| Location: | Florida |
|---|---|
| Posted: | Sep 4, 2025 |
| Due: | Sep 19, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA441725Q0100 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
4 Sep 25: The pupose of this amendment is to:
1. Attach Questions and Answers
2. Attach Updated Statement of Work dated 4 Sep 2025
3. Attach Updated Addendum to 52.212-1 and 52.212-2 to fix clerical error on page one (1) Required Statements; new statment is as follows: "The Offeror must provide a statement that their proposal for the project is compliant with Attachment #7 Non-Nuclear Configuration Management Database (CMD) Equipment Approval Memorandum, dated 29 April 2024"
All other terms and conditions remain unchanged
26 Aug 25: Floor Plans from the Statement of Work have been uploaded as seperate files.
Amendment 0002 (25 Aug 25): The purpose of this amendment it to update Attachment 2 - Statement of Work (SOW). This update removes the requirement of ACS installation. Additioanlly, it expands the description of equipment in paragraph 1.3.1.
Amendment 0001 (20 Aug 25): The purpose of this amendment is to update Attachment 3 - Addendum to 52.212-1 and 52.212-2. The PSG VICADS Certification requirement was removed from the Technical Evaluation Factors of this requirement.
This is a compined synopsis/solcitation for the IDS Install for the 23rd STS and Hurlburt Field, FL.
The contractor shall install a Vindicator Intrusion detection system (IDS) and Hirsch Access Control (ACS) in building #91650/room 1238, 2024, 2014, 2031, 2027, compatible with Windows 10.
| Mar 14, 2025 | [Sources Sought (Original)] 23 STS compound IDS/ADS install |
| Aug 18, 2025 | [Combined Synopsis/Solicitation (Original)] 23rd STS IDS Installation |
| Aug 20, 2025 | [Combined Synopsis/Solicitation (Updated)] 23rd STS IDS Installation |
| Aug 25, 2025 | [Combined Synopsis/Solicitation (Updated)] 23rd STS IDS Installation |
| Aug 26, 2025 | [Combined Synopsis/Solicitation (Updated)] 23rd STS IDS Installation |

With GovernmentContracts, you can:
..., and Facility Security Level (FSL) II security systems including CCTV, intrusion detection, ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/18/2026
..., and Facility Security Level (FSL) II security systems including CCTV, intrusion detection, ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/15/2026