INTRODUCTION
Hope Center for Children (HCFC) is seeking proposals from firms that provide the services and oversight to
update and upgrade two fire systems (which are independent of one another), including sourcing and
purchase of materials, installation, and testing each located at:
200 Hudson L. Barksdale Blvd, Spartanburg, SC 29306 (Faucette House)
241 Cedar Springs Rd., Spartanburg, SC 29302 (Lindsay House)
Note: The project for Hope Center for Children will be funded by a Community Development Block Grant
(HUD) and therefore required to follow federal guidelines, including, but not limited to, Section 3 and the
Davis Bacon Act. To be considered, each primary contractor must be registered with SAM.GOV with a
current Unique Entity ID. Weekly payrolls must be submitted to HCFC including appropriate information
for each worker during the extent of the project.
SCHEDULE
RFP Release
Pre–Bid Meetings (see note below)
Sealed Proposals Due
Public Opening of Proposals
Follow-Up Questions with firms
Final Notifications
Pre-Construction Meeting
Project Begins
Thursday, June 4, 2026
*Wednesday June 24, 2026, 9 a.m. – 11:00 a.m. and
*Thursday, June 25, 2026, 2:30 p.m. – 4:00 p.m.
Wednesday, July 1, 2026, 1:00 p.m.
Wednesday, July 1, 2026, 1:15 p.m.
Wednesday, July 8, 2026
Wednesday, July 22, 2026
Tuesday, August 4, 2026
August 2026 (within 30 days of contract finalization)
*Firms must email Beth Ecxford, Facilities and Safety Supervisor at bexcford@hopecfc.org and set up a
time slot for your firm during the above-listed timeframes. Slots will be assigned on a first-come, first-
served basis. Firms are asked to bring no more than two representatives for their scheduled pre-bid
meeting. Attendance of a pre-bid meeting on one of the above-listed dates is recommended.
SCOPE OF PROJECT
The project will be an upgrade of key fire systems in two different locations, each independent of the
other. All components will be identified in the Specifications section below. The firm will ensure the
sourcing, installation, and testing of all components that will meet all applicable local city and county fire
codes.
SPECIFICATIONS
Lindsay House Fire System Project:
System upgrade to include:
1 6 amp Power Supply with 5 outputs
14 Two-Zone Expanders
40 Photoelectric Smoke Detectors
4 System Sensors – 4 wire Photo Electric Duct Smoke Detectors (Low Flow)
4 Duct Smoke Sampling Tube (3’)
4 Remote Test Station used to initiate the NFPA Sensitivity Test Function
10 Indoor Low Frequency Compact Sounders (2-wire, wall mount) – to be placed in sleeping rooms
Existing heat detectors, horns and strobes to remain in place
Existing fire panel to remain and be utilized with new devices
Faucette House Fire System Project:
System upgrades to include:
7 System Sensors – Fixed Temperature and Rate of Rise Thermal Detectors
76 System Sensors – Photoelectric Smoke Detectors
11 Addressable Monitor Modules, 4 Sq. W/LED
2 Dual Monitor Modules, 4 Sq. W/LED
9 Pull Stations, Double Action w/key
Existing heat detectors above ceiling to be abandoned in place
Existing fire panel to remain and be utilized with new devices
If you would like to schedule a facility walk-through of either site prior to submission, please contact Beth
Ecxford at (becxford@hopecfc.org). Work hours will be between 7:00am and 4:00pm each day. Clean up
required each day - this is an occupied facility and needs to be in good, safe working order at the end of
each day. This is a design build project and it will be the contractor’s responsibility to hire a fire protection
engineer if needed.
INSTRUCTIONS FOR RESPONDENTS
1. Recommended pre-bid meeting(s) will be held at the project site from 9:00 a.m. – 11:00 a.m. on
Wednesday, June 24, 2026, and again from 2:30 p.m. – 4:00 p.m. Thursday, June 25, 2026,
Firms must contact Beth Ecxford at (becxford@hopecfc.org) to schedule attendance during
these timeframes. It is strongly recommended to attend a pre-bid meeting.
