| Location: | Federal |
|---|---|
| Posted: | Apr 7, 2025 |
| Due: | May 22, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | SDA-PS-25-02 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Space Development Agency (SDA) is issuing this Other Transaction Authority (OTA) solicitation for a prototyping effort of the Proliferated Warfighter Space Architecture (PWSA) Tranche 3 (T3) Tracking Layer (T3TRK). T3TRK prototyping effort will accelerate the capability to provide global, persistent indications, detection, warning, tracking, and identification of conventional and advanced missile threats, including hypersonic missile systems. The T3 Tracking Layer will also demonstrate a missile defense capability. The T3 Tracking Layer scope includes the procurement and deployment of an anticipated minimum of 54 space vehicles (SVs) with infrared (IR) sensors, in six (6) orbital planes. Additional prototyping of satellites and sensor payloads may also occur under this OT in order to inform requirements and constellation design. The fully deployed Tracking Layer is estimated to include more than 100 SVs in Low Earth Orbit (LEO) across multiple planes. See the attachments for additional details and instructions on how to request Controlled Unclassified Information (CUI) and classified reference documents associated with the solicitation.
Please note - the Government will not be posting a Comment Resolution Matrix (CRM) for this solicitation.
| Apr 28, 2025 | [Solicitation (Updated)] Proliferated Warfighter Space Architecture Tranche 3 Tracking Layer (T3TRK) |
| Apr 29, 2025 | [Solicitation (Updated)] Proliferated Warfighter Space Architecture Tranche 3 Tracking Layer (T3TRK) |

With GovernmentContracts, you can:
...to identify potential sources for a sensor system capable of tracking both outbound ...
DEPT OF DEFENSE
Bid Due: 7/01/2026
...sources for a sensor system capable of tracking both outbound projectiles (7.62mm, .50 ...
DEPT OF DEFENSE
Bid Due: 7/01/2026
...friendly force tracking system, equipping soldiers with a faster satellite network, secure data ...
DEPT OF DEFENSE
Bid Due: 7/07/2026