| Location: | Florida |
|---|---|
| Posted: | Jul 16, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA441725C0010 |
| Publication URL: | To access bid details, please log in. |
The 1st Special Operations Contracting Squadron, Hurlburt Field, FL has made an award for the subject contract to Reasor Building Group, LLC. Work Includes Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131 in accordance with project CP 1032233. Posted for early read-ahead for potential offerors to develop Requests for Information prior to established timelines identified in the final solicitation. Project Description: Repair - Interior Renovation Bldg 90131. Project CP1032233. The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131. Constructed of structural steel beams/purlins, structural steel columns, and a composite floor system consisting of normal weight concrete on metal deck. The steel columns will require new shallow foundations. Replacement of the slab-on-grade at the foundations will consist of 5-inch-thick minimum reinforced concrete. Architectural: Demolition includes complete demolition of existing toilet rooms, central 2-story office pylon, trolley hoist system including beams and columns and some slab demolition. New work includes work on the first-floor additional restrooms, briefing room, break room, open office area, private offices, fitness room, personnel lockers, and 2 resting/bunk rooms. Interior finish systems include suspended acoustical tile ceilings, painted gypsum board on metal studs, new break room casework, and new toilet rooms with showers. Interior Design: Include interior finishes consist of no-wax, luxury vinyl tile flooring; modular carpet tile in the Open Office, Admin and Rest areas; thermoset rubber wall base; porcelain tile floors and walls in the Locker and Restrooms; Ceilings are open to structure or suspended acoustical tiles; Signage shall be modular, acrylic with printed paper inserts.

With GovernmentContracts, you can:
...Description: Carlin Park Lifeguard Building-Interior Renovations (RE-BID) Department: Facilities...
Palm Beach County
Bid Due: 1/06/2030
...Project ID: Title: Interior Renovations at Larry R. Jackson Branch Library Addenda: 0 ...
City of Lakeland
Bid Due: 6/18/2026
...in providing professional construction services for renovation of the Renaissance Center Cashier's Office... ...
City of Tallahassee
Bid Due: 6/11/2026
...Project ID: Title: Alachua County Sunrise Inn Renovation and Modernization - Phase 1 ...
Alachua County
Bid Due: 6/10/2026