RFP: Blue Ridge Community College Spearman Remodel Restrooms

Location: North Carolina
Posted: Oct 7, 2026
Due: Nov 10, 2026
Agency: County of Henderson
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Title Bid/RFP Closing Date Bid/RFP Status Files View Bid Awarded To
RFP: Blue Ridge Community College Spearman Remodel Restrooms Tue 11/10/26
Open - accepting bids and proposals
View Details

Attachment Preview

Henderson County Capital Projects
100 North King Street, Project Management
__________________________________H_e_n_d_e_r_so_n_v_i_ll_e_, N__o_rt_h_ C_a_r_o_li_n_a_ 2_8_7_9_2______________
Memorandum To: Interested Qualified Bidders
From: Bryan Rhodes
Henderson County Capital Projects Director
Marshall Morris
Blue Ridge Community College Director of Capital Projects
Subject: Request for Proposals:
Blue Ridge Community College Spearman Remodel Restrooms
Date: October 7, 2026
Mandatory Attendance
Meeting w/Owner: October 20, 2026 @ 10:30 am
Spearman Building Lobby
150 East Campus Drive
Blue Ridge Community College
Flat Rock, NC 28731
Proposals are due: November 10, 2026 by 3:00 pm
Henderson County Government Offices
Attention: Bryan Rhodes
100 North King Street, Project Management
Hendersonville, NC 28792
Location of Work: Spearman Building
150 East Campus Drive
Blue Ridge Community College
Flat Rock, NC 28731
Last Day for Questions: October 27, 2026 at 4:00pm.
Questions must be received in written form by email or USPS letter
on or before, but NLT date indicated. Submit all questions to the
BRCC Project Coordinator: (Marshallm@blueridge.edu)

Henderson County Capital Projects
100 North King Street, Project Management
__________________________________H_e_n_d_e_r_so_n_v_i_ll_e_, N__o_rt_h_ C_a_r_o_li_n_a_ 2_8_7_9_2______________
Sealed hard copy bids will be received from bidders by Henderson County at the Henderson
County Government Offices, 100 North King Street, Project Manager Suite, Hendersonville, North
Carolina 28792 until November 10, 2026 @ 3:00 pm.
**Note** - It is the sole responsibility of the vendor that bids reach Henderson County, by
the designated date and time, indicated above.
Scope of Work:
GENERAL:
Henderson County requests proposals to provide a turnkey project inclusive of all but not limited to:
Labor and materials,
o
Taxes on materials and labor
o
Supervision
o
All generator and equipment rental
o
Barricading the work area
o
Dust protection
o
Permits and inspections
o
Disposal fees
o
This includes the entire scope of work to renovate the Spearman building restrooms on the campus
of Blue Ridge Community College, including but not limited to: demolition, plumbing, electrical,
ceiling grid and ceiling tiles, painting, epoxy floor, stall and urinal partitions, countertops,
sheetrock, concrete and construction cleaning. It is BRCC's intention for the appearance of the
finished renovation to mimic the College's restroom standards (see Patton building and Sink
building restrooms during the Pre-Bid site visit). Contractor is to meet or exceed all requirements
and specifications outlined in the RFP and mandatory pre-bid. Work area and equipment room to
be left in a clean and good condition
Work may start immediately pending HC's Notice to Proceed based with physical demolition and
construction starting on the following conditions:
Contractor MUST be in possession of all materials before work can start. BRCC's goal in
o
to reduce as much as possible the time required for the renovation.
Work must be 100% complete by January 30th, 2027. If the contractor is unable to meet
o
this deadline, then work cannot start until March 1st, 2027. BRCC has several large events
in February which will require being able to use ALL restrooms in the Spearman building.

Any exclusion from the Base bid's scope of work when the Contractor submits their bid may
result in rejection of the bid.

