WHITEWATER HIGH SCHOOL RENOVATIONS 11/02/26
FAYETTE COUNTY SCHOOLS ITB 27-004-075
PBK PN 240477
PBK, P.O. BOX 880, GRIFFIN, GA 30223
ADDENDUM NUMBER FIVE: DATED: November 2, 2026
To: All prime contract bidders of record.
This addendum forms a part of the Contract Documents and modifies the original Specifications
and Drawings dated September 11, 2026, as noted below. Acknowledge receipt of this
Addendum in the space provided on the Bid Form; failure to do so may subject bidder to
disqualification.
BID DATE: November 5, 2026
SPECIFICATIONS
1. Section 087100 - DOOR HARDWARE
A. 3.7 Hardware Sets
A. Add the following door to Set #39 - INT SGL - 45H D- AFP
Door No. J16
B. Add the following doors to Set #42 - INT SGL - 45H R
Door No. B58, B60
C. Add the following door to Set #46 - INT SGL - 45H AT
Door No. B59
2. Section 113010 - APPLIANCES
A. Add the following on page 4 as Paragraph 2.5.C:
"C. Stacked Clothes Washer and Dryer CWD
1: Residential Stacked Clothes Washer and Dryer:
Manufacturer: Subject to compliance with requirements, provide selected
products by one of the following:
a. General Electric Corp.
b. Maytag
c. Whirlpool Corp.
2. Type: Freestanding, stacked washer and dryer unit, washer top loading, dryer
front loading.
3. Dimensions:
a.Width: [27] inches ([685.8] mm).
b.Depth: [30] inches ([762] mm).
c.Height: [76] inches ([1930.4] mm).
4. Washer Drum: Perforated stainless steel.
a.Capacity: 3.8 cu. ft.
Addendum No. 5 - Page 1 of 5
WHITEWATER HIGH SCHOOL RENOVATIONS 11/02/26
FAYETTE COUNTY SCHOOLS
PBK PN 240477
b. Dryer Capacity: 5.90 cu. ft.
5. Controls: Rotary-dial controls for water-fill levels, wash/rinse water temperatures,
and variable-speed and fabric selectors.
a.Wash Cycles: 11 wash cycles, including regular, delicate, and permanent
press.
b. Dryer Cycles: 4
6. Electrical Power: 120 V, 60 Hz, 1 phase, 30 A.
a.Motor: Manufacturer's standard with built-in overload protector.
7. Washer Features:
a. Agitator: Center spindle.
b. 6 wash/rinse temperatures.
8. Dryer features:
a. Long vent capability"
3. Section 116623 - GYMNASIUM EQUIPMENT
A. Delete Paragraph 2.3 and Replace with the following:
2.3 VOLLEYBALL EQUIPMENT
A. Basis-of-Design Product: Subject to compliance with requirements, provide
SportsImports; Volleyball Floorplate and Sleeve - Model KA25-FW or
comparable project.
B. General: Provide equipment complying with requirements in NFHS's "NFHS
Volleyball Rules Book."
C. Floor Insert: Solid-brass floorplate to be a brushed finish of 6 5/8" dimeter with
hinged access cover, with a 5" opening. Removable, threaded, or pin swivel
covers are unacceptable. Plate shall be .25: thick and shall be designed to be
compatible with all floor surfaces. In a wood floor, the plate shall be fastened only
to the wood floor so that it can move with any expansion or contraction of the
floor. Sleeve shall be tubular steel of .140" thickness, 8 7/8" long and 3 1/16"
internal diameter. Seamed tubing or pipe is unacceptable. Sleeve shall have
three pre-drilled flanges for attachment to the plate during the installation in
accordance with manufacturer's instructions and shall have a nitrated finish to
resist corrosion. The bottom of the sleeve shall be 10" from the floor surface.
4. Section 116833.33 - BASEBALL FIELD EQUIPMENT
A. Delete this section in its entirety and replace with section 116833.33 - BASEBALL FIELD
EQUIPMENT included within this addendum.
