| Location: | California |
|---|---|
| Posted: | Jul 15, 2025 |
| Due: | Jul 31, 2025 |
| Agency: | City of Palo Alto |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Gas Main Replacement Project 25
Addenda: 4
Release Date: 6/26/2025
Due Date: 7/31/2025
The Gas Main Replacement Project 25 is aiming to replace approximately 25,600 linear feet of gas main pipelines with diameter of 2-inch, 4-inch, and 6-inch. The replacement includes installation of gas main pipelines under Matadero Creek and Barron Creek along Ross Road with Polyethylene (PE), natural gas service pipelines made of PVC, BWP, or undersized Polyethylene (PE), and the reconnection of natural gas service pipelines. This project was selected and awarded with a federal grant by the Department of Transporation for Natural Gas Distribution Infrastructure Safety and Modernization.

With GovernmentContracts, you can:
...Project: On-Call Airport Engineering, Design, and Architectural (A/E) Consulting Services (2026... inclusion on ...
Ventura County
Bid Due: 6/17/2026
..., and establishing the Badger Advance Meter Infrastructure Software (Beacon Saas). Copies of ...
City of Turlock
Bid Due: 6/22/2026
..., and establishing the Badger Advance Meter Infrastructure Software (Beacon Saas). Copies of ...
City of Turlock
Bid Due: 6/22/2026
...Partner No Contact Organization City of Los Angeles Department Engineering Bureau, Public Works ...
City of Los Angeles
Bid Due: 7/01/2026