| Location: | Utah |
|---|---|
| Posted: | Apr 24, 2026 |
| Due: | May 14, 2026 |
| Agency: | Tooele city |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Description | Opening Date/Time | Closing Date/Time |
|
Seventh Street Storm Drain Improvements (500 North to Birch) Work of this Construction Contract comprises the installation of approximately 2,125 linear feet of new 30-inch, 18-inch and 15-inch diameter concrete pipe, 11 storm drain inlets and junction boxes, 10 storm drain manholes; removal and replacement of 12 culinary water services and 3 fire hydrants; 21,150 square feet of asphalt removal and repair and related appurtenances. |
April 24, 2026 10:00 AM |
May 14, 2026 2:00 PM |

With GovernmentContracts, you can:
...reinforced concrete pipe, 64' of 18-inch reinforced concrete pipe, 104 feet of 15-inch ...
State Government of Utah
Bid Due: 6/16/2026
...of epoxy lined and coated 20-inch steel pipe connection to a 42-inch JVWCD ...
State Government of Utah
Bid Due: 7/07/2026
...Storm Drain Pipe with 72" Storm Drain Manholes on 2000 S from Geneva ...
State Government of Utah
Bid Due: 6/11/2026
...PVC C900 pipe and appurtenances near Richardson Flat Road in Park City. All ...
State Government of Utah
Bid Due: 6/25/2026