A. Includes revisions to specified Indoor Batting Tunnel System.
5. Section 133419 - METAL BUILDING SYSTEMS
A. Page 7, Paragraph 2.4.G;
A. Delete Paragraph 2.4.G in its entirety and replace with the following:
"2.4.G. Bracing: Provide adjustable wind bracing as follows:
1. Rigid Portal Frames: Fabricated from shop-welded, built-up steel
plates or structural-steel shapes to match primary framing; of size
required to withstand design loads.
Addendum No. 5 - Page 2 of 5
WHITEWATER HIGH SCHOOL RENOVATIONS 11/02/26
FAYETTE COUNTY SCHOOLS
PBK PN 240477
2. Pinned-Base Columns: Fabricated from shop-welded, built-up steel
plates or structural-steel shapes to match primary framing; of size
required to withstand design loads.
3. Diaphragm Action of Metal Panels: Design metal building to resist wind
forces through diaphragm action of metal panels."
B. Page 8, Paragraph 2.5 - Metal Roof Panels, Section A, Subsection 1.
A. Delete line 2.5.A.1. - "Material: Zinc-coated (galvanized) or aluminum-zinc alloy-
coated steel sheet, 0.030-inch (0.76-mm) nominal uncoated steel thickness.
Prepainted by the coil-coating process to comply with ASTM A 755/A 755M."
Revise to Read ""Material: Zinc-coated (galvanized) or aluminum-zinc alloy-
coated steel sheet, 0.024-inch (0.61-mm) nominal uncoated steel thickness.
Prepainted by the coil-coating process to comply with ASTM A 755/A 755M."
6. Section 260500 - COMMON WORK RESULTS FOR COMMUNICATIONS
A. On Page 3, add the following as paragraph 1.2.18:
"18. Section 265560 - Auditorium Lighting and Rigging
a. Product Data
b. Shop Drawings
c. Equipment List
d. Qualification Data
e. Warranties"
7. Section 265560 - AUDITORIUM LIGHTING AND RIGGING
A. Add Section 265560 - AUDITORIUM LIGHTING AND RIGGING included within this
addendum.
DRAWINGS
STRUCTURAL
1. SHEET S-201 - BATTING FACILITY FOUNDATION PLAN AND DETAILS
A. Delete Sheet S-201 in its entirety and replace with sheet S-201, included in this
addendum.
ARCHITECTURAL
1. SHEET A-101B - FLOOR PLAN - SECTOR B
A. Detail No.1 - LEVEL 1 - AREA B FLOOR PLAN; See revisions to detail on SDA-
101B included in this addendum.
1. Revisions include the addition of missing door numbers and tags.
Addendum No. 5 - Page 3 of 5
WHITEWATER HIGH SCHOOL RENOVATIONS 11/02/26
FAYETTE COUNTY SCHOOLS
PBK PN 240477
2. SHEET A-101J - FLOOR PLAN - SECTOR J
A. Space: Jan 506.1
1. Add door Tag on door opening out from Jan 506.1 to be labeled "J16"
3. SHEET A-405 - ENLARGED TOILET PLANS
A. Detail No.12 - ENLARGED TOILET PLAN SECTOR J; See revisions to detail on
SDA-405 included in this addendum.
B. Detail No.13 - ENLARGED TOILET PLAN SECTOR J; See revisions to detail on
SDA-405 included in this addendum.