Henderson County Capital Projects
100 North King Street, Project Management
__________________________________H_e_n_d_e_r_so_n_v_i_ll_e_, N__o_rt_h_ C_a_r_o_li_n_a_ 2_8_7_9_2______________
Contractor must submit a timeline for beginning and completion of the project.
o
General:
Contractor to be given 24/7 access to the building during the project.
o
Any high noise work such as concrete saw cutting or jackhammering concrete may have to be
o
scheduled around classes. This may require this portion of the work to take place during evenings
or weekends.
Contractor to provide floor protection along the route used for removal of debris, hose for
o
concrete pumper truck and material delivery.
Contractor will be limited to the restroom work area.
o
Contractor is to provide dust control measures to prevent any dust from entering the
o
hallway, lobby. And the rest of the building.
Install all materials and equipment in accordance with manufacturer's instructions and
o
warranty requirements.
Contractor is to obtain and pay for any and all required permits and inspections.
o
Contractor will be responsible for all utility disconnections and reconnections including
o
gas, electrical, plumbing, HVAC, ductwork, fire alarm systems and Metasys.
Furnish the necessary supervision, labor, tools, equipment and materials to complete the
o
work outlined in the engineered drawings and pre-bid meeting.
Work schedule limitations to be coordinated with the Blue Ridge Community College
o
Project Coordinator.
The contractor will not be allowed to use College dumpsters. Construction dumpsters will
o
be the responsibility of the Contractor and at the Contractor's expense.
Contractor will provide traffic flaggers for any road or lane closures needed for delivery of
o
equipment or work to be done.
Daily Cleanup of all affected work areas and paths of entry and material delivery or
o
removal.
Any damage to buildings, walkways, pads, patios and foliage will be the responsibility of
o
the Contractor to repair or replace at their expense.
Any exclusion from the Base bid's scope of work when the Contractor submits their bid may
result in rejection of the bid.
Neither Henderson County nor Blue Ridge Community College will be a General Contractor
for this project. In all references, the "Contractor" refers to the company submitting a bid.
As such, the company submitting a bid will be responsible for ALL aspects of the scope of
work in the Base bid and any Alternates accepted by the Owner. The Contractor is
responsible for ALL aspects of the job required for a total, turnkey project.

Henderson County Capital Projects
100 North King Street, Project Management
__________________________________H_e_n_d_e_r_so_n_v_i_ll_e_, N__o_rt_h_ C_a_r_o_li_n_a_ 2_8_7_9_2______________
Liquidated damages of $500 per day will be applied, per day past the date of substantial
completion. Liquidated damages will be determined upon the Contractor's performance and
shall not be applied to any delays due to procurement of needed units or materials for this
project.
The Contractor is required to provide a 1 year written workmanship warranty.
o
The Contractor is required to provide a 2 year written workmanship warranty and a written
o
Single Source Warranty for the resinous floor.
Neither Henderson County nor Blue Ridge Community College will pay any "deposit". A
o
payment request for stored materials may be requested by the Contractor for delivered
project materials that have ben visually verified by a representative of Henderson County
or Blue Ridge Community College as being received by the Contractor and stored in a
bonded warehouse with accompanying receipt indicating the dollar amount of the
materials.
The Contractor will be responsible for conducting moisture testing or hiring an agency
o
certified in moisture testing and ensuring the use and application of products for such use.
All moisture mitigation required for proper bonding of the resinous floor system to the
o
concrete, prevent future blistering or separation, and to provide long lasting durability is to
be included in the Base bid.
Contractor will be responsible for all surface preparation prior to work starting to include
o
any required floor sweeping or vacuuming.
Project includes disposal of all debris and packing materials offsite at the Contractor's
o
expense. The contractor will not be allowed to use College dumpsters. Construction
dumpsters will be the responsibility.
The Contractor is required to include ALL generator and equipment rental costs in the Base
o
bid. The Contractor will be responsible for providing generator power for anything
requiring more than 120 volt electrical. Additionally, the Contractor is responsible for any
and all temporary wiring needed for completion of the project.
This is NOT considered a Capital Project. Neither Henderson County or Blue Ridge
o
Community College will sign an E-589CI or any other affidavit of Capital Improvement.
The Contractor is to include ALL taxes on materials and labor in his bid. It will not be

