| Location: | Saskatchewan |
|---|---|
| Posted: | Jul 16, 2025 |
| Due: | Aug 6, 2025 |
| Agency: | Parkland County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQ No. Q250710EN |
| Publication URL: | To access bid details, please log in. |
Project Description: This Request for Quotations (the “RFQ”) is an invitation by Parkland County (the “County”) to prospective respondents to submit their responses to this RFQ (“Quotation”) 255 Street (Township Road 530A) Water Line Extension, as further described in Section A of the RFQ Particulars (Appendix A) (the “Deliverables”).
The water line to be constructed is approximately 1,000 metres in length. It will start south of Highway 16A, cross the highway right-of-way by way of directional drilling, continue along 255 Street (Township Road 530A) by way of open-cut to connect to the existing water line near the Acheson Zone 4 Reservoir south of Acheson Road.
The scope of work includes, but is not limited to, trench excavation, water line installation, granular base placement and asphalt paving, and other works as described in this document.

With GovernmentContracts, you can:
...Competition Name Organization Name Competition # Open Date Close Date Status Directional Drilling... ...
Government of Saskatchewan
Bid Due: 7/02/2026