4. SHEET A-502AA - BATTING FACILITY EXTERIOR ELEVATIONS & ROOF PLAN
A. General Elevation Notes; Delete Note No. 14 in its entirety.
5. SHEET A-810 - DOOR SCHEDULE
A. Door Number J12; Door Type; "HG-1" Revise to Read "FGIR"
B. Add the Following Doors and Information pertaining to each:
1. Door No. B58; SNGL or PAIR; SNGL, Space Name: STORAGE, Door
Size: 3'-0"x7'-0", Door Type: F, Door Material: WD
2. Door No. B59; SNGL or PAIR: SNGL, Space Name: OFFICE. Door
Size: 3'-0"x7'-0", Door Type: HG-1, Door Material: WD
3. Door No. B60; SNGL or PAIR: SNGL, Space Name: STORAGE, Door
Size: 3'-0"x7'-0", Door Type: F, Door Material: WD
4. Door No. J16; SNGL or PAIR: SNGL, Space Name: JANITOR, Door
Size: 3'-0"x7'-0", Door Type F, Door Material: WD
6. SHEET A-812 - SIGN SCHEDULE AND DETAILS
A. Add the Following Signs and information pertaining to each:
1. Door No, B58, To Room: Storage, To Room Number: 703.3, Sign
Type: C, Line Text 2: STORAGE
2. Door No. B59, To Room: Office, To Room Number:703.1, Sign Type
A, Line Text 2: OFFICE
3. Door No. B60, To Room: Storage, To Room Number: 703.2, Sign
Type: C, Line Text 2: STORAGE
4. Door No. J16, To Room: Cust, To Room Number: 506.1, Sign Type:
C, Line Text 2: JANITOR
Addendum No. 5 - Page 4 of 5
WHITEWATER HIGH SCHOOL RENOVATIONS 11/02/26
FAYETTE COUNTY SCHOOLS
PBK PN 240477
7. SHEET A-902 - FINISH FLOOR PLAN - ALTERNATE NO.1
A. Detail No.1 - LEVEL 1 - FINISH FLOOR PLAN
1. Change the following area to be PC - Polished Concrete
1. 719.12 - Dish Return
8. SHEET A-931 - INTERIOR ELEVATIONS
A. Detail No.1 - AUDITORIUM - INTERIOR ELEVATION
1. Delete Detail Title. Revise to Read BAND 513 - INTERIOR
ELEVATION]
B. Detail No.2 - AUDITORIUM - INTERIOR ELEVATION
1. Delete Detail Title. Revise to Read BAND 513 - INTERIOR
ELEVATION
C. Detail No.3 - AUDITORIUM - INTERIOR ELEVATION
1. Delete Detail Title. Revise to Read BAND 513 - INTERIOR
ELEVATION
D. Detail No.4 - AUDITORIUM - INTERIOR ELEVATION
1. Delete Detail Title. Revise to Read BAND 513 - INTERIOR
ELEVATION]
ELECTRICAL
9. SHEET ED101 - OVERALL ELECTRICAL DEMOLITION PLAN
A. Delete Sheet ED101 in its entirety and replace with Sheet ED101, included in this
addendum.
10. SHEET E-201J - ELECTRICAL POWER LEVEL 1 - AREA J FLOOR PLAN
A. Delete Sheet E-201J in its entirety and replace with Sheet E-201J, included in
this addendum.
11. SHEET E-502 - ELECTRICAL STAGE LIGHTING RISE DIAGRAM
A. Delete Sheet E-502 in its entirety and replace with Sheet E-502, included in this
addendum.
Addendum No. 5 - Page 5 of 5
PBKArchitectsGeorgia,P.C. WhitewaterHighSchool-Renovations
PBKProjectNo.240477 FayetteCountySchools
AddendumNo.5 2026-11-02
SECTION116833.33-BASEBALLFIELDEQUIPMENT
PART1GENERAL
1.1 SUMMARY
A. Provideallequipmentandmaterials,anddoallworknecessarytofurnishandinstalltheathletic
equipment,asindicatedonthedrawingsandasspecifiedherein.Athleticequipmentshall
include,butnotbelimitedto:
1. BTIPND-IndoorBattingTunnel;PerimeterNettingwithDivider(s)
1.2 RELATEDWORK
A. Examinecontractdocumentsforrequirementsthataffectworkofthissection.Other
specificationdivisionsandsectionsthatdirectlyrelatetotheworkofthissectioninclude,but
arenotlimitedto:
1. 061600-Sheathing
2. 133419-MetalBuildingSystems
3. 260000-Electrical
1.3 SUBMITTALS
A. ManufacturersProductData
1. Providemanufacturersproductdatapriortoactualfieldinstallationwork,forArchitect's
review.