Henderson County Capital Projects
100 North King Street, Project Management
__________________________________H_e_n_d_e_r_so_n_v_i_ll_e_, N__o_rt_h_ C_a_r_o_li_n_a_ 2_8_7_9_2______________
Henderson County or the Blue Ridge Community College's responsibility to pay any taxes
on material or labor.
Job Specifics:
TECHNICAL SPECIFICATIONS
* 2 Stage Construction:
It is BRCC's intent that the restrooms be closed for a minimal amount of time.
o
The contractor is to have all materials on hand before starting renovations. This
includes stall partitions, doors and casework.
If Alternate #1 Auto Body Restrooms Epoxy Floor is accepted, under NO
o
conditions will the contractor be permitted to this Alternate until Phase #1 is
100% complete.
* Provide permit and inspection fee for scope of work. It will be the contractor's
responsibility to schedule all inspections and provide inspection reports to the BRCC
Capital Project Coordinator.
* Contractor will be responsible for installation of any plumbing isolation valves required
for turning water off to the individual restrooms to allow water to the rest of the building.
Installation of these isolation valves will take place after BRCC's normal operating
hours.
* BRCC retains salvage rights to any toilets, urinals, flush valves, faucets and grab bars. It
will be the contractor's responsibility to remove and dispose of any such items not
claimed by BRCC.
* Restroom Toilet Stall Compartments (Partitions, Doors and Pilasters)
Formica Laminate 8844-58 Aged Ash Matte Texture (NO SUBSTITUTIONS)
Known source for the partitions and dividers:
o
Premier Doors and Hardware
Jon Robertson
Jrobertson@premierdoorsandhardware.com
828-242-2305

Henderson County Capital Projects
100 North King Street, Project Management
__________________________________H_e_n_d_e_r_so_n_v_i_ll_e_, N__o_rt_h_ C_a_r_o_li_n_a_ 2_8_7_9_2______________
Contractor to note that the toilet partition panels and partition doors are to be 6'.
o
Mounting height: 7" from floor to bottom of panel and 79" to top of divider panel
(Higher than existing dividers in the Spearman restrooms).
High Pressure Laminate Formica
o
Toilet-Enclosure Style: Overhead braced.
Provide minimum 3/4-inch- thick doors and pilasters and minimum 1/2-
inch- thick panels.
Pilaster Shoes: Formed from stainless-steel sheet, not less than 0.031-inch
nominal thickness and 3 inches high, finished to match hardware.
Brackets (Fittings): Full-Height (Continuous) Type: Manufacturer's
standard design; stainless steel
Overhead Bracing: Manufacturer's standard continuous, extruded-
aluminum head rail with anti-grip profile and in manufacturer's standard
finish.
Hinges: Manufacturer's minimum 0.062-inch- thick stainless-steel paired,
self-closing type that can be adjusted to hold doors open at any angle up to
90 degrees, allowing emergency access by lifting door. Mount with
through-bolts. Doors to be installed to swing outward.
Latch and Keeper: Manufacturer's heavy-duty surface-mounted cast-
stainless-steel latch unit designed to resist damage due to slamming, with
combination rubber-faced door strike and keeper, and with provision for
emergency access. Provide units that comply with regulatory requirements
for accessibility at compartments designated as accessible. Mount with
through-bolts.
Door Bumper: One door bumper with associated fasteners.
Door Pull: One door pull with associated fasteners.
Surface-mounted Coat Hook and Bumper: Basis of Design Product:
Grainger, Model #1ECL2
* Urinal Dividers
Formica Laminate 8844-58 Aged Ash Matte Texture (NO SUBSTITUTIONS)
o
Contractor to note that the urinal panels are to be 58". Mounting height: 7" from
o
floor to bottom of panel and 65" to top of divider panel (Higher than existing
dividers in the Spearman restrooms).
High Pressure Laminate Formica
o
Style: Wall hung
o
Minimum 1/2-inch- thick panels.
o
Brackets: Full-Height (Continuous). Manufacturer's standard design; stainless
o
steel.
* Toilets:
Floor mounted, bottom outlet, top spud.
o

