...
DEPT OF DEFENSE
Bid Due: 6/19/2026
...) and Geostationary Earth Orbit (GEO)) capabilities, suitably ruggedized for Networking On-The-Move - ...
DEPT OF DEFENSE
Bid Due: 8/01/2026
...ducting path, and floorplans. Phasing will be required to prepare new office space ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/18/2026