B. ShopDrawings
1. Providedrawingsofthemanufacturersrecommendedinstallationrequirementspriorto
actualfieldinstallationwork,forArchitect'sreview.
1.4 QUALITYASSURANCE
A. Manufacturer'swarrantiesshallpasstotheOwnerandcertificationmadethattheproduct
materialsmeetallapplicablegradetrademarksorconformtoindustrystandardsandinspection
requirements.
1.5 PRODUCTDELIVERYANDSTORAGE
A. Materialsdeliveredtothesiteshallbeexaminedfordamageordefectsinshipping.Anydefects
shallbenotedandreported.Replacements,ifnecessary,shallbeimmediatelyre-ordered,so
astominimizeanyconflictwiththeconstructionschedule.Soundmaterialsshallbestored
abovegroundunderprotectivecoverorindoorssoastoprovideproperprotection.
PART2PRODUCTS
2.1 BTITB-INDOORTENSIONBATTINGTUNNEL;BASEBALL
A. Basis-of-Design:Subjecttocompliancewithrequirements,provideBTIPND-IndoorBatting
Tunnel;PerimeterNettingwithDivider(s)asManufacturedandSuppliedby::Sportsfield
Specialties,Inc.orcomparableproductapprovedbyArchitect.
1. SportsfieldSpecialties,Inc.
2. P.O.Box231
3. 41155StateHighway10
4. Delhi,NY13753
5. p.888-975-3343
6. www.sportsfield.com
2.2 COMPONENTS:
A. IndoorBattingTunnel;PerimeterNettingwithDivider(s):
1. Project-SpecificBuildingConnections
a. WallMountsorCeilingDrop-DownExtensionArmsProvidedasRequired
b. SuperDurablePowderCoatedFinish(VariousColorsAvailable)
c. Note:MainBuildingSupportStructurebyOthers
116833.33- BaseballFieldEquipment
1
PBKArchitectsGeorgia,P.C. WhitewaterHighSchool-Renovations
PBKProjectNo.240477 FayetteCountySchools
AddendumNo.5 2026-11-02
2. TensionCableSupportStructure
a. GalvanizedAircraftCableandHardwareAssemblySizedasRequired
b. (2)StackedCablesatDividerLocationsOnlytoAllowforHorizontalRetractability
c. 3/16"StainlessSteelSpringClipAttachmentevery12"o.c.
3. BattingTunnelNet
a. FixedPerimeterandCeilingNetting:SizeasRequiredbyDrawings
1) #60BlackNylon1-7/8"SquareMeshNet
2) #60TwistedKnottedNetting
3) 100%NylonConstruction
4) 2.95mm(0.116")DiameterTwine
5) 84%OpenMeshArea(See-ThroughVisibility)
6) 560lb.MinimumBreakingStrength
7) 1-7/8"(48mm)MaximumSquareMeshSize
8) 0.067lbs.perSquareFoot
9) BlackMulti-FilamentPolypropyleneSolidBraidDerbyRopeSewnBindingon
PerimeterEdges-14"Diameter,530lb.MinimumBreakingStrength
10) UVandWeatherTreated
b. DividerNettingPanel(s):QuantityandSizeasRequiredbyDrawings
1) 1'ofExcessNetatBottomtoReduceDeflection
2) #36BlackNylon1-3/4"SquareMeshNet
3) #36TwistedKnottedNetting
4) 100%NylonConstruction
5) 2.6mm(0.1023")DiameterTwine
6) 87%OpenMeshArea(See-ThroughVisibility)
7) 13,363psiMinimumBreakingStrength
8) 1-3/4"(44mm)MaximumSquareMeshSize
9) 0.0425lbs.perSquareFoot
10) BlackMulti-FilamentPolypropyleneSolidBraidDerbyRopeSewnBindingon
PerimeterEdges-14"Diameter,530lb.MinimumBreakingStrength
11) UVandWeatherTreated
c. (4)4'WxFullHeightOpeningswithCurtainStyleExteriorOverlapFlaps
4. Accessories:
1) WeightedRopeBottomDeadweights
2) Factory-Sewn/IntegratedintoBattingTunnel
3) SamsonRopeDuraOceanmasterWeightedRope(R)
(a) Flexible/EasytoHandle
(b) SurfaceYarnsonCoverDesignedtoLashtoNetting
(c) 2,000lbs.AverageStrength
(d) 250lbs.per100FathomsMaterialWeight(0.42lbs/ft)
4) 2'High#60BlackNylon1-7/8"SquareMeshNettingBafflestoPreventBall
Pass-Through
PART3EXECUTION
3.1 INSTALLATIONOFEQUIPMENT
A. AllIndoorTensionBattingTunnelsshallbeinstalledasrecommendedpermanufacturer's