Henderson County Capital Projects
100 North King Street, Project Management
__________________________________H_e_n_d_e_r_so_n_v_i_ll_e_, N__o_rt_h_ C_a_r_o_li_n_a_ 2_8_7_9_2______________
Basis-of-Design: American Standard, Madera 3461.001. (Subject to compliance
o
with requirements)
Material: Vitreous china
o
Type: Siphon jet
o
Style: Flushometer valve.
o
Height: Handicapped/elderly, complying with ICC/ANSI A117.1
o
ADA compliancy in ADA stall
o
Rim Contour: Elongated.
o
Water Consumption: 1.28 gal. per flush.
o
Spud Size and Location: NPS 1-1/2; top.
o
Color: White.
o
* Toilet Flush Valves
Exposed automatic motion sensor with button for manual operation.
o
To be hardwired, not battery operated.
o
To have split ring pipe supports
o
Adjust sensitivity for proper operation
o
* New Toilet Seats
Manufacturers include, but are not limited to the following: Bemis
Manufacturing Company, Bemis Manufacturing Company, Kohler Co.
Material: Plastic. Type: Commercial (Heavy duty).
Shape: Elongated rim, open front.
Hinge: Self-sustaining, check. Material: Non-corroding metal.
Color: White.
Caulk: High quality mildew resistant
* Grab Bars:
Bobrick Washroom Equipment, Inc.; Model B-5806.99
Mounting: Flanges with concealed fasteners.
Material: Stainless steel, 0.05 inch thick. a. Finish: Smooth,
Finish (satin) on ends and slip-resistant texture in grip area.
Outside Diameter: 1-1/4 inches.
Configuration and Length: As required for ADA compliancy.
* Urinals:
Basis-of-Design Product: American Standard, Washbrook 6590
o
Material: Vitreous china.
o
Type: Washout with extended shields.
o
Water Consumption: Low.
o
Color: White.
o
Caulk: High quality mildew resistant.
o

Henderson County Capital Projects
100 North King Street, Project Management
__________________________________H_e_n_d_e_r_so_n_v_i_ll_e_, N__o_rt_h_ C_a_r_o_li_n_a_ 2_8_7_9_2______________
* Urinal Flush Valves:
Exposed automatic motion sensor with button for manual operation.
o
To be hardwired instead of battery operated.
o
To have split ring pipe supports.
o
Adjust sensitivity for proper operation
o
* Countertops:
Corian Solid Surface countertop in Neutral Concrete with 3" integrated front skirt,
o
covered backsplash with matching side splash and unfinished sink cutouts (No
substitutiions)
Countertops to have heavy duty wall brackets that will be mounted to the studs for
o
extra strength and wall cleats for additional strength.
Known source for countertops:
o
Nova Kitchen and Bath
305A Airport Rd.
Arden, NC 28704
828-687-8770
* Countertop Sinks:
Oval, vitreous china, self rimming
o
For undercounter mounting
o
Nominal size: Oval 17 12" x 20 14" inches.
o
Color: white
o
Mounting material: Sealant
o
Install protective shielding pipe covers and enclosures on exposed supplies and
o
waste piping of lavatories.
* Lavatory Faucets:
Touchless faucets with automatic motion sensor and temperature mixing water
o
valve
Sensors to be hardwired instead of battery operated.
o
Supply Lines: Flexible chrome plated copper risers and chrome plated stops.
o
* Lavatory P-Trap and supply line Covers:
All P-traps and supply lines to have white, vinyl P-trap covers such as ProFlow
o
Faucet with standard gooseneck with automatic motion sensor and temperature
mixing water valve
To be hardwired instead of battery operated.
o
* Hose Bib:
Existing hose bib to be replaced with new
o

Henderson County Capital Projects
100 North King Street, Project Management
__________________________________H_e_n_d_e_r_so_n_v_i_ll_e_, N__o_rt_h_ C_a_r_o_li_n_a_ 2_8_7_9_2______________
* Floor Grates:
The contractor will be responsible for adjusting the height of the floor grates to
o
the new elevation of the finished epoxy floor.
It is the College's intent that the grates have the appearance of new. The
o
contractor is to either clean and polish the existing, or replace with new. It is the
contractor's choice based on which option he determines is the most cost
effective.
* Existing Ceramic Tile Walls:
Remove ceramic tile and sheetrock to studs
o
Painted walls to have 5/8" moisture resistant, mold resistant sheetrock and finish.
o
Tile accent walls to have the appropriate substrate for the tile
o
* Concrete
All concrete for under slab plumbing modifications to be sawcut.
o
Concrete patches to be doweled
o
Finished elevations to be smooth with existing slab. It is BRCC's intension that
o
when the floors are epoxied, any patches will not be visible.
* Ceiling Tiles
Replace entire ceiling grid with new and convert to 2'x2' grid.
o
Contractor to note that the existing sheetrock ceilings in what are presently the
o
showers will be removed and will be converted to ceiling tiles.
Install new 2'x2' ceiling tiles
o
USG Olympia Micro Acoustic Panels,
o
Item Number: 4221
Size: 2'x2'x5/8"
Edge: SLT
Color: Flat White 050
Anti-Mold and Mildew: Yes
NRC: .50
Fire Rating: Class A
* Recessed Trash Can Modifications:
Eliminate existing combination stainless steel trash can/paper towel dispenser.
o
Make repairs and any modifications needed to alcove due to removal of the old
o
combination trash can/paper towel dispenser and installation of the new.
Provide and install new recessed stainless steel trash cans.
o