2. Firms desiring to provide services shall submit their response to this Request for Proposals (RFP)
in a sealed envelope. Responses must be *received no later than 1:00 p.m. (EST), Wednesday,
July 1, 2026, to the attention of:
In Person:
Beth Ecxford, Facilities and Safety Supervisor
202 Hudson L. Barksdal Blvd.
Spartanburg, SC 29306
By Mail:
Beth Ecxford, Facilities and Safety Supervisor
PO Box 1731
Spartanburg, SC 29304
*Proposals may be delivered in person or mailed to our offices.
3. Respondents must indicate on the outside of their sealed response envelope the following
information: Date of Submittal, Name of Firm, Return Address of Firm.
4. The respondent must provide three (3) copies, unbound, of the full proposal.
5. Lump sum proposal price must include the amount of ALL FEES charged by the Respondent.
Proposals that do not include all fees will be rejected.
6. Lump sum proposal price must include the amount of ALL TAXES, including any South Carolina
state sales tax and any use tax which may be owed by Spartanburg County as a result of this
Proposal. Proposals that do not include all taxes will be rejected.
7. Lump sum proposal price must include ALL COSTS OF TRANSPORTATION AND DELIVERY to the
required destination. Proposals that do not include all costs of transportation and delivery will
be rejected.
8. The respondent shall assume full responsibility for timely delivery at the location designated
above. HCFC assumes no responsibility for the delivery of any solicitation, addendum, solicitation
response, or any other such correspondence by the US Postal Service, or any other delivery
method. Responses received after the due date and time stated above will not be considered.
9. Questions concerning the RFP must be directed to Beth Ecxford via email at
becxford@hopecfc.org and must be received no later than 1:00 p.m., Friday, June 26, 2026.
All questions will be aggregated into a single document and answers will be sent to each firm
that attends a pre-bid meeting.
PROPOSAL CONTENT
1. Qualifications of the Firm: Describe experience with projects similar in size, scope, and complexity
with emphasis on relevant services experience.
2. Knowledge of the Field: Respondent should demonstrate its knowledge of local conditions, local
codes (especially as related to DSS standards), and local suppliers as an indication of its ability to
create a prospective maximum project cost.
3. Proposed Pricing: Proposed cost of project completion and a method for determining same.
4. Experience with Federal Grants: demonstrate the ability to adhere to Davis–Bacon federal
reporting requirements and wage determination (timesheets, invoicing, etc.). The firm must be
registered (or willing to be) and in good standing with the SC Secretary of State.
5. Related Experience: list projects that best illustrate the experience of the firm and staff who will
be assigned to this project. List no more than five (5) projects that were completed in the last
five (5) years, and include only projects in South Carolina of a similar size and scope. For each
project, please provide the following:
Name and location of the project
Nature of the firm’s responsibility on this project
Provide the name, phone number, and email of an Owner’s representative who
can be contacted to provide a reference.
Size of project (dollar value and square footage)
Construction cost
Current status of the project; include the start date and [anticipated] completion date
Key professional(s) involved in the listed project who would be assigned to this contract
6. Construction Manager Services Staff: The firm should name the actual Project Manager and other
key staff assigned to this Contract; please include the following:
Name & Title
Current assignments
Years with the firm or in the industry
Experience with similar projects
Education and registrations
Other relevant information for this contract
7. Project Management Services: Detail the capabilities of your firm to provide the technical services
necessary for the project. Include knowledge and experience in the evaluation of building
systems and construction techniques to create an optimum value in the design and budget
requirements.
8. Discuss your firm’s current workload and ability to begin the Hope Center for Children’s
project within 30 days of contract finalization. Please include an estimated timeline for the
project from the beginning through the anticipated completion date.
9. Identify the supply company that the firm will use for identifying and purchasing materials as
applicable.
10. Claims and Litigation History: list all claims, arbitrations, administrative hearings, lawsuits, or
criminal proceedings brought by or against the firm during the last five (5) years. Please include
the project name, a description of the amount in dispute, and the subject matter of the
dispute.
EVALUATION CRITERIA
1. Project Timeline: Please estimate the timeline from the project beginning to final inspection;
include time for permitting, any expected delays in materials, etc. The Firm must be able to
begin the project within thirty (30) days of the signed agreement.
2. Competitiveness of project cost.
3. Professional Qualifications and Experience of the Firm