writteninstructionsandasindicatedonthedrawings.Concreteanchoringfoundationstobe
determinedbyothersbasedonlocalsoilconditionsandbuildingcodes.Installershouldhavea
minimumoffive(5)baseball/softballequipmentinstallationsorsimilarexperienceinthe
previousthree(3)years.
ENDOFSECTION
116833.33- BaseballFieldEquipment
2
| AH&P / PBK Architects Georgia, P. C. | Whitewater High School - Renovations |
|---|---|
| PBK Project No. 240477 | Fayette County Schools |
| Addendum No. 5 | 2026-10-30 |
AH&P / PBK Architects Georgia, P. C. Whitewater High School - Renovations
PBK Project No. 240477 Fayette County Schools
Addendum No. 5 2026-10-30
SECTION 265560 - AUDITORIUM LIGHTING AND RIGGING
PART 1 GENERAL
1.1 GENERAL REQUIREMENTS
A. Work of this Section, as shown or specified, shall be in accordance with the requirements of
Division 1 and Division 00 Specifications and the Contract Documents and Owner provided
General Conditions. In all cases the most stringent and/or specific requirement shall prevail.
B. Provide labor, materials, and equipment for the installation of networked lighting control
system(s) as shown on the drawings and specified herein, including delivery F.O.B. job site.
C. Refer to drawings for dimensions and details. Check and verify dimensions and details on
drawings before proceeding with the work. Report any discrepancies at once to the Lighting
Designer. Should it appear that the work intended is not sufficiently detailed or explained on
the drawings or in the specifications, apply to the Lighting Designer for further drawings or
explanations, as may be necessary. Conform to these explanations in the work. If any
question arises about the true meaning of the drawings or specifications, refer the matter to the
Lighting Designer whose decision is final and conclusive. In no case submit a bid or proceed
on any work with uncertainty.
D. The intention of this specification, the related drawings, and schedules is to enable the
Contractor to provide a job complete in every respect. However, any risers or schematics
which are included are for explanation of system intent only. It is the responsibility of the
Contractor to verify the required components and their interconnections. Any engineering
questions should be directed to the project's Electrical Engineer of record for
resolution. Contractor is responsible for this result and for supplying a complete, integrated,
and working system.
E. The installing Electrical Contractor shall be responsible for installation of the equipment
furnished under this section and for coordinating its work with the work of the Lighting Systems
Integrator. The equipment of this Section shall be furnished by a qualified Lighting Systems
Integrator as a direct subcontractor to the installing Electrical Contractor.
1.2 DEFINITIONS
A. In this specification, the term "Lighting Designer" includes the Lighting Designer, Owner's
representative and/or the Lighting Consultant, together or individually as they shall decide.
B. The term "Owner" and "Architect" as used herein refer to the organization(s), individuals and
their representatives as typically defined.
C. "Lighting Control System" refers to dimming and/ or relay equipment, control panels, control
stations, and associated software.