Henderson County Capital Projects
100 North King Street, Project Management
__________________________________H_e_n_d_e_r_so_n_v_i_ll_e_, N__o_rt_h_ C_a_r_o_li_n_a_ 2_8_7_9_2______________
* Mirrors:
Existing individual mirrors at sinks to be replaced with 1 mirror approximately 9'
o
wide x 38" tall with aluminum metal frame on all 4 sides.
Manufacturers: Avalon Glass and Mirror Company, Binswanger Glass, Donisi
o
Mirror Company, D & W Incorporated, Gardner Glass Products, Inc., Glasswerks
LA, Inc., Guardian Industries Corp., Independent Mirror Industries, Inc., Lenoir
Mirror Company, National Glass Industries, Trulite Glass & Aluminum Solutions,
Virginia Mirror Company, Inc., Walker Glass Co., Ltd.
Mirror Quality, clear.
o
Nominal Thickness: 6.0 mm.
o
ASTM C 1503; manufactured using copper-free, low-lead mirror coating process.
o
Edge Sealer: Coating compatible with glass coating and approved by mirror
o
manufacturer for use in protecting against silver deterioration at mirrored glass
edges. C.
Mirror Mastic: Produced specifically for setting mirrors and certified by both
o
mirror and mastic manufacturer as compatible with glass coating and substrates
on which mirrors will be installed.
Special Warranty: Contractor and manufacturer agree to replace mirrors that
o
deteriorate within specified 5 year warranty period from project completion.
Deterioration of mirrors is defined as defects developed from normal use that are
not attributed to mirror breakage or to maintaining and cleaning mirrors contrary
to manufacturer's written instructions. Defects include discoloration, black spots,
and clouding of the silver film. Warranty Period: Five years from date of Project
completion.
* Electric
Replace all outlets and cover plates with new (white) GFIC where required.
o
Replace all switches and cover plates with new (white)
o
Existing Metasys control to be reused. Contractor to be responsible for
o
disconnections and reconnections of the wiring.
* Lights:
Add LED recessed downlight lights at the sink area. Lights to be centered in
o
ceiling tiles.
The existing LED lights to be reused and relocated per lighting layout. Contractor
o
to provide any new, additional LED light fixtures as required for the lighting
layout.
Wall mounted fluorescent lights over the sinks to be eliminated and in their place,
o
contractor to install LED downlights centered over each sink and to be centered in
the 2'x2' ceiling tile.
* Emergency Lights
Replace with new dual head LED
o

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow DEVCOM ARMY RESEARCH LABORATORY BROAD AGENCY ANNOUNCEMENT FOR FOUNDATIONAL RESEARCH Active Contract

DEPT OF DEFENSE

Bid Due: 11/20/2027

Follow DEVCOM ARMY RESEARCH LABORATORY BROAD AGENCY ANNOUNCEMENT FOR FOUNDATIONAL RESEARCH Active Contract

DEPT OF DEFENSE

Bid Due: 11/20/2027

Follow DEVCOM ARMY RESEARCH LABORATORY BROAD AGENCY ANNOUNCEMENT FOR FOUNDATIONAL RESEARCH Active Contract

Federal Agency

Bid Due: 11/20/2027

Bid Title: ITB: Ocean Ridge Reclaimed Waterline Category: Public Utilities Status: Open Description:

Brunswick County

Bid Due: 11/19/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.