D. The term "Contractor", "Electrical Contractor", or "installing Electrical Contractor" as used
variously herein refer to the company, organization, individuals and their representatives who
shall:
1. Install the networked power and lighting control equipment.
2. Provide the conduit, wire, back boxes and installation labor to complete the Lighting
Control System.
a. For this document low-voltage (control) cable is defined as cable carrying 48VDC or
less for the purposes of providing signal level information to devices or fixtures.
E. The term "Lighting Systems Integrator", hereafter referred to as LSI, as used herein refers to
the company, organization, individuals, and their representatives who shall:
1. Furnish the power and lighting control equipment as specified.
2. Furnish the low voltage control wire for installation by the electrical contractor.
3. Provide supervision of the system installation, low-voltage (control) cable termination,
system startup, and initial system programming as described in the specifications.
265560 - Auditorium Lighting And Rigging
1
| AH&P / PBK Architects Georgia, P. C. | Whitewater High School - Renovations |
|---|---|
| PBK Project No. 240477 | Fayette County Schools |
| Addendum No. 5 | 2026-10-30 |
AH&P / PBK Architects Georgia, P. C. Whitewater High School - Renovations
PBK Project No. 240477 Fayette County Schools
Addendum No. 5 2026-10-30
4. Employ full time Systems Integrators, Project Managers, and factory authorized Field
Service Technicians with experience in completing work of similar or greater size and
scope. All fixtures, accessories, and equipment to be installed under the Work of this
section shall be purchased from an LSI for installation by the Electrical Contractor
providing the Work of this section (the installing Contractor). The LSI shall furnish a
complete working system to the Electrical Contractor, meeting the intent of this
specification. The LSI shall coordinate delivery schedules and installation of equipment
with the Electrical Contractor. Additionally, the LSI shall be responsible for all
documentation of the equipment in this section, system record drawings, final testing of
the system and training of the Owner's personnel as required by this specification.
F. "Furnish" - To deliver to the project (or other Contractor facility) equipment or materials for
installation by others.
G. "Install" - To receive equipment or materials and make them ready for use as part of the
finished project by physically mounting or otherwise securing them and electrically connecting
them to the appropriate service.
H. "Provide" - To furnish and install equipment or materials.
I. Technical terms peculiar to theatrical and/or architectural lighting and related work shall be
construed in the following order, in accordance with:
1. Captions on related drawings.
2. General recognized theatrical and/or architectural lighting usage.
3. Relevant usage and definitions of handbooks, guidebooks, or trade-group
recommendations by manufacturer's associations or professional and engineering
societies such as UL, ETL, IES, SMPTE, NEC, NEMA, and USITT.
1.3 SCOPE
A. Included in the work of this Section are labor, materials and appurtenances required to
complete the work of this Section, as specified herein, as required by job conditions, or as
indicated on drawings, including but not limited to general requirements for lighting fixtures
including coordination, definitions, quality assurances, submittals, samples, and general
responsibility for a complete job.
B. Due to the complexity of this project and the specific combination of equipment and services
required for a professional installation, all equipment in this specification shall be purchased
from an approved Lighting Systems Integrator.
C. This is a single source specification, one Lighting Control Systems Integrator shall be
responsible for furnishing all of the above described equipment, low-voltage (control) cable,
termination of low-voltage (control) cable at theatrical fixtures/devices, system startup, and
initial system programming system prior to Owner's possession.
D. The Lighting Systems Integrator shall furnish all above described equipment to the Electrical
Contractor for installation with the exception of theatrical lighting fixtures which shall be installed
by the LSI per plans.
E. The Lighting Systems Integrator shall be responsible for coordinating Ethernet and/ or serial
(RS-232) interconnection with AV, security, and/or building operations systems at the location
of the main lighting control equipment rack.
1. System provided shall include one each Ethernet and RS-232 connection point for this
purpose.
2. System provided shall include four each dry contact input and output connection points for
this purpose.
F. The Lighting Systems Integrator shall provide technician services to program the system with
ten (10) default presets to be determined by the Architect at time of startup.
265560 - Auditorium Lighting And Rigging
2
| AH&P / PBK Architects Georgia, P. C. | Whitewater High School - Renovations |
|---|---|
| PBK Project No. 240477 | Fayette County Schools |
| Addendum No. 5 | 2026-10-30 |
AH&P / PBK Architects Georgia, P. C. Whitewater High School - Renovations
PBK Project No. 240477 Fayette County Schools
Addendum No. 5 2026-10-30
G. The Lighting Control Systems Integrator shall coordinate the activation/ deactivation of the
above presets with base-building lighting and other systems as described above.
H. The Lighting Systems Integrator shall be responsible for supervising the installation of all
equipment furnished by the LSI. They shall provide the services of a local, full-time Project
Manager to schedule shipments of equipment, coordinate deliveries, answer system inquiries,
and generally oversee the installation of the equipment.
I. The Lighting Systems Integrator on behalf of and in conjunction with the Manufacturers whose
products are supplied under this specification shall provide the following services which are
further described in the remainder of this Section:
1. Verification of dimensions and conditions in contract documents prior to equipment
installation.
2. Schedule coordination and shipping to job site.
3. Termination of all low-voltage (control) cable.
4. Inspection and adjustment of completed installation by Factory Authorized personnel.
5. Five (5) sets of shop drawings and any required samples for approval by the Architect and
Electrical Engineer prior to release for fabrication.
6. Startup/ Turn-on/ Energization of the lighting control system, initial programming of lighting
control system and training on all components furnished under this section.
7. Installation of dimming/relay modules in racks and lighting control faceplates.
8. Coordination with installing Electrical Contractor and associated trades in the field.
9. Submission of record drawings, service and operational data, test certificates and
warranties Provide copies of all operations and maintenance manuals as specified in the
general conditions.
1.4 COORDINATION
A. Clearly indicate the Work to be performed by other trades contractors, and the materials that
are adjacent to or abutting the Work of this Section in any submittals and/or shop
drawings. Coordinate as required.
B. Fixture locations as indicated on the electrical drawings are generalized and
approximate. Carefully verify locations with the Architect/Engineer plans, reflected ceiling plans
and other reference data prior to installation. Check for adequacy of headroom and non-
interference with other equipment, such as ducts, pipes or openings. Bring conflicts to the
Architect/Engineer attention before proceeding with the work.
C. Although the location of equipment included in the Work of this Section may be shown on the
Contract Drawings in a certain place, actual construction may disclose that the location for the
Work does not make its position easily and quickly accessible. In such cases, call the
Architect/Engineer attention to this situation before installing this Work, and comply with their
installation instructions.
D. Give ample notice of special openings required for placing equipment in the building, in order to
avoid cutting of completed work.
E. Furnish the materials and labor for Work included under this Section in ample time, and in
sufficient quantities so that all of the Work may be installed in proper sequence.
F. Coordinate and schedule the Work of this Section with the Work of other Sections, Utility
Companies, etc... so that there shall be no delay in the proper installation and completion of
any part of each respective Work. Construction Work shall proceed in its natural sequence
without unnecessary delay caused by the Work of this Section.
G. Where Work of this Section is to be flush or concealed, install it to assure that it does not
project beyond the finished lines of floors, ceilings or walls.
265560 - Auditorium Lighting And Rigging
3

With GovernmentContracts, you can:
Follow Cross Over Network Waveguide Assembly Qualification and Production (P/Ns G638416-1) Active Contract
DEPT OF DEFENSE
Bid Due: 11/18/2026
Follow Repair/Overhaul of Flat Panel Up Front Controller (FPUFC) Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 11/25/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33658-NONST-2027-000000006
State Government of Georgia
Bid Due: 11/23/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77035-NONST-2027-000000047
State Government of Georgia
Bid Due: 11/19/2026